Proprietary data
Data Center Power & Policy in Japan
Every government action on data centers and power in Japan that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 8 October 2026, DC Market Insights tracks 9 government actions on data centers and power in Japan, 7 of them in force. We have found no moratorium or restriction on new data centers in force in Japan.
Market snapshot
Japan power and policy: key facts
- Renewable share of electricity generation: 23.1% (2024). Rank 30 of 42 tracked countries, highest first.
- Grid emission factor: 0.45 kgCO2/kWh (2024). Rank 11 of 36 tracked countries, highest first.
- Latest change: OCCTO Aggregation of Electricity Supply Plans FY2026: demand outlook citing data centres (Organization for Cross-regional Coordination of Transmission Operators (OCCTO), 5 Aug 2026).
- By type: 6 plan or strategy, 2 efficiency rule and 1 grid access.
Power indicators for Japan
Latest official figure for each indicator, with earlier years where we have them.
In force now in Japan
Efficiency rule (2)
Energy Conservation and Non-Fossil Energy Conversion Act: PUE standard for new data centres built from FY2029
As part of the data centre measures in force from 1 April 2026, data centres newly built in FY2029 or later must meet an energy efficiency standard of PUE 1.3 or below two years after starting operation.
1.3 PUE limit (new DCs) Applies to DCs newly built from FY2029, two years after start of operation
Energy Conservation and Non-Fossil Energy Conversion Act: benchmark for the data centre industry (データセンター業に係る措置)
Under the benchmark system, data centre operators with annual energy use of 1,500 kl crude-oil equivalent or more must work toward an operator-average PUE of 1.4 or below by target year FY2030, with PUE calculated per JDCC guidelines; additional reporting items apply from FY2026. The measures took effect on 1 April 2026.
1.4 PUE target (operator average, FY2030) Target year FY2030; applies to operators with DC energy use >=1,500 kl/yr crude-oil equivalent
Plan or strategy (5)
OCCTO Aggregation of Electricity Supply Plans FY2026: demand outlook citing data centres
OCCTO's FY2026 aggregation of supply plans (published 5 August 2026) forecasts August peak demand of 159.63 GW for FY2026 and 164.60 GW for FY2035, and attributes demand growth to economic growth and new data centres and semiconductor factories.
164.6 GW peak demand forecast FY2035 Table 1-6: 16,460 x10^4 kW sending end, +0.4% average annual growth
Basic Policy on Economic and Fiscal Management and Reform 2025 (経済財政運営と改革の基本方針2025): watt-bit collaboration and data centre dispersion
Cabinet decision of 13 June 2025 commits to promote watt-bit collaboration as infrastructure for GX industrial siting, developing power and telecom networks in a coordinated, planned way and promoting the regional dispersion of data centres.
GX2040 Vision (GX2040ビジョン~脱炭素成長型経済構造移行推進戦略 改訂~): data centre siting and watt-bit collaboration
Cabinet-approved GX2040 Vision (18 February 2025) notes data centres are concentrated in the Tokyo and Osaka areas, calls for regional dispersion, sets out power-telecom coordination (watt-bit collaboration), and says the government will study guiding data centre siting to locations near planned power infrastructure including decarbonised sources.
7th Strategic Energy Plan (第7次エネルギー基本計画): electricity demand growth from data centres
The 7th Strategic Energy Plan, approved by Cabinet on 18 February 2025, states that from FY2024 electricity demand is expected to turn upward through FY2034 due to economic growth and new and expanded data centres and semiconductor plants, and cites generative-AI-driven data centre growth as a demand driver.
Outlook for Energy Supply and Demand in FY2040 (2040年度におけるエネルギー需給の見通し): data centre demand
ANRE reference material accompanying the 7th Strategic Energy Plan projects FY2040 electricity demand of about 0.9-1.1 trillion kWh and generation of about 1.1-1.2 trillion kWh, with renewables at about 40-50%, and states that a large expansion of data centre power demand may require generation to rise substantially. (source gives month only)
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
7th Strategic Energy Plan: steering large data centre demand to sites near decarbonised power with proactive grid build-out
The plan states the government will study a mechanism to steer large demand such as data centres to suitable sites, including near decarbonised power sources, and to promote proactive, planned grid development to keep supply stable. The mechanism is stated as under study.
Timeline of data center and power policy in Japan
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 5 Aug 2026 | OCCTO Aggregation of Electricity Supply Plans FY2026: demand outlook citing data centres | Plan or strategy | In force | Organization for Cross-regional Coordination of Transmission Operators (OCCTO) |
| 1 Apr 2026 | Energy Conservation and Non-Fossil Energy Conversion Act: PUE standard for new data centres built from FY2029 | Efficiency rule | In force | Agency for Natural Resources and Energy (METI), Energy Conservation Division |
| 1 Apr 2026 | Energy Conservation and Non-Fossil Energy Conversion Act: benchmark for the data centre industry (データセンター業に係る措置) | Efficiency rule | In force | Agency for Natural Resources and Energy (METI), Energy Conservation Division |
| 13 Jun 2025 | Basic Policy on Economic and Fiscal Management and Reform 2025 (経済財政運営と改革の基本方針2025): watt-bit collaboration and data centre dispersion | Plan or strategy | In force | Cabinet Office (Cabinet decision) |
| 18 Feb 2025 | GX2040 Vision (GX2040ビジョン~脱炭素成長型経済構造移行推進戦略 改訂~): data centre siting and watt-bit collaboration | Plan or strategy | In force | Cabinet Secretariat (GX Implementation Council); Cabinet decision |
| 18 Feb 2025 | 7th Strategic Energy Plan: steering large data centre demand to sites near decarbonised power with proactive grid build-out | Grid access | Announced | Agency for Natural Resources and Energy (METI); Cabinet decision |
| 18 Feb 2025 | 7th Strategic Energy Plan (第7次エネルギー基本計画): electricity demand growth from data centres | Plan or strategy | In force | Agency for Natural Resources and Energy (METI); Cabinet decision |
| 1 Feb 2025 | Outlook for Energy Supply and Demand in FY2040 (2040年度におけるエネルギー需給の見通し): data centre demand | Plan or strategy | In force | Agency for Natural Resources and Energy (METI) |
| 23 Dec 2022 | Digital Garden City Nation Comprehensive Strategy (デジタル田園都市国家構想総合戦略): regional data centre hubs | Plan or strategy | Expired | Cabinet Secretariat (Cabinet decision) |
How Japan compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Japan?
We have found no moratorium or restriction on new data centers in force in Japan as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.
How much of Japan’s electricity is renewable?
Renewables supplied 23.1% of electricity generation in Japan in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity does Japan have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.
