Proprietary data
SoftBank Data Centers
Data centers operated by SoftBank that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 11 data centers operated by SoftBank in 2 countries, of which 8 are operational. Stated operational capacity is 100 MW, with a further — under construction and 150 MW planned. The pipeline is 1.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 3 of 11 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
SoftBank data centers: key facts
- Capacity under construction or planned (150 MW) is 1.5 times the operational base of 100 MW.
- Its largest operational site is Nara Ikoma Data Center in Ikoma, Japan at 50 MW.
- The largest project in the pipeline is Sakai AI Data Center (former Sharp Sakai plant) by SoftBank (150 MW, planned).
- Japan accounts for 100% of tracked capacity (10 facilities).
- By type, the tracker lists 8 colocation and 3 hyperscale facilities.
- 3 of 11 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
SoftBank development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 150 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Sakai AI Data Center (former Sharp Sakai plant)SoftBank | Sakai, Japan | Planned | Hyperscale | 150 MW |
Facilities
11 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Sakai AI Data Center (former Sharp Sakai plant)Hyperscale
History
|
Sakai, Japan | Planned | 150 MW total | — | Operator / official |
| Nara Ikoma Data CenterColocation | Ikoma, Japan | Operational | 50 MW total | — | Operator / official |
Tokyo Fuchu Data CenterColocation
History
|
Fuchu, Japan | Operational | 50 MW total | 2020 | Operator / official |
| Fukuoka Kitakyushu Data Center (Asian Frontier)Colocation | Kitakyushu, Japan | Operational | — | — | Operator / official |
| Fukushima Shirakawa Data CenterColocation | Shirakawa, Japan | Operational | — | — | Operator / official |
| Kanagawa Yokohama Data CenterColocation | Yokohama, Japan | Operational | — | — | Operator / official |
| Osaka Suita Data CenterColocation | Suita, Japan | Operational | — | — | Operator / official |
| Stargate LordstownHyperscale | Lordstown, United States | Under construction | — | — | Trade press |
| Tokyo Ariake Data CenterColocation | Koto-ku, Japan | Operational | — | — | Operator / official |
| Tokyo Nihombashi Data CenterColocation | Chuo-ku, Japan | Operational | — | — | Operator / official |
Tomakomai AI Data CenterHyperscale
History
|
Tomakomai, Japan | Under construction | — | — | Operator / official |
Market position
How SoftBank compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Japan, SoftBank ranks #4 of 27 tracked operators by capacity, with 9.9% of the country’s tracked MW.
- Japan has 101 tracked data centers from 27 operators: 826 MW operational and 1,709 MW under construction or planned.
- In United States, SoftBank is one of 173 operators we track.
- Our Deal Tracker lists 3 deal(s) naming SoftBank, the latest on 9 November 2026.
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| NTT DATA | 5 | 30 MW | 360 MW |
| Colt DCS | 9 | 101 MW | 262 MW |
| EdgeConneX | 1 | — | 200 MW |
| ESR | 3 | 25 MW | 90 MW |
| CloudHQ | 1 | — | 96.4 MW |
| CyrusOne | 2 | — | 96 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
All data centers in Japan Power and policy in Japan
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Deals naming SoftBank
- SoftBank Group Corp.; Grab Holdings; Petroleum Sarawak Berhad (PETROS) → AI infrastructure / data centres in Sarawak and Peninsular Malaysia (5 GW+ long-term target) JV / partnership $1.85B
- SoftBank Group; Grab Holdings → AI and digital infrastructure platform, Sarawak JV / partnership
- SoftBank Group → DigitalBridge Group (digital infrastructure investor) M&A $3.10B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does SoftBank operate?
DC Market Insights tracks 11 SoftBank data center(s) in 2 countries as of November 2026: 8 operational, 2 under construction and 1 planned.
Which other companies operate data centers in Japan?
Besides SoftBank, the largest operators we track in Japan by capacity are AirTrunk, NTT DATA, Colt DCS, EdgeConneX and ESR. The Japan page lists all 27 operators.
What rules apply to data centers in Japan?
Our Power & Policy Tracker lists 9 government actions on data centers and power in Japan, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.