Data Centers in Colombia

Every data center in Colombia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 29 October 2026, DC Market Insights tracks 29 data centers in Colombia run by 18 operators: 17 operational, 5 under construction and 7 planned. Stated operational capacity is 14.8 MW, with a further 154 MW under construction and 29.6 MW planned. ODATA holds the largest share of tracked operational capacity (53%).

29Facilities tracked
18Operators
14.8 MWOperational (17 sites)
154 MWUnder construction (5 sites)
29.6 MWPlanned (7 sites)

MW = IT capacity where the source states it, otherwise total capacity. 8 of 29 facilities have a stated capacity; the others are counted as sites only.

BG1 · Equinix · Bogotá (approximate location)BG2 · Equinix · Bogotá (approximate location)BG01 · ODATA · Cota (approximate location)SBOGZB01 · Scala Data Centers · Bogotá (approximate location)SBOGZB02-SBOGZB03 · Scala Data Centers · Bogotá (approximate location)BOG01 · EdgeConneX · Bogotá (approximate location)BOG02 · EdgeConneX · Bogotá (approximate location)BOG11 · EdgeConneX · Bogotá (approximate location)BOG2 · Cirion Technologies · Bogotá (approximate location)BOG 1 · KIO Networks · Bogotá (approximate location)Liberty Networks Tocancipá Data Center · Liberty Networks · Tocancipá (approximate location)IFX Cali Data Center · IFX Networks · Cali (approximate location)Tigo Bogotá Titanium Data Center · Tigo · Bogotá (approximate location)Oracle Cloud Bogotá Region · Oracle · Bogotá (approximate location)Triara · Claro · Bogotá (approximate location)Bogotá 2 · Ascenty · Bogotá (approximate location)Triara Megacenter · Claro · Medellín (approximate location)El Poblado · Gtd · Medellín (approximate location)Nebula · HostDime · Tocancipá (approximate location)Internexa Zona Franca Bogotá · Internexa · Bogotá (approximate location)Telconet Barranquilla · Telconet · Barranquilla (approximate location)Central Tower · Ufinet · Bogotá (approximate location)Jupiter · Ufinet · Bogotá (approximate location)DC BG02 · ODATA · Mosquera (approximate location)DC BG03 · ODATA · Tenjo (approximate location)GlobeNet Barranquilla · GlobeNet · Barranquilla (approximate location)Gtd Cayena · Gtd · Barranquilla (approximate location)Bogotá 1 · Ascenty · Bogotá (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Colombia data center market: key facts

  • Capacity under construction or planned (183 MW) is 12.4 times the operational base of 14.8 MW.
  • The three largest operators by operational capacity, ODATA, Cirion Technologies and EdgeConneX, hold 100% of tracked operational MW.
  • ODATA has the largest development pipeline in Colombia: 144 MW under construction or planned.
  • The largest operational facility we track is BG01 (ODATA, Cota) at 7.8 MW.
  • The largest project in the pipeline is DC BG03 by ODATA (120 MW, under construction).
  • Bogotá is the largest cluster: 23 of 29 facilities and 100% of tracked capacity.
  • By type, the tracker lists 22 colocation, 5 hyperscale and 1 edge facilities.
  • 8 of 29 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational14.8 MW
Under construction154 MW
Planned29.6 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Colombia by tracked capacity, MW
ODATA152 MW
Ascenty20 MW
EdgeConneX19.2 MW

OperationalUnder construction or planned

Facilities by type
Colocation22
Hyperscale5
Edge1
Enterprise1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Colombia data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 13 October 2026. Government sources are linked; the full source list comes with the Excel data.

Colombia's national grid (SIN) had 21.3 GW of installed generation capacity at end-2024 and a 2024 grid emission factor of 0.220 kgCO2eq/kWh (UPME). Key national rules: CREG 101 070 of 2025 on shared connection assets for large users, Law 1715/2099 renewable tax incentives, the free trade zone regime (Decree 2147 of 2016), Law 1581 of 2012 on data transfers, and the CONPES 4144 AI policy. UPME – Resolución 000085 de 2026

Policy and incentives

Special permanent free trade zones for services projects must, within three years, invest above 10,000 smmlv and create 500+ jobs, above 46,000 smmlv with 350+ jobs, or above 92,000 smmlv with 150+ jobs (Decree 2147 of 2016, Art. 33). MinCIT – Zonas Francas Permanentes Especiales

Law 1715 of 2014, amended by Law 2099 of 2021, gives a 50% income tax deduction (over up to 15 years) for direct investment in non-conventional renewable generation or efficient energy management, plus VAT exclusion and accelerated depreciation; UPME certifies the investment. Secretaría del Senado – Ley 1715 de 2014

CONPES 4144 (approved 14 Feb 2025) sets the National AI Policy: 106 actions to 2030, about COP 479,273 million, including an action line to strengthen technological infrastructure and the computing ecosystem for AI.

Power and grid

The National Interconnected System (SIN) had 21,271 MW of installed generation capacity at 31 December 2024 (UPME Generation Expansion Plan 2025-2039). UPME – PIEG 2025-2039

CREG Resolution 101 070 of 2025 (6 Feb 2025, in force on publication 17 Feb 2025) lets connection assets owned by non-regulated users connect both generation and demand to the SIN, creates embedded commercial borders and lets the owner charge for use of the assets. CREG – Resolución 101 070 de 2025

Sustainability, water and climate

UPME set the 2024 SIN emission factor for greenhouse gas inventories at 0.220 tCO2eq/MWh (Resolution 085 of 23 Feb 2026); CDM factors are 0.660 for wind and solar projects. UPME – Resolución 000085 de 2026

Data rules

Statutory Law 1581 of 2012 bans transfers of personal data to countries that do not provide adequate levels of data protection (Art. 26); the SIC supervises compliance. Secretaría del Senado – Ley 1581 de 2012

Operators in Colombia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
ODATA37.8 MW144 MW53%
EdgeConneX3—19.2 MW—
Scala Data Centers3———
Gtd2———
Equinix2———
Claro2———
Ufinet2———
Ascenty2—20 MW—
Cirion Technologies17 MW—47%
KIO Networks1———
IFX Networks1———
Telconet1———
Oracle1———
Liberty Networks1———
Internexa1———
HostDime1———
GlobeNet1———
Tigo1———

Largest data center projects in Colombia

Under construction and planned facilities with a stated capacity, largest first. 154 MW under construction and 29.6 MW planned in total.

ProjectLocationStatusTypeCapacity
DC BG03ODATA Tenjo Under construction Hyperscale 120 MW
DC BG02ODATA Mosquera Under construction Colocation 24 MW
Bogotá 1Ascenty Bogotá Planned Colocation 10 MW
Bogotá 2Ascenty Bogotá Planned Colocation 10 MW
BOG01EdgeConneX Bogotá Planned Colocation 9.6 MW
BOG02EdgeConneX Bogotá Under construction Colocation 9.6 MW

How Colombia compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,31517111,392 MW66,365 MW
Canada7818495 MW9,870 MW
Brazil16456493 MW2,645 MW
Mexico3710179 MW1,306 MW
Chile5019115 MW1,029 MW
Argentina151414.5 MW920 MW
Uruguay95—500 MW
Colombia291814.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru201124.7 MW—
Ecuador1261 MW16 MW
Panama753.5 MW—

Facilities

29 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DC BG03ODATA
History
  1. Announced
  2. Under construction
Tenjo Under construction 120 MW IT — Operator / official
DC BG02ODATA
History
  1. Announced
  2. Under construction
Mosquera Under construction 24 MW IT — Operator / official
Bogotá 1Ascenty Bogotá Planned 10 MW total — Operator / official
Bogotá 2Ascenty Bogotá Planned 10 MW total — Operator / official
BOG01EdgeConneX Bogotá Planned 9.6 MW IT — Operator / official
BOG02EdgeConneX Bogotá Under construction 9.6 MW IT — Operator / official
BG01ODATA
History
  1. Operational
  2. Operational
Cota Operational 7.8 MW total 2019 Trade press
BOG2Cirion Technologies Bogotá Operational 7 MW total — Operator / official
BG1Equinix Bogotá Operational — — Operator / official
BG2Equinix Bogotá Operational — — Operator / official
BOG 1KIO Networks Bogotá Operational — — Operator / official
BOG11EdgeConneX Bogotá Under construction — — Operator / official
Central TowerUfinet Bogotá Operational — — Operator / official
El PobladoGtd Medellín Operational — 2016 Operator / official
GlobeNet BarranquillaGlobeNet Barranquilla Operational — 2017 Trade press
Gtd CayenaGtd Barranquilla Planned — — Trade press
IFX Cali Data CenterIFX Networks Cali Operational — — Operator / official
Internexa Zona Franca BogotáInternexa Bogotá Operational — — Trade press
JupiterUfinet Bogotá Operational — — Operator / official
Liberty Networks Tocancipá Data CenterLiberty Networks Tocancipá Operational — — Operator / official
NebulaHostDime Tocancipá Operational — — Operator / official
Oracle Cloud Bogotá RegionOracle Bogotá Operational — 2023 Trade press
SBOGZB01Scala Data Centers Bogotá Under construction — — Operator / official
SBOGZB02-SBOGZB03Scala Data Centers Bogotá Planned — — Operator / official
SBOGZM01Scala Data Centers Bogotá Planned — — Operator / official
Telconet BarranquillaTelconet Barranquilla Planned — — Trade press
Tigo Bogotá Titanium Data CenterTigo Bogotá Operational — — Trade press
TriaraClaro Bogotá Operational — — Trade press
Triara MegacenterClaro Medellín Operational — 2019 Trade press

Get the data

Every data center in Colombia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Colombia

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Colombia

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Colombia?

DC Market Insights tracks 29 data centers in Colombia as of October 2026: 17 operational, 5 under construction and 7 planned, run by 18 operators. The count grows as we verify more sites.

What is the data center capacity of Colombia?

Tracked operational capacity in Colombia is 14.8 MW, with 154 MW under construction and 29.6 MW planned. These totals use the capacity each source states (IT load where given) and cover 8 of 29 tracked facilities.

Which companies operate the most data center capacity in Colombia?

By tracked operational capacity, the largest operators in Colombia are ODATA (7.8 MW) and Cirion Technologies (7 MW).

Where are the data centers in Colombia located?

The largest clusters by tracked capacity are Bogotá (23 facilities), Barranquilla (3 facilities) and Medellín (2 facilities). The map above shows every site.

Which new data centers are being built in Colombia?

We track 154 MW under construction and 29.6 MW planned. The largest projects are DC BG03 by ODATA (120 MW), DC BG02 by ODATA (24 MW) and Bogotá 1 by Ascenty (10 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy