Aligned Data Centers Data Centers
Data centers operated by Aligned Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 15 October 2026, DC Market Insights tracks 29 data centers operated by Aligned Data Centers in 1 country, of which 12 are operational. Stated operational capacity is 154 MW, with a further 2,612 MW under construction and 36 MW planned. The pipeline is 17.2 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 7 of 29 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Aligned Data Centers data centers: key facts
About Aligned Data Centers
Aligned Data Centers is a Dallas-based developer and operator of hyperscale and build-to-scale data center campuses for cloud and AI workloads. When the AIP, MGX and BlackRock's GIP consortium closed its purchase of 100% of the equity on July 21, 2026, at an enterprise value of about US$40 billion, Aligned had 51 campuses and more than 6.4GW of operational and planned capacity across the United States and Latin America, where it also operates as ODATA.
- Headquarters
- Dallas, United States
- Founded
- 2013
- Ownership
- Private: AIP, MGX and BlackRock's GIP (closed Jul 21, 2026)
- Parent company
- AIP, MGX and BlackRock's GIP consortium
- Tracked footprint
- 29 facilities in 1 country
- Website
- aligneddc.com
Data center business
- At the July 2026 closing the portfolio spanned 51 campuses with more than 6.4GW of operational and planned capacity; Andrew Schaap is CEO and the company remains headquartered in Dallas, Texas.
- Macquarie Infrastructure Partners IV made its initial investment in Aligned in April 2018, when the company had two operational facilities in Dallas and Phoenix with 85 MW of critical capacity; by October 2025 it had over 5 GW of operational and planned capacity across 50 data centers in the United States, Mexico, Brazil, Chile and Colombia.
- Aligned plans a 197-acre mega-scale AI campus next to the former AEP Conesville Power Plant in Coshocton County, Ohio, targeting initial capacity delivery in mid-2026, with a foundational customer secured for the first data center.
- Aligned announced IAD-03, a four-story, 430,000 sq ft, 72 MW hyperscale data center on a 10-acre campus in Sterling, Virginia, master-planned for two buildings.
- Aligned describes itself as a provider of sustainable, ultra-efficient and adaptive digital infrastructure, building and operating data centers for cloud and AI workloads, with 50 campuses across the Americas and 5 GW of contracted and available capacity listed on its website.
- US markets on Aligned's location pages: Northern Virginia (IAD-01 and IAD-02 Ashburn, IAD-03 Sterling), Maryland (IAD-04, 75-acre campus in Frederick), Chicago (ORD-01 and ORD-02 Northlake, ORD-03 Elk Grove Village), Dallas-Fort Worth (DFW-01, DFW-02 and DFW-04 Plano, DFW-03 Mansfield) and Atlanta (ATL-01 Lithia Springs).
- Further US campuses: Phoenix (PHX-01 to PHX-03 and PHX-05 Phoenix, PHX-04 and PHX-06 Chandler, PHX-07 Waddell), Salt Lake City (SLC-01 to SLC-03 West Jordan, SLC-04 West Valley City), Hillsboro, Oregon (PDX-01), Ohio (NEO-01 Sandusky, 129 acres; CMH-02 Conesville, 197 acres), Pennsylvania (PIT-01 Shippingport) and Abernathy, Texas (LBB-01).
- In Latin America Aligned operates through ODATA, described as an Aligned Data Centers company; the Brazil page lists SP-01 Santana de Parnaiba, SP-02 Hortolandia, SP-03 Barueri, SP-04 Osasco and RJ-01 Sao Joao de Meriti, with further campuses in Chile, Colombia and Mexico.
Recent updates
- Aligned appointed Chris Drumgoole as Chief Operating Officer.
- ODATA, an Aligned Data Centers company, began installing DeltaFlow liquid cooling at its Brazil and Mexico campuses, backed by US$630 million combined, with projects to follow in Chile and Colombia.
- Aligned broke ground on Project Phoenix, a 2 GW, three-facility campus in the Shippingport Industrial Park, Pennsylvania, next to the Shippingport Power Station, with an estimated US$10 billion of regional economic investment.
- The consortium closed the acquisition of 100% of Aligned's equity at an enterprise value of about US$40 billion; Aligned had 51 campuses and more than 6.4GW of operational and planned capacity.
- Aligned broke ground on Project Caprock, a 540 MW, 313-acre campus of six facilities (1.65 million sq ft) in Hale County near Abernathy, Texas; the first facility, LBB-01, has an anticipated service date of Q1 2027.
- Aligned closed a US$2.58 billion credit facility backed by an initial collateral pool of six well-progressed assets in its US portfolio.
- Aligned and Calibrant agreed to deploy a 31 MW / 62 MWh battery energy storage system at Aligned's Pacific Northwest campus, planned to be operational in 2026, so the site can come online before utility upgrades.
- AIP, MGX and BlackRock's GIP agreed to acquire 100% of the equity in Aligned from Macquarie Asset Management funds and co-investors, implying an enterprise value of about US$40 billion.
Company details checked against company and official sources, 3 Nov 2026.
- Capacity under construction or planned (2,648 MW) is 17.2 times the operational base of 154 MW.
- Its largest operational site is Aligned IAD-03 in Sterling, United States at 72 MW.
- The largest project in the pipeline is Aligned Project Phoenix (Shippingport) (2,000 MW, under construction).
- By type, the tracker lists 21 hyperscale and 8 colocation facilities.
- 7 of 29 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Aligned Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 2,612 MW under construction and 36 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Aligned Project Phoenix (Shippingport)Aligned Data Centers | Shippingport, United States | Under construction | Hyperscale | 2,000 MW |
| Aligned Project Caprock LBB-01 AbernathyAligned Data Centers | Abernathy, United States | Under construction | Hyperscale | 540 MW |
| Aligned PDX-01 HillsboroAligned Data Centers | Hillsboro, United States | Under construction | Colocation | 72 MW |
| Aligned DFW-02 PlanoAligned Data Centers | Plano, United States | Planned | Hyperscale | 36 MW |
Facilities
29 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Aligned Project Phoenix (Shippingport)Hyperscale
1 deal
|
Shippingport, United States | Under construction | 2,000 MW total | — | Operator / official |
Aligned Project Caprock LBB-01 AbernathyHyperscale
History · 1 deal
|
Abernathy, United States | Under construction | 540 MW total | — | Operator / official |
Aligned IAD-03Hyperscale
History
|
Sterling, United States | Operational | 72 MW total | — | Operator / official |
| Aligned PDX-01 HillsboroColocation | Hillsboro, United States | Under construction | 72 MW IT | — | Trade press |
Aligned SLC-02Colocation
History
|
West Jordan, United States | Operational | 48 MW total | 2021 | Trade press |
Aligned DFW-02 PlanoHyperscale
History
|
Plano, United States | Planned | 36 MW IT | — | Operator / official |
| Aligned SLC-01Colocation | West Jordan, United States | Operational | 34 MW total | — | Trade press |
| Aligned ATL-01Hyperscale | Lithia Springs, United States | Operational | — | — | Operator / official |
| Aligned CMH-02Hyperscale | Conesville, United States | Planned | — | — | Operator / official |
| Aligned DFW-01 PlanoColocation | Plano, United States | Operational | — | 2015 | Trade press |
Aligned DFW-03 MansfieldHyperscale
History
|
Mansfield, United States | Under construction | — | — | Trade press |
| Aligned DFW-04 PlanoHyperscale | Plano, United States | Under construction | — | — | Trade press |
| Aligned IAD-01Hyperscale | Ashburn, United States | Operational | — | — | Operator / official |
| Aligned IAD-02Hyperscale | Ashburn, United States | Operational | — | — | Operator / official |
| Aligned IAD-04 (Quantum Frederick Building 1)Hyperscale Cooling: Air or free cooling | Frederick, United States | Under construction | — | — | Trade press |
| Aligned IAD-06 (Quantum Frederick)Hyperscale | Frederick, United States | Under construction | — | — | Trade press |
| Aligned NEO-01Hyperscale | Sandusky, United States | Under construction | — | — | Trade press |
| Aligned ORD-01Hyperscale | Northlake, United States | Operational | — | — | Operator / official |
| Aligned ORD-02Hyperscale | Northlake, United States | Operational | — | — | Operator / official |
| Aligned ORD-03Hyperscale | Elk Grove Village, United States | Planned | — | — | Operator / official |
| Aligned Pataskala siteHyperscale | Pataskala, United States | Planned | — | — | Trade press |
| Aligned PDX-02 HillsboroColocation | Hillsboro, United States | Planned | — | — | Trade press |
Aligned PHX-01/02/03 PhoenixColocation
History
|
Phoenix, United States | Operational | — | 2017 | Operator / official |
| Aligned PHX-04 ChandlerHyperscale | Chandler, United States | Operational | — | — | Operator / official |
Aligned PHX-05 PhoenixHyperscale
History
|
Phoenix, United States | Planned | — | — | Operator / official |
| Aligned PHX-06 ChandlerHyperscale | Chandler, United States | Operational | — | — | Operator / official |
| Aligned PHX-07 WaddellHyperscale | Waddell, United States | Planned | — | — | Operator / official |
| Aligned SLC-03Colocation Cooling: Chilled water, dry coolers | West Jordan, United States | Planned | — | — | Trade press |
| Aligned SLC-04Colocation | West Valley City, United States | Planned | — | — | Operator / official |
Market position
How Aligned Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Aligned Data Centers ranks #7 of 171 tracked operators by capacity, with 3.6% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- West Jordan also hosts 2 other tracked data center(s), run by Novva Data Centers and Flexential.
- Our Deal Tracker lists 1 deal(s) naming Aligned Data Centers, the latest on 10 September 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Other data centers in West Jordan
- Novva Utah Data Center · Novva Data Centers · Operational · 200 MW
- Flexential Salt Lake City – South Valley · Flexential · Operational · 1.2 MW
Deals naming Aligned Data Centers
- Aligned Data Centers → Project Phoenix, 2 GW campus, Shippingport Industrial Park, Pennsylvania Land / campus $10.00B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Aligned Data Centers operate?
DC Market Insights tracks 29 Aligned Data Centers data center(s) in 1 country as of October 2026: 12 operational, 8 under construction and 9 planned.
Where is Aligned Data Centers headquartered?
Aligned Data Centers is headquartered in Dallas, United States. Ownership: Private: AIP, MGX and BlackRock's GIP (closed Jul 21, 2026).
Which other companies operate data centers in United States?
Besides Aligned Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in West Jordan?
Other tracked data centers in West Jordan include Novva Utah Data Center (Novva Data Centers) and Flexential Salt Lake City – South Valley (Flexential).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.