Proprietary data

Aligned Data Centers Data Centers

Data centers operated by Aligned Data Centers that we have verified: location, status and capacity, each checked against its source.

In short

As of 15 October 2026, DC Market Insights tracks 29 data centers operated by Aligned Data Centers in 1 country, of which 12 are operational. Stated operational capacity is 154 MW, with a further 2,612 MW under construction and 36 MW planned. The pipeline is 17.2 times the capacity already operating.

29Facilities tracked
1Countries
154 MWOperational (12 sites)
2,612 MWUnder construction (8 sites)
36 MWPlanned (9 sites)

MW = IT capacity where the source states it, otherwise total capacity. 7 of 29 facilities have a stated capacity; the others are counted as sites only.

Aligned IAD-01 · Aligned Data Centers · Ashburn (approximate location)Aligned IAD-02 · Aligned Data Centers · Ashburn (approximate location)Aligned IAD-03 · Aligned Data Centers · Sterling (approximate location)Aligned IAD-06 (Quantum Frederick) · Aligned Data Centers · Frederick (approximate location)Aligned Project Phoenix (Shippingport) · Aligned Data Centers · Shippingport (approximate location)Aligned DFW-01 Plano · Aligned Data Centers · Plano (approximate location)Aligned DFW-02 Plano · Aligned Data Centers · Plano (approximate location)Aligned DFW-03 Mansfield · Aligned Data Centers · Mansfield (approximate location)Aligned DFW-04 Plano · Aligned Data Centers · Plano (approximate location)Aligned Project Caprock LBB-01 Abernathy · Aligned Data Centers · Abernathy (approximate location)Aligned PHX-01/02/03 Phoenix · Aligned Data Centers · Phoenix (approximate location)Aligned PHX-04 Chandler · Aligned Data Centers · Chandler (approximate location)Aligned PHX-05 Phoenix · Aligned Data Centers · Phoenix (approximate location)Aligned PHX-06 Chandler · Aligned Data Centers · Chandler (approximate location)Aligned SLC-01 · Aligned Data Centers · West Jordan (approximate location)Aligned SLC-02 · Aligned Data Centers · West Jordan (approximate location)Aligned SLC-03 · Aligned Data Centers · West Jordan (approximate location) · Cooling: Chilled water, dry coolersAligned SLC-04 · Aligned Data Centers · West Valley City (approximate location)Aligned PDX-01 Hillsboro · Aligned Data Centers · Hillsboro (approximate location)Aligned PDX-02 Hillsboro · Aligned Data Centers · Hillsboro (approximate location)Aligned ATL-01 · Aligned Data Centers · Lithia Springs (approximate location)Aligned NEO-01 · Aligned Data Centers · Sandusky (approximate location)Aligned Pataskala site · Aligned Data Centers · Pataskala (approximate location)Aligned IAD-04 (Quantum Frederick Building 1) · Aligned Data Centers · Frederick (exact location) · Cooling: Air or free coolingAligned ORD-01 · Aligned Data Centers · Northlake (exact location)Aligned ORD-02 · Aligned Data Centers · Northlake (exact location)Aligned ORD-03 · Aligned Data Centers · Elk Grove Village (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Aligned Data Centers data centers: key facts

About Aligned Data Centers

Aligned Data Centers is a Dallas-based developer and operator of hyperscale and build-to-scale data center campuses for cloud and AI workloads. When the AIP, MGX and BlackRock's GIP consortium closed its purchase of 100% of the equity on July 21, 2026, at an enterprise value of about US$40 billion, Aligned had 51 campuses and more than 6.4GW of operational and planned capacity across the United States and Latin America, where it also operates as ODATA.

Headquarters
Dallas, United States
Founded
2013
Ownership
Private: AIP, MGX and BlackRock's GIP (closed Jul 21, 2026)
Parent company
AIP, MGX and BlackRock's GIP consortium
Tracked footprint
29 facilities in 1 country
Website
aligneddc.com

Data center business

  • At the July 2026 closing the portfolio spanned 51 campuses with more than 6.4GW of operational and planned capacity; Andrew Schaap is CEO and the company remains headquartered in Dallas, Texas.
  • Macquarie Infrastructure Partners IV made its initial investment in Aligned in April 2018, when the company had two operational facilities in Dallas and Phoenix with 85 MW of critical capacity; by October 2025 it had over 5 GW of operational and planned capacity across 50 data centers in the United States, Mexico, Brazil, Chile and Colombia.
  • Aligned plans a 197-acre mega-scale AI campus next to the former AEP Conesville Power Plant in Coshocton County, Ohio, targeting initial capacity delivery in mid-2026, with a foundational customer secured for the first data center.
  • Aligned announced IAD-03, a four-story, 430,000 sq ft, 72 MW hyperscale data center on a 10-acre campus in Sterling, Virginia, master-planned for two buildings.
  • Aligned describes itself as a provider of sustainable, ultra-efficient and adaptive digital infrastructure, building and operating data centers for cloud and AI workloads, with 50 campuses across the Americas and 5 GW of contracted and available capacity listed on its website.
  • US markets on Aligned's location pages: Northern Virginia (IAD-01 and IAD-02 Ashburn, IAD-03 Sterling), Maryland (IAD-04, 75-acre campus in Frederick), Chicago (ORD-01 and ORD-02 Northlake, ORD-03 Elk Grove Village), Dallas-Fort Worth (DFW-01, DFW-02 and DFW-04 Plano, DFW-03 Mansfield) and Atlanta (ATL-01 Lithia Springs).
  • Further US campuses: Phoenix (PHX-01 to PHX-03 and PHX-05 Phoenix, PHX-04 and PHX-06 Chandler, PHX-07 Waddell), Salt Lake City (SLC-01 to SLC-03 West Jordan, SLC-04 West Valley City), Hillsboro, Oregon (PDX-01), Ohio (NEO-01 Sandusky, 129 acres; CMH-02 Conesville, 197 acres), Pennsylvania (PIT-01 Shippingport) and Abernathy, Texas (LBB-01).
  • In Latin America Aligned operates through ODATA, described as an Aligned Data Centers company; the Brazil page lists SP-01 Santana de Parnaiba, SP-02 Hortolandia, SP-03 Barueri, SP-04 Osasco and RJ-01 Sao Joao de Meriti, with further campuses in Chile, Colombia and Mexico.

Recent updates

  • Aligned appointed Chris Drumgoole as Chief Operating Officer.
  • ODATA, an Aligned Data Centers company, began installing DeltaFlow liquid cooling at its Brazil and Mexico campuses, backed by US$630 million combined, with projects to follow in Chile and Colombia.
  • Aligned broke ground on Project Phoenix, a 2 GW, three-facility campus in the Shippingport Industrial Park, Pennsylvania, next to the Shippingport Power Station, with an estimated US$10 billion of regional economic investment.
  • The consortium closed the acquisition of 100% of Aligned's equity at an enterprise value of about US$40 billion; Aligned had 51 campuses and more than 6.4GW of operational and planned capacity.
  • Aligned broke ground on Project Caprock, a 540 MW, 313-acre campus of six facilities (1.65 million sq ft) in Hale County near Abernathy, Texas; the first facility, LBB-01, has an anticipated service date of Q1 2027.
  • Aligned closed a US$2.58 billion credit facility backed by an initial collateral pool of six well-progressed assets in its US portfolio.
  • Aligned and Calibrant agreed to deploy a 31 MW / 62 MWh battery energy storage system at Aligned's Pacific Northwest campus, planned to be operational in 2026, so the site can come online before utility upgrades.
  • AIP, MGX and BlackRock's GIP agreed to acquire 100% of the equity in Aligned from Macquarie Asset Management funds and co-investors, implying an enterprise value of about US$40 billion.

Company details checked against company and official sources, 3 Nov 2026.

  • Capacity under construction or planned (2,648 MW) is 17.2 times the operational base of 154 MW.
  • Its largest operational site is Aligned IAD-03 in Sterling, United States at 72 MW.
  • The largest project in the pipeline is Aligned Project Phoenix (Shippingport) (2,000 MW, under construction).
  • By type, the tracker lists 21 hyperscale and 8 colocation facilities.
  • 7 of 29 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational154 MW
Under construction2,612 MW
Planned36 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Hyperscale21
Colocation8

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Aligned Data Centers development pipeline

Under construction and planned facilities with a stated capacity, largest first. 2,612 MW under construction and 36 MW planned in total.

ProjectLocationStatusTypeCapacity
Aligned Project Phoenix (Shippingport)Aligned Data Centers Shippingport, United States Under construction Hyperscale 2,000 MW
Aligned Project Caprock LBB-01 AbernathyAligned Data Centers Abernathy, United States Under construction Hyperscale 540 MW
Aligned PDX-01 HillsboroAligned Data Centers Hillsboro, United States Under construction Colocation 72 MW
Aligned DFW-02 PlanoAligned Data Centers Plano, United States Planned Hyperscale 36 MW

Facilities

29 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Aligned Project Phoenix (Shippingport)Hyperscale
1 deal
  • Aligned Data Centers → Project Phoenix, 2 GW campus, Shippingport Industrial Park, Pennsylvania US$10,000m
  • All deals in the Deal Tracker
Shippingport, United States Under construction 2,000 MW total — Operator / official
Aligned Project Caprock LBB-01 AbernathyHyperscale
History · 1 deal
  1. Under construction
  2. Under construction
  • Aligned Data Centers → Project Caprock, 540 MW campus on 313 acres, Hale County near Abernathy, Texas
  • All deals in the Deal Tracker
Abernathy, United States Under construction 540 MW total — Operator / official
Aligned IAD-03Hyperscale
History
  1. Planned
  2. Operational
Sterling, United States Operational 72 MW total — Operator / official
Aligned PDX-01 HillsboroColocation Hillsboro, United States Under construction 72 MW IT — Trade press
Aligned SLC-02Colocation
History
  1. Operational
  2. Operational
West Jordan, United States Operational 48 MW total 2021 Trade press
Aligned DFW-02 PlanoHyperscale
History
  1. Planned
  2. Planned
Plano, United States Planned 36 MW IT — Operator / official
Aligned SLC-01Colocation West Jordan, United States Operational 34 MW total — Trade press
Aligned ATL-01Hyperscale Lithia Springs, United States Operational — — Operator / official
Aligned CMH-02Hyperscale Conesville, United States Planned — — Operator / official
Aligned DFW-01 PlanoColocation Plano, United States Operational — 2015 Trade press
Aligned DFW-03 MansfieldHyperscale
History
  1. Announced
  2. Under construction
Mansfield, United States Under construction — — Trade press
Aligned DFW-04 PlanoHyperscale Plano, United States Under construction — — Trade press
Aligned IAD-01Hyperscale Ashburn, United States Operational — — Operator / official
Aligned IAD-02Hyperscale Ashburn, United States Operational — — Operator / official
Aligned IAD-04 (Quantum Frederick Building 1)Hyperscale Cooling: Air or free cooling Frederick, United States Under construction — — Trade press
Aligned IAD-06 (Quantum Frederick)Hyperscale Frederick, United States Under construction — — Trade press
Aligned NEO-01Hyperscale Sandusky, United States Under construction — — Trade press
Aligned ORD-01Hyperscale Northlake, United States Operational — — Operator / official
Aligned ORD-02Hyperscale Northlake, United States Operational — — Operator / official
Aligned ORD-03Hyperscale Elk Grove Village, United States Planned — — Operator / official
Aligned Pataskala siteHyperscale Pataskala, United States Planned — — Trade press
Aligned PDX-02 HillsboroColocation Hillsboro, United States Planned — — Trade press
Aligned PHX-01/02/03 PhoenixColocation
History
  1. Operational
  2. Operational
Phoenix, United States Operational — 2017 Operator / official
Aligned PHX-04 ChandlerHyperscale Chandler, United States Operational — — Operator / official
Aligned PHX-05 PhoenixHyperscale
History
  1. Planned
  2. Planned
Phoenix, United States Planned — — Operator / official
Aligned PHX-06 ChandlerHyperscale Chandler, United States Operational — — Operator / official
Aligned PHX-07 WaddellHyperscale Waddell, United States Planned — — Operator / official
Aligned SLC-03Colocation Cooling: Chilled water, dry coolers West Jordan, United States Planned — — Trade press
Aligned SLC-04Colocation West Valley City, United States Planned — — Operator / official

Market position

How Aligned Data Centers compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Aligned Data Centers ranks #7 of 171 tracked operators by capacity, with 3.6% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • West Jordan also hosts 2 other tracked data center(s), run by Novva Data Centers and Flexential.
  • Our Deal Tracker lists 1 deal(s) naming Aligned Data Centers, the latest on 10 September 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Aligned Data Centers rank by capacity#7of 171 operators · 3.6%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
STACK Infrastructure20480 MW1,848 MW
QTS471,977 MW283 MW

All data centers in United States Power and policy in United States

Other data centers in West Jordan

  • Novva Utah Data Center · Novva Data Centers · Operational · 200 MW
  • Flexential Salt Lake City – South Valley · Flexential · Operational · 1.2 MW

Deals naming Aligned Data Centers

  • Aligned Data Centers → Project Phoenix, 2 GW campus, Shippingport Industrial Park, Pennsylvania Land / campus $10.00B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Aligned Data Centers operate?

DC Market Insights tracks 29 Aligned Data Centers data center(s) in 1 country as of October 2026: 12 operational, 8 under construction and 9 planned.

Where is Aligned Data Centers headquartered?

Aligned Data Centers is headquartered in Dallas, United States. Ownership: Private: AIP, MGX and BlackRock's GIP (closed Jul 21, 2026).

Which other companies operate data centers in United States?

Besides Aligned Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in West Jordan?

Other tracked data centers in West Jordan include Novva Utah Data Center (Novva Data Centers) and Flexential Salt Lake City – South Valley (Flexential).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst