India Data Center Capacity

Installed data center capacity in India (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity India has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.

1.6 GWInstalled, end 2025IT load, DC Market Insights estimate
4%Share of Asia Pacific2025
#7Rank among 26 countriesInstalled capacity, 2025
181Sites in our tracker101 with a stated MW

India data center capacity at a glance

India had about 1.6 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 4% of the capacity in Asia Pacific and puts India at number 7 of the 26 countries in our global model. Our Data Center Tracker holds 181 sites in India run by 29 operators: 119 operational, 13 under construction and 49 planned. Our trackers also hold 26 verified deals and 7 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for India

2,002 MWStated at operational sites (119)
1,367 MWUnder construction (13 sites)
3,076 MWPlanned (49 sites)
29Operators

Largest tracked sites

SiteOperatorCityStatusMW
AdaniConneX Navi MumbaiAdaniConneXNavi MumbaiPlanned1,000 IT
AdaniConneX VisakhapatnamAdaniConneXVisakhapatnamUnder construction1,000 IT
AdaniConneX HyderabadAdaniConneXHyderabadOperational600 IT
AWS Taloja Navi Mumbai Data CentreAmazon Web ServicesNavi MumbaiPlanned473
AdaniConneX PuneAdaniConneXPuneOperational250 IT
Sify Hyderabad 02 (Fab City)SifyHyderabadPlanned250 IT
Lumina CloudInfra Chennai (Ambattur) CampusLumina CloudInfraChennaiPlanned216 IT
Anant Raj Rai Data Centre ParkAnant RajRaiPlanned200 IT
Nxtra Hyderabad (HYD 1), KokapetNxtra (Airtel)HyderabadPlanned200 IT
AdaniConneX NoidaAdaniConneXNoidaOperational150 IT

Every India site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Navi Mumbai3015365
Chennai2416154
Mumbai23980
Hyderabad1511631
Noida149228
Bengaluru12744
Pune116331
Kolkata1084

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
AdaniConneX61,0332,000
STT GDC India34211399
Sify16188290
Amazon Web Services2n/a473
Nxtra (Airtel)538315
Lumina CloudInfra2n/a276
NTT DATA16135127
Anant Raj328200

Operators ranked by MW stated at their tracked sites in India.

Power context

Rules in force

  • IncentiveUttar Pradesh Data Centre Policy 2026
  • TariffNotification on exemption from payment of electricity duty to IT/ITeS and Data Centre units (CEI-2025/CR-158/Energy-1)
  • IncentiveHaryana State Data Center Policy, 2022: declaration of Data Centers as a separate Infrastructure Industry
  • IncentiveMaharashtra Information Technology and IT Enabled Services Policy 2023
  • RegulationDeclaration of Data Center Industries as an essential service (Uttar Pradesh)

From government sources. Power and policy in India

Recent deals

  • Oct 2026 · Land / campus500MW Green Integrated Hyperscale Data Center project, Maharashtra, 500 MW, USD 3.3 bn
  • Oct 2026 · JV / partnership240MW at AdaniConneX Taloja campus, Navi Mumbai (three 80MW buildings), 240 MW
  • Sep 2026 · Land / campusFortune Data Center Park, 170 acres, Kandukur Mandal, Ranga Reddy district (1,200-1,600MW IT), 1,200 MW, USD 6.3 bn
  • Sep 2026 · Land / campusUp to 1GW AI data centre campus on 264 acres, Hyderabad, 1,000 MW, USD 7.4 bn
  • Aug 2026 · FinancingESDS Software Solution, USD 75 m
  • Aug 2026 · FinancingCtrlS Datacenters, USD 26 m

Deal Tracker

Other countries in Asia Pacific

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

India in the full data pack

By year to 2035

Installed MW for India from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does India have?

We estimate about 1.6 GW of installed data center capacity (IT load) in India at the end of 2025, about 4% of Asia Pacific and number 7 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in India?

Our Data Center Tracker lists 181 sites in India (119 operational, 13 under construction, 49 planned), run by 29 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in India?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are AdaniConneX, STT GDC India, Sify. Site capacity is counted only where a source states it.

What rules apply to data centers in India?

Our Power and Policy Tracker lists 7 government measures in force for India, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will India data center capacity grow to 2035?

The full data pack gives installed capacity for India by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.

Secure checkout

Data pack

Loading secure checkout