Japan Data Center Capacity

Installed data center capacity in Japan (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity Japan has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.

2.6 GWInstalled, end 2025IT load, DC Market Insights estimate
6%Share of Asia Pacific2025
#4Rank among 26 countriesInstalled capacity, 2025
9Sites in our tracker8 with a stated MW

Japan data center capacity at a glance

Japan had about 2.6 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 6% of the capacity in Asia Pacific and puts Japan at number 4 of the 26 countries in our global model. Our Data Center Tracker holds 9 sites in Japan run by 4 operators: 4 operational, 1 under construction and 4 planned. Our trackers also hold 6 verified deals and 7 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Japan

440 MWStated at operational sites (4)
20 MWUnder construction (1 sites)
284 MWPlanned (4 sites)
4Operators

Largest tracked sites

SiteOperatorCityStatusMW
TOK1AirTrunkInzaiOperational300
TOK2AirTrunkTokyoOperational110
OSK2AirTrunkOsakaPlanned100
Tochigi campusNTT DATATochigiPlanned100
CyrusOne KEP OSK1CyrusOnePlanned48 IT
Osaka Nishiai campusNTT DATAOsakaPlanned36
Keihanna OSK11NTT DATASoraku DistrictOperational30 IT
OSK1AirTrunkOsakaUnder construction20

Every Japan site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Osaka32n/a
Inzai22300
Tokyo11110
Soraku District1130
Tochigi11n/a

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
AirTrunk4410120
NTT DATA330136
CyrusOne1n/a48
Google1n/an/a

Operators ranked by MW stated at their tracked sites in Japan.

Power context

Rules in force

  • PlanOCCTO Aggregation of Electricity Supply Plans FY2026: demand outlook citing data centres
  • EfficiencyEnergy Conservation and Non-Fossil Energy Conversion Act: PUE standard for new data centres built from FY2029
  • EfficiencyEnergy Conservation and Non-Fossil Energy Conversion Act: benchmark for the data centre industry (データセンター業に係る措置)
  • PlanBasic Policy on Economic and Fiscal Management and Reform 2025 (経済財政運営と改革の基本方針2025): watt-bit collaboration and data centre dispersion
  • PlanGX2040 Vision (GX2040ビジョン~脱炭素成長型経済構造移行推進戦略 改訂~): data centre siting and watt-bit collaboration

From government sources. Power and policy in Japan

Recent deals

  • Oct 2026 · JV / partnershipChiba Project AI infrastructure at Chiba Thermal Power Station (up to 400MW), 400 MW, USD 15.0 bn
  • Sep 2026 · M&ATokyo Data Centre 4 and Tokyo Data Centre 5, Inzai City, USD 1.2 bn
  • Aug 2026 · Land / campusTsukuba Tech Central, phase 1 (50MW of planned 1GW campus), 50 MW
  • Aug 2026 · M&AFurther 25.0% interest in Digital Osaka 3 (stake rises from 20% to 45%), 20 MW, USD 111 m
  • Mar 2026 · FinancingAirTrunk TOK1 hyperscale campus, East Tokyo, 300 MW, USD 1.2 bn
  • Jan 2026 · JV / partnershipSoya Green Data Center I (tentative name), Wakkanai, Hokkaido, 3 MW

Deal Tracker

Other countries in Asia Pacific

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Japan in the full data pack

By year to 2035

Installed MW for Japan from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Japan have?

We estimate about 2.6 GW of installed data center capacity (IT load) in Japan at the end of 2025, about 6% of Asia Pacific and number 4 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Japan?

Our Data Center Tracker lists 9 sites in Japan (4 operational, 1 under construction, 4 planned), run by 4 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Japan?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are AirTrunk, NTT DATA, CyrusOne. Site capacity is counted only where a source states it.

What rules apply to data centers in Japan?

Our Power and Policy Tracker lists 7 government measures in force for Japan, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Japan data center capacity grow to 2035?

The full data pack gives installed capacity for Japan by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.