Data pack · Updated 12 November 2026
How much data center capacity Malaysia has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.
Malaysia data center capacity at a glance
Malaysia had about 1.0 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 3% of the capacity in Asia Pacific and puts Malaysia at number 14 of the 33 countries in our global model. Our Data Center Tracker holds 92 sites in Malaysia run by 37 operators: 53 operational, 14 under construction and 25 planned. Our trackers also hold 31 verified deals and 5 government measures in force for the country.
Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.
What our tracker holds for Malaysia
Largest tracked sites
| Site | Operator | City | Status | MW |
|---|---|---|---|---|
| KUL2 (Cyberjaya II campus) | Vantage Data Centers | Cyberjaya | Under construction | 436 IT |
| MY07 | Bridge Data Centres | Ulu Tiram | Under construction | 400 |
| Nexus Yang Green Data Centre Campus | Vena Nexus | Seremban | Under construction | 350 IT |
| JH2 | Princeton Digital Group | Taman Senai | Planned | 300 |
| JHB1 | Vantage Data Centers | Kulai | Operational | 300 IT |
| MSFusion Kota Tinggi data center site | MSFusion | Kota Tinggi | Planned | 300 |
| JHB2 | AirTrunk | Johor Bahru | Planned | 270 |
| Johor Bahru campus | STACK Infrastructure | Iskandar Puteri | Planned | 220 |
| AIMS Cyberjaya AI Data Center | AIMS Data Centre | Cyberjaya | Planned | 200 |
| EdgeConneX Cyberjaya | EdgeConneX | Cyberjaya | Planned | 200 |
Where the sites are
| City | Sites | Operators | MW stated, live |
|---|---|---|---|
| Cyberjaya | 27 | 14 | 128 |
| Kulai | 13 | 7 | 762 |
| Kuala Lumpur | 10 | 8 | 29 |
| Iskandar Puteri | 9 | 7 | 6 |
| Johor Bahru | 5 | 3 | 170 |
| Kota Tinggi | 2 | 2 | n/a |
| Gelang Patah | 2 | 2 | n/a |
| Elmina | 2 | 1 | n/a |
Cities with the most tracked sites. MW only where a source states it.
Who runs them
| Operator | Sites | MW live | MW pipeline |
|---|---|---|---|
| Vantage Data Centers | 3 | 331 | 436 |
| AirTrunk | 4 | 150 | 550 |
| Bridge Data Centres | 5 | 146 | 500 |
| Princeton Digital Group | 2 | 200 | 300 |
| Vena Nexus | 1 | n/a | 350 |
| YTL Data Centers | 8 | 97 | 240 |
| MSFusion | 1 | n/a | 300 |
| EdgeConneX | 3 | n/a | 284 |
Operators ranked by MW stated at their tracked sites in Malaysia.
Power context
- Grid emission factor, 20240.74 kgCO2/kWh · Energy Commission (MyEnergyStats), Grid Emission Factor (GEF) in Malaysia 2022-2024
- Industrial power price, 2026105.3 USD/MWh · Energy Commission (MyEnergyStats), Jadual Tarif Elektrik di Semenanjung
- Renewable share of electricity, 202120.2 % · Energy Commission, Malaysia Energy Statistics Handbook 2023
Rules in force
- RestrictionLimits on approvals of non-AI data centres (Prime Minister statement in Parliament)
- IncentiveDigital Ecosystem Acceleration (DESAC) Scheme, guidelines and procedures for application
- EfficiencyGuidelines for Sustainable Development of Data Centres
- RegulationNational Cloud Policy
- PlanNational Energy Transition Roadmap (NETR)
From government sources. Power and policy in Malaysia
Recent deals
- Nov 2026 · JV / partnershipAI infrastructure / data centres in Sarawak and Peninsular Malaysia (5 GW+ long-term target), USD 1.9 bn
- Nov 2026 · FinancingPrinceton Digital Group JH1 campus, Sedenak Tech Park, Johor (200 MW), 200 MW, USD 1.3 bn
- Nov 2026 · Power dealSolar power project with BESS, Bahau, Negri Sembilan, 500 MW
- Nov 2026 · Power dealSolar plus BESS supply for two data centre projects, 189 MW
- Oct 2026 · FinancingDayOne Data Centers, Johor data centre expansion, USD 3.7 bn
- Oct 2026 · Land / campusA103, 60MW AI cloud data center facility, Cyberjaya campus, 60 MW
Other countries in Asia Pacific
- China20.7 GW
- Japan2.6 GW
- South Korea1.5 GW
- Australia1.5 GW
- India1.5 GW
- Singapore1.5 GW
- Hong Kong0.8 GW
- Taiwan0.6 GW
- Indonesia0.5 GW
- Thailand0.4 GW
- Vietnam0.2 GW
- Pakistan0.1 GW
- Bangladesh0.1 GW
- Cambodia0.0 GW
Installed capacity, end 2025, DC Market Insights estimate. All countries and regions
Malaysia in the full data pack
By year to 2035
Installed MW for Malaysia from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.
Leading hubs
Live and pipeline MW for the main metro markets, with the basis of each figure.
Every tracked site
The full site list with operator, location, status, MW and source, refreshed from our tracker.
Related research on Malaysia
Frequently asked questions
How much data center capacity does Malaysia have?
We estimate about 1.0 GW of installed data center capacity (IT load) in Malaysia at the end of 2025, about 3% of Asia Pacific and number 14 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.
How many data centers are there in Malaysia?
Our Data Center Tracker lists 92 sites in Malaysia (53 operational, 14 under construction, 25 planned), run by 37 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.
Which companies have the most tracked data center capacity in Malaysia?
By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Vantage Data Centers, AirTrunk, Bridge Data Centres. Site capacity is counted only where a source states it.
What rules apply to data centers in Malaysia?
Our Power and Policy Tracker lists 5 government measures in force for Malaysia, such as incentives, tariffs, grid rules and national plans, each linked to the official source.
How will Malaysia data center capacity grow to 2035?
The full data pack gives installed capacity for Malaysia by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.