Hungary Data Center Market Size, Share & Forecast to 2035

Market at a glance

The Hungary Data Center market was worth USD 400.4 million in 2025 and is forecast to reach USD 2,920.0 million by 2035, growing at a 21.99% CAGR.

$400.4MMarket size, 2025
$2.92BForecast, 2035
21.99%CAGR, 2025-2035
$174.3MMarket size, 2020
Market size, USD million
174.3 2020 400.4 2025 2,920.0 2035F

Key findings

Driver

The 96 MW Paks AI Campus Ties Data Centers to Nuclear and Solar Power

Trend

Cloud Use Trails the EU, So Enterprise Server Rooms Still Hold Value

Challenge

Electricity Prices About 25% Above the EU Average

Opportunity

Tier III Colocation for NIS2-Covered Enterprises

What is inside the report

  1. 01Introduction
  2. 02Research Methodology
  3. 03Executive Summary
  4. 04Market Dynamics
  5. 05Pricing Analysis
  6. 06Standards and Regulation
  7. 07Market Segmentation by Component
  8. 08Market Segmentation by Workload
  9. 09Market Segmentation by Data Center Type
  10. 10Market Segmentation by End User
  • 17chapters
  • 2020-2024Historical period
  • 2026-2035Forecast period
  • —Companies profiled

Full table of contents

Segmentation

Component
IT InfrastructurePower SolutionsCooling SystemsGeneral Construction
Workload
AI WorkloadsConventional Workloads
Data Center Type
Colocation and WholesaleCloud and HyperscaleEnterprise and Government
End User
IT and TelecomBFSIGovernment and DefenceManufacturing and AutomotiveHealthcare and Life Sciences
Tier Standard
Tier I and IITier IIITier IV

Recent developments

July 2025

ParTec AG and 3D Lézertechnika signed a letter of intent for a modular AI data center near Paks with up to 96 MW of power draw (Source: ParTec AG).

July 2025

the EuroHPC JU signed the hosting agreement for the LEVENTE supercomputer in Budapest, at least 23 petaflops and EUR 42 million (Source: EuroHPC JU).

September 2025

the government published Hungary's AI Strategy 2025-2030 (Source: Hungarian Government).

October 2025

Government Resolution 1369/2025 ordered a study of state and market data centers, due by 31 December 2025 (Source: Hungarian Government).

October 2025

the HUN-REN SZTAKI-led HunAIFA consortium won a EuroHPC AI Factory Antenna project worth about EUR 10 million (Source: HUN-REN).

November 2025

the Hungarian Atomic Energy Authority published the key Paks II licences (Source: Paks II).

February 2026

Eurostat reported that 47.96% of Hungarian enterprises paid for cloud services in 2025, against 52.7% in the EU (Source: Eurostat).

Full analysis

The Hungary Data Center Market is valued at USD 529.40 million in 2026 and is projected to reach USD 2.92 billion by 2035, up from USD 400.40 million in 2025, a CAGR of 21.99% from 2025 to 2035 (DC Market Insights estimate). Hungary’s spending rises 32.22% in 2026 because the country’s data center build has moved from small Budapest colocation halls toward AI compute: ParTec AG (Aktiengesellschaft, a German stock corporation) and 3D Lézertechnika signed a letter of intent in July 2025 for a modular AI campus near Paks with a power draw of up to 96 MW (Source: ParTec AG), about as much as Hungary’s entire 2025 installed IT base. The 2025 receipt is 10 MW of new IT capacity × USD 9.60 million of facility cost per MW = USD 96.00 million of building, power and cooling work, plus USD 90.39 million of AI servers and USD 214.00 million of conventional IT for about 89 MW already in service (DC Market Insights estimate). Power sets the pace of the Hungary data center market more than demand does: Eurostat puts the price for a 20-70 GWh business user at EUR 0.1671 per kWh in the second half of 2025, 24.5% above the EU average of EUR 0.1342 (Source: Eurostat). The market covers data center IT infrastructure, power, cooling and construction in Hungary; AI workloads grow fastest at 33.48% a year, and the Southern Great Plain and Southern Transdanubia is the fastest region at 34.22% a year because the Paks campus sits in Tolna County next to the nuclear plant.

Key Market Statistics: How Big Is the Hungary Data Center Market in 2026?

The Hungary data center market is worth USD 529.40 million in 2026, 32.22% more than the USD 400.40 million of 2025, according to DC Market Insights.

  • Hungary data center market size 2025: USD 400.40 million; 2026: USD 529.40 million; 2030: USD 1.69 billion; 2035: USD 2.92 billion.
  • CAGR 2025-2035: 21.99% in the base case, 17.14% in the low case and 25.79% in the high case.
  • Installed IT capacity: about 98 MW at the end of 2025, rising to about 437 MW by 2035 (DC Market Insights estimate).
  • Largest component: IT infrastructure, 76.02% of 2025 value.
  • Fastest workload: AI workloads, 33.48% a year, from 27.37% to 67.34% of value.
  • Largest data center type: enterprise and government sites, 46.00% of 2025 value; fastest type: cloud and hyperscale at 28.80% a year.
  • Leading region: Budapest, 66.00% of 2025 value; fastest region: Southern Great Plain and Southern Transdanubia, 34.22% a year.
  • Largest city: Budapest with USD 264.26 million in 2025; fastest city: Paks at 64.60% a year from a small base.
  • Market leader: Magyar Telekom, through T-Systems and its Dataplex site, with about 12% of 2025 value (DC Market Insights estimate).

Key Takeaways: What Should Buyers and Investors Know About Data Centers in Hungary?

Four facts frame the Hungary data center market to 2035, each with its reason.

  • Spending grows 21.99% a year because new IT capacity rises from 10 MW in 2025 to about 38 MW a year by 2030 as AI campuses follow public compute.
  • AI workloads take 67.34% of value by 2035 because each AI MW carries about USD 35 million of servers against USD 2.5 million a year for a conventional MW.
  • Budapest’s share falls from 66.00% to 46.00% because large campuses need land and grid capacity that the capital cannot offer.
  • Power cost is the main restraint because a Hungarian MW of IT pays about EUR 0.39 million a year more for electricity than the EU average.

Hungary Data Center Market Summary: How Much Did Hungary Spend on Data Centers in 2025?

The Hungary Data Center Market size was valued at USD 174.26 million in 2020, reached USD 400.40 million in 2025, and is anticipated to reach USD 2.92 billion by 2035, at a CAGR of 21.99% during the forecast period.

Report Attribute Details
Historical Period 2020-2024
Base Year 2025
Forecast Period 2026-2035
Hungary Data Center Market Size 2025 USD 400.40 million
Hungary Data Center Market Size 2026 USD 529.40 million
Hungary Data Center Market, CAGR 2025-2035 21.99%
Hungary Data Center Market Size 2035 USD 2.92 billion

The Hungary data center market grew 18.10% a year from 2020 to 2025 as installed IT capacity rose from about 62 MW to about 98 MW, mostly in Budapest. DC Market Insights expects growth of 21.99% a year to 2035 as about 356 MW of new IT capacity comes online, roughly 3.6 times the 2025 base. Facility work (power, cooling and construction) is 23.98% of 2025 value; the Hungary Data Center Infrastructure Market report covers that layer in more detail.

Hungary Data Center Market size 2020-2035: USD 174.26 million in 2020, USD 400.40 million in 2025 and USD 2.92 billion in 2035, a CAGR of 21.99% from 2025 (DC Market Insights)

What Does the Hungary Data Center Market Include?

The Hungary data center market includes USD 400.40 million of 2025 spending on the facilities and IT equipment of data centers located in Hungary.

Included

Servers, storage and network equipment installed in Hungarian data centers, including graphics processing unit (GPU) servers for artificial intelligence (AI); uninterruptible power supplies (UPS), switchgear, generators and power distribution; chillers, air handlers and liquid cooling; shell, core and fit-out construction of data halls. All owner types count: colocation operators, cloud and hyperscale sites, telecom operators, banks, government agencies and enterprise server rooms (céges adatközpont).

Excluded

Electricity and water bills, public cloud service revenue billed from abroad, telecom networks outside the data center, IT outsourcing and software licences. The colocation rent paid by tenants is counted once, through the facility and IT spending of the site; the Hungary Data Center Colocation Market report values that rent separately.

How the Segments Fit Together

Five dimensions split the same total: component, workload, data center type, end user and tier standard. Each sums to the national total in 2025 and 2035, and the five regions do the same.

Why Do Hungary Data Center Market Estimates Differ?

Estimates for the Hungary data center market differ by more than 1.5 times because some count capacity in MW, some count only colocation rent and some add cloud and IT services, while DC Market Insights counts USD 529.40 million of facility and IT equipment spending in 2026.

A definition that adds cloud services bought by Hungarian companies would be larger, because 47.96% of Hungarian enterprises paid for cloud services in 2025 (Source: Eurostat), and much of that is served from data centers in Austria, Germany and Poland. A definition that counts only third-party colocation rent would be smaller, because enterprise and government sites still hold 46.00% of 2025 value. Some estimates quote megawatts of colocation capacity rather than money; DC Market Insights uses about 98 MW of installed IT capacity of all owner types.

Element In this report Why
IT equipment in Hungarian data centers Yes, USD 304.40 million in 2025 Main spending line
Power, cooling and construction Yes, USD 96.00 million in 2025 Facility investment
Enterprise and government server rooms Yes, 46.00% of value Large part of Hungarian capacity
Public cloud services billed from abroad No Not built in Hungary
Electricity bills No Operating cost, not investment

Out of scope are cloud service revenue, IT outsourcing, software licences, telecom networks and electricity bills. In scope are all buyer groups, from hyperscale and AI campuses to small and medium enterprises (SMEs) that run a server room in a Budapest office. The global Data Center Market report uses the same boundary.

Market Drivers: What Drives Data Center Demand in Hungary?

Three drivers lift the Hungary data center market from USD 400.40 million in 2025 to USD 1.69 billion in 2030, a 4.2-fold rise in five years.

The 96 MW Paks AI Campus Ties Data Centers to Nuclear and Solar Power

ParTec AG and 3D Lézertechnika Zrt. signed a letter of intent on 8 July 2025 for a modular hyperscale AI data center near the Paks nuclear plant with a power draw of up to 96 MW, an agro-photovoltaic park on an initial 530 hectares and battery storage, with an investment in the single-digit billions of euros (Source: ParTec AG). At a power usage effectiveness (PUE) of 1.35 that is about 71 MW of IT load, close to the 98 MW that the whole country ran at the end of 2025 (DC Market Insights estimate). Paks II also moved forward: the Hungarian Atomic Energy Authority published the project’s key licences on 4 November 2025, with first concrete expected in February 2026 (Source: Paks II), which gives AI buyers a long-term low-carbon supply story in Tolna County.

LEVENTE, Komondor and HunAIFA Build Public AI Compute in Budapest and Debrecen

The European High Performance Computing Joint Undertaking (EuroHPC JU) signed a hosting agreement on 9 July 2025 for LEVENTE, a supercomputer of at least 23 petaflops in Budapest hosted by the Digital Government Development and Project Management Company (DKF), at a total cost of EUR 42 million, of which EuroHPC funds up to EUR 14.8 million (Source: EuroHPC JU). Komondor, the national supercomputer at the University of Debrecen, already runs at about 5 petaflops (Source: University of Debrecen). In October 2025 the HunAIFA consortium led by SZTAKI of the Hungarian Research Network (HUN-REN) won a three-year EuroHPC AI Factory Antenna project with a budget of about EUR 10 million (Source: HUN-REN). DC Market Insights counts public high-performance computing (HPC) halls in the government segment, which grows 20.47% a year to 2035.

Government Resolution 1369/2025 Puts State and Market Data Centers on the Agenda

Government Resolution 1369/2025 of 14 October 2025 ordered the energy minister, with the economy minister and the government commissioner for AI, to study the creation of state and market data centers, including grid needs, cybersecurity and investment incentives, by 31 December 2025 (Source: Hungarian Government). It follows Hungary’s AI Strategy 2025-2030, published on 4 September 2025 (Source: Hungarian Government). DC Market Insights models cloud and hyperscale sites rising from 18.00% to 31.00% of value as these programmes turn into sites.

The Hungary data center market is shifting from conventional enterprise IT to AI and shared facilities, with AI workloads rising from 27.37% of value in 2025 to 67.34% in 2035 (DC Market Insights estimate).

Cloud Use Trails the EU, So Enterprise Server Rooms Still Hold Value

47.96% of Hungarian enterprises with 10 or more employees paid for cloud computing in 2025, up from 44.94% in 2023, against an EU average of 52.74% (Source: Eurostat). The gap of about 4.8 percentage points keeps more IT in company server rooms, which is why enterprise and government sites still hold 46.00% of 2025 value; as the gap closes, that share falls to 27.00% by 2035.

Budapest Interconnection Passes 1.49 Tb/s at the BIX

The Budapest Internet Exchange (BIX) shows a peak of about 1,491.95 Gb/s on 8,578 Gb/s of port capacity with 144 connected networks, and plans a link to a Vienna point of presence (Source: BIX, October 2026). Interconnection keeps carrier-neutral colocation in Budapest, where colocation and wholesale sites grow 23.88% a year.

Telecom Operators Fold Data Center Units Into Larger Brands

Invitech’s data center pages now redirect to One Hungary, the former Vodafone Hungary, which places Invitech’s colocation inside a group with mobile and fixed networks (Source: One Hungary). Magyar Telekom runs Dataplex through T-Systems, and 4iG holds IT and space assets alongside its telecom business. DC Market Insights estimates that telecom-owned operators hold about a third of Hungarian colocation value.

Market Challenges: What Holds Back Data Center Projects in Hungary?

Two restraints could cut the Hungary data center market by USD 974.00 million against the base case by 2035, the gap between the base and low scenarios.

Electricity Prices About 25% Above the EU Average

Hungarian business users in the 20-70 GWh band paid EUR 0.1695 per kWh in the first half of 2025 and EUR 0.1671 in the second half, against EUR 0.1381 and EUR 0.1342 for the EU (Source: Eurostat, excluding VAT). For one MW of IT at a PUE of 1.35, that is about EUR 1.98 million a year in Hungary against EUR 1.59 million at the EU average, a gap of EUR 0.39 million per MW (DC Market Insights calculation). The low scenario assumes 30% fewer new MW from 2027 for this reason.

Letters of Intent Are Not Yet Construction Contracts

The Paks campus is a letter of intent, not a final contract (Source: ParTec AG), and Resolution 1369/2025 orders a study, not a budget or a site list. If the 96 MW campus slips by three years, about USD 0.4 billion of 2028-2030 spending moves out of the forecast window’s middle years (DC Market Insights estimate).

Market Opportunities: Where Can Data Center Suppliers Win in Hungary?

Two opportunities hold about USD 2.13 billion of 2035 Hungary data center market value, colocation plus cloud and hyperscale.

Tier III Colocation for NIS2-Covered Enterprises

Act LXIX of 2024 on the cybersecurity of Hungary transposes the EU NIS2 Directive and widens the set of firms that must prove resilient IT operations. Many of these firms move from Tier I and II server rooms to Tier III colocation, so the Tier III share of value rises from 62.00% in 2025 to 72.00% by 2035 (DC Market Insights estimate).

AI-Ready Halls for Manufacturing and Automotive Plants

Manufacturing and automotive buyers grow fastest among end users at 25.55% a year, from USD 48.05 million to USD 467.50 million, as factories in Győr, Kecskemét and Debrecen run vision inspection and digital-twin workloads close to the line. Operators with sites in Pest County and Debrecen are best placed.

Pricing: How Much Does a Data Center MW Cost in Hungary?

A new data center in Hungary costs about USD 9.60 million per MW of IT capacity for building, power and cooling in 2025, rising to about USD 12.80 million by 2035, according to DC Market Insights.

Year Facility cost per new MW (USD million) AI IT equipment per AI MW (USD million) Conventional IT spend per installed MW a year (USD million)
2020 8.20 28.00 2.20
2025 9.60 35.00 2.50
2030 11.13 32.50 2.65
2035 12.80 30.00 2.80

The facility cost splits 45% power, about 20% cooling and 35% construction in 2025. Public anchors: LEVENTE’s EUR 42 million total for at least 23 petaflops (Source: EuroHPC JU) and the Eurostat price of EUR 0.1671 per kWh for large business users, which adds about EUR 1.98 million a year per MW of IT in power cost.

Standards and Regulation: Which Rules Apply to Data Centers in Hungary?

Seven rules shape the Hungary data center market, and the EU reporting rule alone covers every site with 500 kW or more of IT power, which DC Market Insights estimates at more than 54.00% of 2025 value.

  • Government Resolution 1369/2025 (X.14.) on AI measures: study of state and market data centers, grid needs and incentives (Source: Hungarian Government).
  • Act LXIX of 2024 on the cybersecurity of Hungary, transposing Directive (EU) 2022/2555 (NIS2).
  • Energy Efficiency Directive (EU) 2023/1791, Article 12, and Delegated Regulation (EU) 2024/1364: annual reporting of energy, PUE, water and waste heat for data centers of 500 kW and above.
  • General Data Protection Regulation (GDPR), which keeps personal data of Hungarian banks and public bodies inside the European Economic Area.
  • EN 50600 and ISO/IEC 22237 for data center facilities, and ISO/IEC 27001 for information security.
  • Tier classification (Tier I to Tier IV) used in tenders by banks and government buyers.
  • Hungary’s AI Strategy 2025-2030 (Source: Hungarian Government).

Market Segmentation: Which Hungary Data Center Market Segment Leads?

IT infrastructure leads the Hungary data center market with 76.02% of 2025 value, while AI workloads grow fastest at 33.48% a year.

By Component

IT equipment leads because servers are refreshed every four to five years across the whole installed base; cooling grows faster than power (22.09% against 19.89%) as liquid cooling enters AI halls.

Component 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
IT Infrastructure 304.40 76.02% 2,333.09 22.59%
Power Solutions 43.20 10.79% 264.96 19.89%
Cooling Systems 19.20 4.80% 141.31 22.09%
General Construction 33.60 8.39% 182.53 18.44%

By Workload

AI workloads rise from USD 109.59 million to USD 1.97 billion, overtaking conventional workloads before 2030.

Workload 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
AI Workloads 109.59 27.37% 1,967.49 33.48%
Conventional Workloads 290.80 72.63% 954.40 12.62%

By Data Center Type

Enterprise and government sites (céges and state data centers) lead in 2025 with 46.00%; colocation and wholesale lead by 2035 with 42.00%.

Data Center Type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Colocation and Wholesale 144.14 36.00% 1,227.19 23.88%
Cloud and Hyperscale 72.07 18.00% 905.78 28.80%
Enterprise and Government 184.18 46.00% 788.91 15.66%

By End User

IT and telecom buyers hold 34.00% of 2025 value; banks, insurers and other BFSI (banking, financial services and insurance) buyers hold 20.00%.

End User 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
IT and Telecom 136.14 34.00% 1,110.32 23.35%
BFSI 80.08 20.00% 467.50 19.30%
Government and Defence 68.07 17.00% 438.28 20.47%
Manufacturing and Automotive 48.05 12.00% 467.50 25.55%
Healthcare and Life Sciences 28.03 7.00% 204.53 21.99%
Others 40.04 10.00% 233.75 19.30%

By Tier Standard

Tier III holds 62.00% of 2025 value; Tier IV grows fastest at 29.01% a year as AI and banking sites ask for concurrent maintainability and fault tolerance.

Tier Standard 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Tier I and II 120.12 30.00% 409.06 13.04%
Tier III 248.25 62.00% 2,103.76 23.83%
Tier IV 32.03 8.00% 409.06 29.01%

DC Exclusive: The Hungary Compute Pipeline Tracker, 6 Projects and the Power-Cost Gap

Six named projects define Hungary’s next wave of data center capacity, and the largest, the Paks AI campus, would add about 71 MW of IT load, roughly 73% of the country’s 2025 installed base. This tracker is a DC Market Insights model, an estimate built on 9 inputs: six project records, the Eurostat electricity prices for Hungary and the EU, and a design PUE of 1.35.

Project Location Size Status Workload
Paks AI campus (ParTec AG, 3D Lézertechnika) Paks, Tolna County Up to 96 MW draw, about 71 MW IT Letter of intent, July 2025 AI training and inference
LEVENTE supercomputer (EuroHPC JU, DKF) Budapest At least 23 petaflops, EUR 42 million Hosting agreement, July 2025 Public HPC and AI
Komondor supercomputer (KIFÜ, University of Debrecen) Debrecen About 5 petaflops In service since 2023 Research HPC
HunAIFA AI Factory Antenna (HUN-REN SZTAKI) Budapest About EUR 10 million over 3 years Selected, October 2025 AI services for SMEs
Dataplex (Magyar Telekom, T-Systems) Budapest About 8 MW, 8,800 m2 Operating Colocation
State and market data center study (Resolution 1369/2025) National Proposal due 31 December 2025 Government study Sovereign and public cloud

The power-cost gap decides where these projects land. At EUR 0.1671 per kWh, a Hungarian MW of IT pays about EUR 1.98 million a year for electricity against EUR 1.59 million at the EU average; across the Paks campus that gap is about EUR 27.7 million a year unless on-site solar and storage close it, which is why the letter of intent pairs the campus with a 530-hectare agro-photovoltaic park. DC Market Insights therefore books the Paks capacity over 2027-2029 rather than in one year, and counts it in the Southern Great Plain and Southern Transdanubia region, which rises from 5.00% to 13.00% of value.

Regional Insights: Where Are the Data Centers in Hungary?

Budapest leads the Hungary data center market with 66.00% of 2025 value, and the Southern Great Plain and Southern Transdanubia grows fastest at 34.22% a year to take 13.00% by 2035.

Region 2025 (USD million) Share 2025 2035 (USD million) Share 2035 CAGR 2025-2035
Budapest 264.26 66.00% 1,344.07 46.00% 17.66%
Pest County 52.05 13.00% 555.16 19.00% 26.71%
Western and Central Transdanubia 32.03 8.00% 262.97 9.00% 23.43%
Northern Great Plain and Northern Hungary 32.03 8.00% 379.85 13.00% 28.06%
Southern Great Plain and Southern Transdanubia 20.02 5.00% 379.85 13.00% 34.22%

Budapest

The capital hosts Dataplex, the BIX exchange, the LEVENTE supercomputer and the head offices of banks and ministries, so it keeps 46.00% of value in 2035 while growing 17.66% a year.

Pest County

Budaörs, Törökbálint and Gödöllő offer land and substations near the M0 ring road and fibre routes to Vienna; the county grows 26.71% a year as Budapest-area colocation expands outward.

Western and Central Transdanubia

Győr and Székesfehérvár serve automotive and electronics plants; the region holds 8.00% of 2025 value and grows 23.43% a year.

Northern Great Plain and Northern Hungary

Debrecen hosts the Komondor supercomputer and large battery and car plants, and Miskolc hosts a university computing centre; the region grows 28.06% a year.

Southern Great Plain and Southern Transdanubia

Paks, Szeged, Kecskemét and Pécs make up the fastest region at 34.22% a year, led by the planned 96 MW AI campus beside the Paks nuclear plant.

City Analysis: Which Hungarian Cities Carry the Most Data Center Spending?

Budapest carries 66.00% of Hungary data center market value in 2025, and Paks is the fastest city at 64.60% a year because the AI campus starts from almost nothing; among established hubs, Gödöllő grows fastest at 30.74%.

Rank City Region 2025 (USD million) 2035 (USD million) CAGR 2025-2035
1 Budapest Budapest 264.26 1,344.07 17.66%
2 Budaörs Pest County 20.02 175.31 24.23%
3 Debrecen Northern Great Plain and Northern Hungary 18.02 233.75 29.21%
4 Törökbálint Pest County 12.01 146.09 28.38%
5 Győr Western and Central Transdanubia 12.01 102.27 23.88%
6 Székesfehérvár Western and Central Transdanubia 12.01 102.27 23.88%
7 Gödöllő Pest County 8.01 116.88 30.74%
8 Szeged Southern Great Plain and Southern Transdanubia 8.01 87.66 27.04%
9 Miskolc Northern Great Plain and Northern Hungary 8.01 87.66 27.04%
10 Kecskemét Southern Great Plain and Southern Transdanubia 6.01 73.05 28.38%
11 Pécs Southern Great Plain and Southern Transdanubia 4.00 43.83 27.04%
12 Paks Southern Great Plain and Southern Transdanubia 1.20 175.31 64.60%

Forecast Scenarios: How Big Could the Hungary Data Center Market Be in 2035?

The Hungary data center market reaches between USD 1.95 billion and USD 3.97 billion in 2035, with USD 2.92 billion as the DC Market Insights base case.

Scenario Assumption 2035 (USD million) CAGR 2025-2035
Low 30% fewer new MW from 2027, lower AI share, Paks delayed 1,947.89 17.14%
Base About 356 MW added 2026-2035, Paks booked 2027-2029 2,921.89 21.99%
High 30% more new MW, faster AI share, state data center programme funded 3,972.52 25.79%

The low case reflects power prices that stay about 25% above the EU and a Paks campus that stays at letter-of-intent stage; the high case reflects a funded state data center programme after Resolution 1369/2025 and a second AI campus.

Key Players: Who Runs the Data Centers in Hungary?

The five largest operators hold about 41% of Hungary data center market value in 2025, with Magyar Telekom the leader at about 12% (DC Market Insights estimates, based on site sizes and public disclosures).

Company Role in Hungary Est. share of 2025 value
Magyar Telekom (T-Systems) Dataplex colocation, enterprise and public IT About 12%
4iG IT services, data center space and telecom assets About 9%
One Hungary (incl. Invitech) Colocation and network services About 8%
DKF and KIFÜ (state) Government data centers, LEVENTE and Komondor About 7%
Yettel Hungary Telecom data centers About 5%
  • Magyar Telekom
  • 4iG
  • One Hungary (Invitech)
  • Digital Government Development and Project Management Company (DKF)
  • Governmental Agency for IT Development (KIFÜ)
  • Yettel Hungary
  • DIGI Hungary
  • Rackforest
  • Dataneum
  • VIVAnet
  • ParTec AG
  • 3D Lézertechnika
  • Microsoft
  • Google Cloud
  • Amazon Web Services (AWS)
  • Schneider Electric
  • Vertiv

Magyar Telekom’s Dataplex site in Budapest is rated at about 8 MW across 8,800 square metres (DC Market Insights research). ParTec AG, a German supercomputing firm, leads the Paks AI campus plan (Source: ParTec AG). DKF hosts LEVENTE (Source: EuroHPC JU). Microsoft, Google Cloud and AWS serve Hungarian customers from regions outside Hungary, so their local spending sits mostly in edge and enterprise deployments. Schneider Electric and Vertiv supply most UPS and cooling equipment, which DC Market Insights counts in the power (10.79%) and cooling (4.80%) segments.

Recent Developments: What Changed in Hungary’s Data Center Market Since 2025?

Seven events since July 2025 shape the Hungary data center market, which DC Market Insights values at USD 529.40 million in 2026.

  • In July 2025, ParTec AG and 3D Lézertechnika signed a letter of intent for a modular AI data center near Paks with up to 96 MW of power draw (Source: ParTec AG).
  • In July 2025, the EuroHPC JU signed the hosting agreement for the LEVENTE supercomputer in Budapest, at least 23 petaflops and EUR 42 million (Source: EuroHPC JU).
  • In September 2025, the government published Hungary’s AI Strategy 2025-2030 (Source: Hungarian Government).
  • In October 2025, Government Resolution 1369/2025 ordered a study of state and market data centers, due by 31 December 2025 (Source: Hungarian Government).
  • In October 2025, the HUN-REN SZTAKI-led HunAIFA consortium won a EuroHPC AI Factory Antenna project worth about EUR 10 million (Source: HUN-REN).
  • In November 2025, the Hungarian Atomic Energy Authority published the key Paks II licences (Source: Paks II).
  • In February 2026, Eurostat reported that 47.96% of Hungarian enterprises paid for cloud services in 2025, against 52.7% in the EU (Source: Eurostat).

Methodology: How the Model Values the Hungary Data Center Market

DC Market Insights values the Hungary data center market bottom-up from 16 years of new IT capacity, an AI share and four unit costs, then checks the result against 3 bounds.

  • New IT capacity: 10 MW in 2025, 14 MW in 2026, 38 MW in 2030 and 46 MW in 2035; installed base about 98 MW at the end of 2025.
  • AI share of new capacity: 20% in 2025, 48% in 2030 and 55% in 2035.
  • Unit costs (same as the global Data Center Market model, with a Hungarian facility discount): facility USD 9.60 million per MW, AI IT USD 35 million per AI MW (USD 30 million by 2035) with a 20% yearly refresh, conventional IT USD 2.5 million per installed MW a year.
  • Receipt: 10 MW × USD 9.60 million + USD 90.39 million of AI IT + USD 214.00 million of conventional IT = USD 400.40 million.
  • Bound 1 (ceiling): the Paks campus alone, at about 71 MW of IT, is less than the 356 MW the model adds over 2026-2035, so the forecast does not rest on one project.
  • Bound 2 (ceiling): USD 400.40 million is about 0.2% of Hungary’s 2025 GDP, in line with peer Central European countries.
  • Bound 3 (floor): the Hungary Data Center Storage Market edition of March 2026 values storage at about 77% of this model’s 2025 IT infrastructure line, so storage fits inside it.

The full method is described on the research methodology page.

Table of contents

  • 17 chapters
  • 1 figures
  • 13 data tables
  1. 01Introduction
    • 1.1Market Definition and Scope
    • 1.2Included and Excluded Elements
    • 1.3How the Segments Fit Together
    • 1.4Why Hungary Data Center Market Estimates Differ
  2. 02Research Methodology
    • 2.1Bottom-Up Model: New IT MW × Cost per MW
    • 2.2Installed-Base IT Spend
    • 2.3Bound Checks
    • 2.4Source Ledger
  3. 03Executive Summary
    • 3.1Market Snapshot, 2025, 2026 and 2035
    • 3.2Key Market Statistics
    • 3.3Key Takeaways
  4. 04Market Dynamics
    • 4.1Driver: The 96 MW Paks AI Campus
    • 4.2Driver: LEVENTE, Komondor and HunAIFA Public AI Compute
    • 4.3Driver: Government Resolution 1369/2025
    • 4.4Trend: Cloud Use Trails the EU
    • 4.5Trend: Budapest Interconnection at the BIX
    • 4.6Trend: Telecom Operators Fold Data Center Units Into Larger Brands
    • 4.7Challenge: Electricity Prices About 25% Above the EU Average
    • 4.8Challenge: Letters of Intent Are Not Yet Construction Contracts
    • 4.9Opportunity: Tier III Colocation for NIS2-Covered Enterprises
    • 4.10Opportunity: AI-Ready Halls for Manufacturing and Automotive Plants
  5. 05Pricing Analysis
    • 5.1Facility Cost per New MW, 2020-2035
    • 5.2IT Spend per MW
    • 5.3Public Price Anchors
  6. 06Standards and Regulation
    • 6.1Government Resolution 1369/2025
    • 6.2Act LXIX of 2024 (NIS2)
    • 6.3Energy Efficiency Directive (EU) 2023/1791 and Delegated Regulation (EU) 2024/1364
    • 6.4GDPR
    • 6.5EN 50600, ISO/IEC 22237 and ISO/IEC 27001
    • 6.6Tier Classification
    • 6.7AI Strategy 2025-2030
  7. 07Market Segmentation by Component
    • 7.1IT Infrastructure
    • 7.2Power Solutions
    • 7.3Cooling Systems
    • 7.4General Construction
  8. 08Market Segmentation by Workload
    • 8.1AI Workloads
    • 8.2Conventional Workloads
  9. 09Market Segmentation by Data Center Type
    • 9.1Colocation and Wholesale
    • 9.2Cloud and Hyperscale
    • 9.3Enterprise and Government
  10. 10Market Segmentation by End User
    • 10.1IT and Telecom
    • 10.2BFSI
    • 10.3Government and Defence
    • 10.4Manufacturing and Automotive
    • 10.5Healthcare and Life Sciences
    • 10.6Others
  11. 11Market Segmentation by Tier Standard
    • 11.1Tier I and II
    • 11.2Tier III
    • 11.3Tier IV
  12. 12DC Exclusive: The Hungary Compute Pipeline Tracker
    • 12.1Paks AI campus (ParTec AG, 3D Lézertechnika)
    • 12.2LEVENTE supercomputer (EuroHPC JU, DKF)
    • 12.3Komondor supercomputer (KIFÜ, University of Debrecen)
    • 12.4HunAIFA AI Factory Antenna (HUN-REN SZTAKI)
    • 12.5Dataplex (Magyar Telekom, T-Systems)
    • 12.6State and market data center study (Resolution 1369/2025)
    • 12.7Power-Cost Gap per MW
  13. 13Regional Analysis
    • 13.1Budapest
    • 13.2Pest County
    • 13.3Western and Central Transdanubia
    • 13.4Northern Great Plain and Northern Hungary
    • 13.5Southern Great Plain and Southern Transdanubia
  14. 14City Analysis
    • 14.1Budapest
    • 14.2Budaörs
    • 14.3Debrecen
    • 14.4Törökbálint
    • 14.5Győr
    • 14.6Székesfehérvár
    • 14.7Gödöllő
    • 14.8Szeged
    • 14.9Miskolc
    • 14.10Kecskemét
    • 14.11Pécs
    • 14.12Paks
  15. 15Forecast Scenarios
    • 15.1Low Case
    • 15.2Base Case
    • 15.3High Case
  16. 16Key Players
    • 16.1Magyar Telekom
    • 16.24iG
    • 16.3One Hungary (Invitech)
    • 16.4DKF
    • 16.5KIFÜ
    • 16.6Yettel Hungary
    • 16.7DIGI Hungary
    • 16.8Rackforest
    • 16.9Dataneum
    • 16.10VIVAnet
    • 16.11ParTec AG
    • 16.123D Lézertechnika
    • 16.13Microsoft
    • 16.14Google Cloud
    • 16.15Amazon Web Services (AWS)
    • 16.16Schneider Electric
    • 16.17Vertiv
    • 16.18Operator Concentration
  17. 17Recent Developments
    • 17.1July 2025 to February 2026
  1. Fig. 11. Hungary Data Center Market Size, 2020-2035 (USD million)
  1. Table 11. Report Attributes
  2. Table 22. Scope Comparison
  3. Table 33. Cost per MW, 2020-2035
  4. Table 44. Market by Component, 2025 and 2035
  5. Table 55. Market by Workload, 2025 and 2035
  6. Table 66. Market by Data Center Type, 2025 and 2035
  7. Table 77. Market by End User, 2025 and 2035
  8. Table 88. Market by Tier Standard, 2025 and 2035
  9. Table 99. Hungary Compute Pipeline Tracker
  10. Table 1010. Market by Region, 2025 and 2035
  11. Table 1111. Top 12 Cities
  12. Table 1212. Forecast Scenarios, 2035
  13. Table 1313. Key Players and Estimated Shares

About this report

Amit JainDeepti Agrawal

Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.

Read our methodology

How we built this

  • Historical period2020-2024
  • Base year2025
  • Forecast period2026-2035
  • Sizing approachTop-down + bottom-up

Need more than the report?

Advisory on this market

Due diligence, site selection and market entry work, by the analysts who wrote this report.

See consulting services

Frequently asked questions

What is the size of the Hungary Data Center Market in 2026?

USD 529.40 million in 2026, up 32.22% from USD 400.40 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 2.92 billion by 2035, a CAGR of 21.99% from 2025.

How many MW of data center capacity does Hungary have?

About 98 MW of installed IT capacity at the end of 2025, counting colocation, cloud, government and enterprise sites (DC Market Insights estimate). About 356 MW more is expected by 2035.

Are there AI data centers in Hungary?

Up to 96 MW: ParTec AG and 3D Lézertechnika signed a letter of intent in July 2025 for an AI campus near Paks. The LEVENTE supercomputer in Budapest adds at least 23 petaflops of public AI and HPC compute.

Why do Hungary data center market estimates differ?

USD 529.40 million in 2026 counts facility and IT equipment spending in Hungary. Estimates that add cloud services, IT outsourcing or electricity are larger; estimates of colocation rent or MW alone are smaller.

How much does electricity cost for a data center in Hungary?

EUR 0.1671 per kWh in the second half of 2025 for 20-70 GWh business users, excluding VAT, about 24.5% above the EU average of EUR 0.1342 (Eurostat). That adds about EUR 0.39 million a year per MW of IT.

Where are the data centers in Hungary?

66.00% of 2025 value is in Budapest, followed by Pest County at 13.00%. The Southern Great Plain and Southern Transdanubia, home to Paks, grows fastest at 34.22% a year.

Which segment of the Hungary data center market grows fastest?

AI workloads at 33.48% a year, from USD 109.59 million in 2025 to USD 1.97 billion in 2035; among data center types, cloud and hyperscale grows fastest at 28.80%.

What is the government doing about data centers in Hungary?

Resolution 1369/2025 of 14 October 2025 ordered a study of state and market data centers, covering grid needs, cybersecurity and incentives, due by 31 December 2025, under the AI Strategy 2025-2030.

Who are the largest data center operators in Hungary?

About 41% of 2025 value sits with Magyar Telekom (T-Systems), 4iG, One Hungary (Invitech), the state operators DKF and KIFÜ, and Yettel Hungary, with Magyar Telekom leading at about 12% (DC Market Insights estimates).

How much does it cost to build a data center in Hungary?

About USD 9.60 million per MW of IT capacity in 2025 for building, power and cooling, rising to about USD 12.80 million by 2035; AI servers add about USD 35 million per AI MW (DC Market Insights estimates).

Get this report

How do I get the full report?

Request a quote; we reply by email within one business day.

How and when will I receive the report?

By email, within 24-48 business hours of payment.

How can I pay?

Once you accept the quote, we email you a secure payment link.

Can I see a sample first?

Yes. Request a free sample and we will email it to you.

Can the report be tailored to my needs?

Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.

Can I get an invoice or pay against a purchase order?

Write to sales@dcmarketinsights.com and our team will help.

Refund and returns policy

Request a quote

Hungary Data Center Market

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Free sample

Hungary Data Center Market

See the structure, tables and charts before you decide.

Smallform of Sample request

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to send your sample and answer your questions
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Talk to an analyst

Ask the team that built this report

Different scope, country or data cut? A senior analyst replies within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy