Proprietary data
Flexential Data Centers
Data centers operated by Flexential that we have verified: location, status and capacity, each checked against its source.
In short
As of 13 October 2026, DC Market Insights tracks 42 data centers operated by Flexential in 1 country, of which 38 are operational. Stated operational capacity is 304 MW, with a further 58.5 MW under construction and 40.5 MW planned. The pipeline is 0.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 42 of 42 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Flexential data centers: key facts
About Flexential
Flexential is a US colocation, interconnection and hybrid IT provider that runs more than 40 data centers in 18 US markets, from Portland-Hillsboro and Denver to Dallas, Atlanta and Philadelphia. In April 2026 it stated more than 360 MW of capacity online or under development, and it is building new campuses in Hillsboro, Denver-Parker, Atlanta-Douglasville and Talty (Dallas area), funded in part by an $800 million bank facility closed in August 2026.
- Headquarters
- Centennial, United States
- Founded
- 2018
- Ownership
- Private; backed by equity sponsors GI Partners and MSIP
- Tracked footprint
- 42 facilities in 1 country
- Website
- flexential.com
Data center business
- Flexential lists 42 data centers in 18 US markets on its site: Atlanta, Charlotte, Cincinnati, Dallas, Denver, Fort Lauderdale, Jacksonville, Las Vegas, Louisville, Minneapolis, Nashville, Philadelphia, Phoenix, Portland, Raleigh, Richmond, Salt Lake City and Tampa. It states a footprint of more than 3 million sq ft, more than 370 carriers and support for 80+ kW per cabinet.
- In April 2026 the company said it has more than 40 data centers and 360 MW of capacity online or under development across 18 US markets.
- Portland-Hillsboro is its largest cluster: six Hillsboro data centers listed at 5.3, 18, 36, 18, 36 and 27 MW of critical power. Denver has four sites (Aurora 6.75 MW, Centennial 1.6 MW, Englewood 18 MW and Parker 22.5 MW).
- Atlanta has five sites (Alpharetta, Douglasville 1 and 2, Norcross 1 and 2); after Norcross 2 the company expects about 800,000 sq ft and 73 MW in the Atlanta market.
- The company traces its roots to ViaWest (founded 1999) and Peak 10 (founded 2000); Peak 10 bought ViaWest in 2017 and the combined company rebranded as Flexential in 2018. It reports 800+ employees and more than 3,000 customers.
- Services run on its FlexAnywhere platform: colocation, cloud, interconnection, data protection and professional services, with a private network backbone of 100 Gbps+.
Recent updates
- Flexential announced private cloud services on VMware Cloud Foundation 9.
- Flexential closed $800 million of development financing from an eleven-bank group led by TD Securities for 36 MW in Atlanta-Douglasville, 36 MW in Portland-Hillsboro and 22.5 MW in Denver-Parker (all under construction), a second planned 36 MW Hillsboro facility and a planned 4.5 MW Norcross expansion.
- Flexential bought 110 acres in Talty, Kaufman County, Texas for a campus of up to three 36 MW buildings (108 MW). Phase 1 has secured power for 36 MW; site work is expected in early 2027 and first customer availability in late 2028.
- Its private network backbone was upgraded to 400 Gbps across 15 data centers in Atlanta, Dallas, Denver and Portland, with more markets planned for the following year.
- The company bought the real estate of Hillsboro 4 (138,000 sq ft, 18 MW, fully leased) and Hillsboro 5 (358,000 sq ft, 36 MW), which it called the largest real estate transaction in its history.
- Its 2026 State of AI Infrastructure Report found that grid power availability decides where 89% of organisations deploy AI workloads.
- Flexential announced Atlanta – Norcross 2, a planned 48,000 sq ft, 4.5 MW data center at 2755 Northwoods Parkway, expected online in the first half of 2028.
Company details checked against company and official sources, 13 Oct 2026.
- Capacity under construction or planned (99 MW) is 0.3 times the operational base of 304 MW.
- Its largest operational site is Flexential Portland – Hillsboro 3 in Hillsboro, United States at 36 MW.
- The largest project in the pipeline is Atlanta – Douglasville 2 by Flexential (36 MW, under construction).
- 14 facilities publish a PUE figure; the lowest is 1.30 at Flexential Dallas – Plano (Flexential) and the median is 1.40.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Flexential development pipeline
Under construction and planned facilities with a stated capacity, largest first. 58.5 MW under construction and 40.5 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Atlanta – Douglasville 2Flexential | Douglasville, United States | Under construction | Colocation | 36 MW |
| Flexential Dallas-Talty 1Flexential | Talty, United States | Planned | Colocation | 36 MW |
| Flexential Denver – ParkerFlexential | Parker, United States | Under construction | Colocation | 22.5 MW |
| Atlanta – Norcross 2Flexential | Peachtree Corners, United States | Planned | Colocation | 4.5 MW |
Facilities
42 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Atlanta – Douglasville 2Colocation
History · 1 deal
|
Douglasville, United States | Under construction | 36 MW IT | — | Operator / official |
Flexential Dallas-Talty 1Colocation
History · 1 deal
|
Talty, United States | Planned | 36 MW IT | — | Operator / official |
| Flexential Portland – Hillsboro 3Colocation | Hillsboro, United States | Operational | 36 MW IT | — | Operator / official |
Flexential Portland – Hillsboro 5Colocation
History
|
Hillsboro, United States | Operational | 36 MW IT | — | Operator / official |
| Flexential Portland – Hillsboro 6Colocation | Hillsboro, United States | Operational | 27 MW IT | — | Operator / official |
| Atlanta – Douglasville 1Colocation | Douglasville, United States | Operational | 22.5 MW IT | — | Operator / official |
Flexential Denver – ParkerColocation
History · 1 deal
|
Parker, United States | Under construction | 22.5 MW IT | — | Operator / official |
| Flexential Dallas – PlanoColocation | Plano, United States | Operational | 18 MW IT | — | Operator / official |
| Flexential Denver – EnglewoodColocation | Englewood, United States | Operational | 18 MW IT | — | Operator / official |
| Flexential Portland – Hillsboro 2Colocation | Hillsboro, United States | Operational | 18 MW IT | — | Operator / official |
Flexential Portland – Hillsboro 4Colocation
History
|
Hillsboro, United States | Operational | 18 MW IT | — | Operator / official |
| Flexential Las Vegas – NorthColocation | North Las Vegas, United States | Operational | 9 MW IT | — | Operator / official |
| Flexential Minneapolis – ChaskaColocation | Chaska, United States | Operational | 9 MW IT | — | Operator / official |
| Philadelphia – Collegeville Data CenterColocation | Collegeville, United States | Operational | 7.2 MW IT | — | Operator / official |
| Flexential Denver – AuroraColocation | Aurora, United States | Operational | 6.8 MW IT | — | Operator / official |
| Flexential Dallas – Downtown DallasColocation | Dallas, United States | Operational | 6.7 MW IT | — | Operator / official |
| Atlanta – AlpharettaColocation | Alpharetta, United States | Operational | 6 MW IT | — | Operator / official |
| Nashville – FranklinColocation | Franklin, United States | Operational | 6 MW IT | — | Operator / official |
| Flexential Portland – Hillsboro 1Colocation | Hillsboro, United States | Operational | 5.3 MW IT | — | Operator / official |
| Flexential Phoenix – Deer ValleyColocation | Phoenix, United States | Operational | 5 MW IT | — | Operator / official |
Atlanta – Norcross 2Colocation
History · 1 deal
|
Peachtree Corners, United States | Planned | 4.5 MW IT | — | Operator / official |
| RaleighColocation | Morrisville, United States | Operational | 4.3 MW IT | — | Operator / official |
| Flexential CincinnatiColocation | West Chester, United States | Operational | 3.8 MW IT | — | Operator / official |
| Flexential Dallas – RichardsonColocation | Richardson, United States | Operational | 3.8 MW IT | — | Operator / official |
| Charlotte – NorthColocation | Charlotte, United States | Operational | 3.3 MW IT | — | Operator / official |
| Fort LauderdaleColocation | Fort Lauderdale, United States | Operational | 3.2 MW IT | — | Operator / official |
| Nashville – Cool SpringsColocation | Franklin, United States | Operational | 3.2 MW IT | — | Operator / official |
| Flexential Louisville – DowntownColocation | Louisville, United States | Operational | 3.1 MW IT | — | Operator / official |
| Tampa – NorthColocation | Tampa, United States | Operational | 3 MW IT | — | Operator / official |
| Richmond Data CenterColocation | Richmond, United States | Operational | 2.8 MW IT | — | Operator / official |
| Flexential Salt Lake City – DowntownColocation | Salt Lake City, United States | Operational | 2.7 MW IT | — | Operator / official |
| Charlotte – SouthColocation | Charlotte, United States | Operational | 2.4 MW IT | — | Operator / official |
| Flexential Salt Lake City – MillcreekColocation | Salt Lake City, United States | Operational | 1.9 MW IT | — | Operator / official |
| Tampa – WestColocation | Tampa, United States | Operational | 1.8 MW IT | — | Operator / official |
| Atlanta – Norcross 1Colocation | Norcross, United States | Operational | 1.8 MW IT | — | Operator / official |
| Flexential Denver – CentennialColocation | Centennial, United States | Operational | 1.6 MW IT | — | Operator / official |
| Nashville – BrentwoodColocation | Brentwood, United States | Operational | 1.5 MW IT | — | Operator / official |
| Flexential Louisville – EastColocation | Louisville, United States | Operational | 1.5 MW IT | — | Operator / official |
| JacksonvilleColocation | Jacksonville, United States | Operational | 1.4 MW IT | — | Operator / official |
| Flexential Las Vegas – DowntownColocation | Las Vegas, United States | Operational | 1.4 MW IT | — | Operator / official |
| Flexential Salt Lake City – South ValleyColocation | West Jordan, United States | Operational | 1.2 MW IT | — | Operator / official |
| Flexential Salt Lake City – Fair ParkColocation | Salt Lake City, United States | Operational | 0.5 MW IT | — | Operator / official |
Market position
How Flexential compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Flexential ranks #30 of 171 tracked operators by capacity, with 0.5% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Hillsboro also hosts 10 other tracked data center(s), run by QTS, Aligned Data Centers, STACK Infrastructure and NTT DATA.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Hillsboro
- QTS Hillsboro 2 · QTS · Operational · 180 MW
- QTS Hillsboro 3 · QTS · Planned · 100 MW
- Aligned PDX-01 Hillsboro · Aligned Data Centers · Under construction · 72 MW
- STACK Infrastructure POR03 Hillsboro · STACK Infrastructure · Operational · 72 MW
- NTT DATA Hillsboro HI1 · NTT DATA · Operational · 36 MW
- QTS Hillsboro 1 DC1 · QTS · Operational · 20 MW
- Aligned PDX-02 Hillsboro · Aligned Data Centers · Planned
- Digital Realty PDX10 Hillsboro · Digital Realty · Operational
- Digital Realty PDX12 Hillsboro · Digital Realty · Operational
- STACK Infrastructure POR01 Hillsboro · STACK Infrastructure · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Flexential operate?
DC Market Insights tracks 42 Flexential data center(s) in 1 country as of October 2026: 38 operational, 2 under construction and 2 planned.
Where is Flexential headquartered?
Flexential is headquartered in Centennial, United States. Ownership: Private; backed by equity sponsors GI Partners and MSIP.
Which other companies operate data centers in United States?
Besides Flexential, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Hillsboro?
Other tracked data centers in Hillsboro include QTS Hillsboro 2 (QTS), QTS Hillsboro 3 (QTS), Aligned PDX-01 Hillsboro (Aligned Data Centers) and STACK Infrastructure POR03 Hillsboro (STACK Infrastructure).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
