Proprietary data
Ark Data Centers Data Centers
Data centers operated by Ark Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 7 November 2026, DC Market Insights tracks 10 data centers operated by Ark Data Centers in 1 country, of which 10 are operational. Stated operational capacity is 10 MW.
MW = IT capacity where the source states it, otherwise total capacity. 9 of 10 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Ark Data Centers data centers: key facts
About Ark Data Centers
Ark Data Centers (Ark, formerly Involta) is a US edge colocation, hybrid cloud and network provider based in Cedar Rapids, Iowa. Its site says Ark operates 10 enterprise-class, Tier III data centers across seven edge markets: Tucson (AZ), Boise (ID), Cedar Rapids (IA), Duluth (MN), Akron I and II, Canton and Cleveland (OH), Pittsburgh (PA) and Green Bay (WI), where it is building a campus of up to 20 MW. Funds managed by Carlyle have owned the company since February 2022.
- Headquarters
- Cedar Rapids, United States
- Founded
- 2007
- Ownership
- Private; funds managed by Carlyle (acquired from M/C Partners, closed 1 Feb 2022)
- Parent company
- Carlyle (funds managed by Carlyle)
- Tracked footprint
- 10 facilities in 1 country
- Website
- arkdna.com
Data center business
- Ark runs two internet exchanges in its own buildings: the Tucson Internet Exchange (TUSIX), launched in October 2023, and the Idaho Internet Exchange (IdahoIX) in the Boise data center, expanded in March 2025.
- Its SecurePower colocation model, launched in January 2024, prices by kW instead of cabinet space. The 2023 ESG report listed ENERGY STAR certification for six data centers, 44% carbon-free energy in 2023 (35% in 2022) and a goal of 100% carbon-free electricity across its sites by 2030.
- In Green Bay, Ark (then Involta) bought a 24.5-acre site with an existing data center in December 2023 and plans a multi-phase campus of up to 20 MW; the release called it the company's 13th data center location. Ark opened the site on 12 June 2024 with the Village of Harrison.
- When Carlyle agreed to buy the company in December 2021, it owned and operated 12 data center facilities and a 12,000+ fiber-mile network, mainly in the Midwest plus the Pacific Northwest and Southwest. The deal closed on 1 February 2022; financial terms were not disclosed.
- Ark says it operates 10 enterprise-class, Tier III data centers across seven edge markets. Its location list names Tucson, Boise, Cedar Rapids, Duluth, Akron I and II, Canton, Cleveland, Pittsburgh and Green Bay. All sites are owned and operated by the company and sold as colocation (cages, full, half and third cabinets) with remote and smart-hands support.
- Facility specification pages give the capacity of each site: Tucson 2,072 kW on 20,000 sq ft (600 racks); Pittsburgh 1,500 kW on 11,200 sq ft; Boise, Duluth, Cleveland and each Akron building 1,000 kW on 10,000 sq ft; Cedar Rapids 810 kW; Canton 650 kW on 5,600 sq ft. The Ohio page lists utility power of 5 MW for Akron, 2.5 MW for Cleveland and 1.5 MW for Canton.
- Ark owns four data centers in northeast Ohio with nearly 100,000 sq ft of space, linked by its own fiber; it says it owns and manages nearly 10,000 fiber miles across Ohio and western Pennsylvania, with 10 fiber rings and a sub-millisecond ring between Akron and Cleveland.
- Uptime Institute Tier III certification is stated for Akron II (design documents and constructed facility), Cleveland and Pittsburgh. The fleet is audited against PCI, HIPAA, SOX, JSOX, GLBA, NIST 800-53 based controls, SOC 1 and SOC 2.
Recent updates
- 2 Sep 2026: Ark said it supports Akron Children's Hospital as an infrastructure partner and joined the hospital's Information Services Department event in Akron.
- 5 Feb 2026: Ark reached Champion Elevate Service Provider Partner status with Nutanix and moved its Ark Cloud to the Nutanix Cloud Platform, adding integrated disaster recovery and storage services for customers leaving VMware.
- 15 May 2024: Involta rebranded as Ark (website arkdna.com), saying it would invest in expanding existing locations for enterprise and hyperscale edge capacity.
- The company's leadership page now names Marc McGrady as Chief Executive Officer, a former founding partner of Carlyle Airport Group; the February 2026 Nutanix release had quoted Bruce Lehrman as CEO.
Company details checked against company and official sources, 7 Nov 2026.
- Its largest operational site is Ark Tucson Data Center in Tucson, United States at 2.1 MW.
- 9 of 10 facilities have a capacity stated by their source; the totals above count only those.
Facilities
10 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Ark Tucson Data CenterColocation
History
|
Tucson, United States | Operational | 2.1 MW | — | Operator / official |
| Ark Pittsburgh Data CenterColocation | Pittsburgh, United States | Operational | 1.5 MW | — | Operator / official |
| Ark Akron I Data CenterColocation | Akron, United States | Operational | 1 MW | — | Operator / official |
| Ark Akron II Data CenterColocation | Akron, United States | Operational | 1 MW | — | Operator / official |
| Ark Boise Data CenterColocation Owned: (owned and operated by Ark Data Centers; carrier-neutral colo) | Boise, United States | Operational | 1 MW | — | Operator / official |
| Ark Cleveland Data CenterColocation | Cleveland, United States | Operational | 1 MW | — | Operator / official |
| Ark Duluth Data CenterColocation | Duluth, United States | Operational | 1 MW | — | Operator / official |
| Ark Cedar Rapids Data CenterColocation | Cedar Rapids, United States | Operational | 0.8 MW | — | Operator / official |
| Ark Canton Data CenterColocation | Canton, United States | Operational | 0.7 MW | — | Operator / official |
Ark Green Bay Data CenterColocation
History
|
Harrison, United States | Operational | — | — | Operator / official |
Market position
How Ark Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Ark Data Centers ranks #57 of 171 tracked operators by capacity, with 0% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Akron also hosts 1 other tracked data center(s), run by Cogent.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Akron
- Akron Data Center · Cogent · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Ark Data Centers operate?
DC Market Insights tracks 10 Ark Data Centers data center(s) in 1 country as of November 2026: 10 operational, 0 under construction and 0 planned.
Where is Ark Data Centers headquartered?
Ark Data Centers is headquartered in Cedar Rapids, United States. Ownership: Private; funds managed by Carlyle (acquired from M/C Partners, closed 1 Feb 2022).
Which other companies operate data centers in United States?
Besides Ark Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Akron?
Other tracked data centers in Akron include Akron Data Center (Cogent).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
