Proprietary data
DC BLOX Data Centers
Data centers operated by DC BLOX that we have verified: location, status and capacity, each checked against its source.
In short
As of 8 October 2026, DC Market Insights tracks 10 data centers operated by DC BLOX in 1 country, of which 4 are operational. Stated operational capacity is 8 MW.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 10 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
DC BLOX data centers: key facts
About DC BLOX
DC BLOX provides data centers, regional dark fiber networks and subsea cable landing stations in the Southeastern US. As stated in its press release of 6 October 2026, it has 12 data center campuses in operation or development totaling 470 MW of critical power, a dark fiber network of about 600 miles, and cable landing stations in Myrtle Beach, SC and Palm Coast, FL.
- Headquarters
- Atlanta, United States
- Founded
- 2014
- Ownership
- Equity investors led by Post Road Group and Bain Capital Credit (Oct 2024)
- Tracked footprint
- 10 facilities in 1 country
- Website
- dcblox.com
Company details checked against company and official sources, 10 Oct 2026.
- Its largest operational site is Birmingham in Birmingham, United States at 5 MW.
- By type, the tracker lists 4 colocation, 3 hyperscale and 2 edge facilities.
- 2 of 10 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Facilities
10 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| BirminghamColocation | Birmingham, United States | Operational | 5 MW IT | — | Operator / official |
DC BLOX Greenville Data CenterColocation
History
|
Greenville, United States | Operational | 3 MW IT | — | Operator / official |
| Atlanta East Hyperscale Data Center CampusHyperscale | Conyers, United States | Under construction | — | — | Operator / official |
| Atlanta West Hyperscale Data Center CampusHyperscale | Lithia Springs, United States | Planned | — | — | Operator / official |
| BHM1-BHyperscale | Birmingham, United States | Planned | — | — | Operator / official |
| DC BLOX Camp Hall campusColocation | United States | Planned | — | — | Trade press |
| DC BLOX Myrtle Beach Cable Landing StationEdge Cooling: Evaporative or adiabatic | Myrtle Beach, United States | Operational | — | — | Operator / official |
| DC BLOX North AugustaEdge | North Augusta, United States | Planned | — | — | Operator / official |
| HuntsvilleColocation | Huntsville, United States | Operational | — | — | Operator / official |
| Palm Coast Cable Landing StationOther | Palm Coast, United States | Planned | — | — | Operator / official |
Market position
How DC BLOX compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, DC BLOX ranks #61 of 171 tracked operators by capacity, with 0% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does DC BLOX operate?
DC Market Insights tracks 10 DC BLOX data center(s) in 1 country as of October 2026: 4 operational, 1 under construction and 5 planned.
Where is DC BLOX headquartered?
DC BLOX is headquartered in Atlanta, United States. Ownership: Equity investors led by Post Road Group and Bain Capital Credit (Oct 2024).
Which other companies operate data centers in United States?
Besides DC BLOX, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.