Proprietary data
EdgeCore Digital Infrastructure Data Centers
Data centers operated by EdgeCore Digital Infrastructure that we have verified: location, status and capacity, each checked against its source.
In short
As of 19 November 2026, DC Market Insights tracks 9 data centers operated by EdgeCore Digital Infrastructure in 1 country, of which 2 are operational. Stated operational capacity is 98 MW, with a further 330 MW under construction and 1,546 MW planned. The pipeline is 19.1 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 7 of 9 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
EdgeCore Digital Infrastructure data centers: key facts
About EdgeCore Digital Infrastructure
EdgeCore Digital Infrastructure is a Denver-based wholesale data center developer, owner and operator that builds single-tenant, high-density campuses for hyperscale cloud and AI customers. Its website (November 2026) states a 2.27+ GW data center portfolio in six U.S. markets: Ashburn, Culpeper and Louisa County in Virginia, Mesa (Greater Phoenix) in Arizona, the Reno area in Nevada and Santa Clara in California, with $16.1 billion of planned investment. Partners Group has owned the company since November 2022.
- Headquarters
- Denver, United States
- Ownership
- Privately held; owned by Partners Group on behalf of its clients since November 2022
- Parent company
- Partners Group
- Tracked footprint
- 9 facilities in 1 country
- Website
- edgecore.com
Data center business
- EdgeCore develops and operates high-density, single-tenant data centers exclusively for large cloud and AI companies. The company states a 2.27+ GW data center portfolio, $8 billion of capital currently committed and $16.1 billion of planned investment across six U.S. markets chosen for land suitable for 300+ MW campuses.
- Greater Phoenix (Mesa): 84 acres, 5 data centers, 496 MW of critical IT load and 2.7M sq ft at full build-out. The first building, PH01, received Green Globes certification in 2023; power is supplied by Salt River Project and the campus uses a closed-loop air-cooled design with WUE below 0.01 L/kWh.
- Northern Virginia: two Ashburn-area sites on Maries Road and Moran Road in Sterling (AS01 and AS02) total 114 MW of critical IT load and 685,000 sq ft on 17 acres, powered by Dominion Energy. Culpeper Technology Zone campus: 93 acres, 2 data centers, 196 MW of critical IT load, capacity available from mid-2029.
- Louisa County, Virginia: 697 acres in the Shannon Hill Regional Business Park, bought in June 2025, planned for six or more data centers with 1.1+ GW of critical IT load and 3.1M sq ft at full build-out; power through Rappahannock Electric Cooperative.
- Reno area, Nevada: three-building campus on 56 acres in the Tahoe-Reno Industrial Center, Storey County, with 216 MW of critical IT load and nearly 1M sq ft on completion and contracted near-term power.
- Silicon Valley: two-building, 12-acre campus in Santa Clara with 72 MW of critical IT load and 540,000 sq ft, designed for PUE below 1.3. Construction of the first building began in January 2023 with Silicon Valley Power as utility.
- Financing: since the Partners Group acquisition EdgeCore has committed more than $5.9 billion of equity and debt (January 2026). Its stabilized buildings PH01 (26 MW, Mesa) and SV01 (36 MW, Santa Clara) back two green asset-backed securitizations and are leased to the same investment-grade hyperscale tenant.
Recent updates
- Completed a $521 million green asset-backed securitization backed by the fully stabilized SV01 data center (36 MW IT) on the Santa Clara campus; financeable IT capacity across its two ABS deals now totals 62 MW.
- Signed the Ratepayer Protection Pledge, committing to bring, build or buy the power its facilities need and pay for new power delivery infrastructure.
- Hired Greg Thompson as SVP, Enterprise Security, to lead a new physical and cybersecurity function.
- Closed $1.5 billion of limited-recourse construction loans for AS01 and AS02 in Sterling, Virginia (114 MW combined). Initial occupancy of AS01 is scheduled for November 2026 and AS02 for July 2027; over 1.4 GW is under development in Northern and Central Virginia.
- Said it entered 2026 with more than 1.8 GW of capacity delivered or under development across about seven million sq ft, and met 10 of 10 construction milestones in 2025.
- Completed a $235 million green ABS backed by the stabilized PH01 data center (26 MW IT) in Mesa, leased to a single hyperscale tenant.
- Bought 697 acres in Louisa County, Virginia, for a 1.1+ GW campus with planned investment of more than $17 billion.
- Bought another 43.87 acres in Mesa, taking its Greater Phoenix market to over 450 MW; 206 MW had been built and commissioned at the first Mesa campus and PH02 and PH03 were under construction for completion in 2025 and 2026.
Company details checked against company and official sources, 19 Nov 2026.
- Capacity under construction or planned (1,876 MW) is 19.1 times the operational base of 98 MW.
- Its largest operational site is EdgeCore Silicon Valley Campus in Santa Clara, United States at 72 MW.
- The largest project in the pipeline is EdgeCore Louisa County Campus (Shannon Hill) (1,100 MW, planned).
- 7 of 9 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
EdgeCore Digital Infrastructure development pipeline
Under construction and planned facilities with a stated capacity, largest first. 330 MW under construction and 1,546 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| EdgeCore Louisa County Campus (Shannon Hill)EdgeCore Digital Infrastructure | Louisa, United States | Planned | Hyperscale | 1,100 MW |
| EdgeCore Mesa expansion parcelEdgeCore Digital Infrastructure | Mesa, United States | Planned | Hyperscale | 250 MW |
| EdgeCore Reno campusEdgeCore Digital Infrastructure | United States | Under construction | Hyperscale | 216 MW |
| EdgeCore Culpeper Campus (Culpeper Technology Zone)EdgeCore Digital Infrastructure | Culpeper, United States | Planned | Hyperscale | 196 MW |
| EdgeCore Ashburn Campus (Maries Road and Moran Road)EdgeCore Digital Infrastructure | Sterling, United States | Under construction | Hyperscale | 114 MW |
Facilities
9 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
EdgeCore Louisa County Campus (Shannon Hill)Hyperscale
History
|
Louisa, United States | Planned | 1,100 MW IT | — | Operator / official |
EdgeCore Mesa expansion parcelHyperscale
History
|
Mesa, United States | Planned | 250 MW IT | — | Operator / official |
EdgeCore Reno campusHyperscale
Cooling: Chilled water, dry coolers
History
|
United States | Under construction | 216 MW IT | — | Operator / official |
EdgeCore Culpeper Campus (Culpeper Technology Zone)Hyperscale
History
|
Culpeper, United States | Planned | 196 MW IT | — | Operator / official |
EdgeCore Ashburn Campus (Maries Road and Moran Road)Hyperscale
History · 1 deal
|
Sterling, United States | Under construction | 114 MW IT | — | Operator / official |
EdgeCore Silicon Valley CampusHyperscale
History · 1 deal
|
Santa Clara, United States | Operational | 72 MW IT | — | Operator / official |
EdgeCore PH01 MesaHyperscale
History
|
Mesa, United States | Operational | 26 MW IT | — | Operator / official |
| EdgeCore PH02 MesaHyperscale | Mesa, United States | Under construction | — | — | Operator / official |
| EdgeCore PH03 MesaHyperscale | Mesa, United States | Under construction | — | — | Operator / official |
Market position
How EdgeCore Digital Infrastructure compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, EdgeCore Digital Infrastructure ranks #12 of 171 tracked operators by capacity, with 2.5% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Mesa also hosts 10 other tracked data center(s), run by Novva Data Centers, NTT DATA, Centersquare and Apple.
- Our Deal Tracker lists 1 deal(s) naming EdgeCore Digital Infrastructure, the latest on 28 October 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Mesa
- Novva Project Borealis Mesa · Novva Data Centers · Planned · 300 MW
- NTT DATA Phoenix PH1 · NTT DATA · Operational · 36 MW
- NTT DATA Phoenix PH4 · NTT DATA · Planned · 36 MW
- Centersquare PHX3 Mesa · Centersquare · Operational · 8 MW
- Apple Mesa data center · Apple · Operational
- AWS Mesa Elliot Road campus · Amazon Web Services · Planned
- AWS Mesa Pecos Road campus · Amazon Web Services · Planned
- Google Mesa data center · Google · Under construction
- Meta Mesa Data Center · Meta · Operational
- NTT DATA Mesa Pecos & Crismon campus · NTT DATA · Planned
Deals naming EdgeCore Digital Infrastructure
- ABS investors (MUFG sole structuring advisor; ING and MUFG joint book-runners) → EdgeCore SV01 data center, Santa Clara, California (36 MW IT) Financing $521.0M
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does EdgeCore Digital Infrastructure operate?
DC Market Insights tracks 9 EdgeCore Digital Infrastructure data center(s) in 1 country as of November 2026: 2 operational, 4 under construction and 3 planned.
Where is EdgeCore Digital Infrastructure headquartered?
EdgeCore Digital Infrastructure is headquartered in Denver, United States. Ownership: Privately held; owned by Partners Group on behalf of its clients since November 2022.
Which other companies operate data centers in United States?
Besides EdgeCore Digital Infrastructure, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Mesa?
Other tracked data centers in Mesa include Novva Project Borealis Mesa (Novva Data Centers), NTT DATA Phoenix PH1 (NTT DATA), NTT DATA Phoenix PH4 (NTT DATA) and Centersquare PHX3 Mesa (Centersquare).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.