Proprietary data

Menlo Digital Data Centers

Data centers operated by Menlo Digital that we have verified: location, status and capacity, each checked against its source.

In short

As of 8 October 2026, DC Market Insights tracks 3 data centers operated by Menlo Digital in 1 country, of which 0 are operational.

3Facilities tracked
1Countries
—Operational (0 sites)
48 MWUnder construction (1 site)
444 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 3 facilities have a stated capacity; the others are counted as sites only.

Menlo Digital MD-DC1 Herndon · Menlo Digital · Herndon (approximate location)Menlo Digital MD-VA2 Sterling · Menlo Digital · Sterling (approximate location)Menlo Digital MD-VA3 Richmond · Menlo Digital · Richmond (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Menlo Digital data centers: key facts

  • The largest project in the pipeline is Menlo Digital MD-VA3 Richmond (300 MW, planned).
Capacity by status, MW
Under construction48 MW
Planned444 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Menlo Digital development pipeline

Under construction and planned facilities with a stated capacity, largest first. 48 MW under construction and 444 MW planned in total.

ProjectLocationStatusTypeCapacity
Menlo Digital MD-VA3 RichmondMenlo Digital Richmond, United States Planned Hyperscale 300 MW
Menlo Digital MD-VA2 SterlingMenlo Digital Sterling, United States Planned Hyperscale 144 MW
Menlo Digital MD-DC1 HerndonMenlo Digital Herndon, United States Under construction Hyperscale 48 MW

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Menlo Digital MD-VA3 RichmondHyperscale Richmond, United States Planned 300 MW total — Trade press
Menlo Digital MD-VA2 SterlingHyperscale Sterling, United States Planned 144 MW total — Trade press
Menlo Digital MD-DC1 HerndonHyperscale Herndon, United States Under construction 48 MW IT — Operator / official

Market position

How Menlo Digital compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Menlo Digital ranks #26 of 171 tracked operators by capacity, with 0.6% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Sterling also hosts 10 other tracked data center(s), run by Centersquare, CyrusOne, EdgeCore Digital Infrastructure and Vantage Data Centers.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Menlo Digital rank by capacity#26of 171 operators · 0.6%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Other data centers in Sterling

  • Centersquare Sterling IAD1 · Centersquare · Operational · 143 MW
  • CyrusOne Sterling NVA5-NVA7 · CyrusOne · Operational · 116 MW
  • EdgeCore Ashburn Campus (Maries Road and Moran Road) · EdgeCore Digital Infrastructure · Under construction · 114 MW
  • Vantage Ashburn II (VA2) campus · Vantage Data Centers · Planned · 96 MW
  • QTS Ashburn 2 · QTS · Operational · 75 MW
  • Aligned IAD-03 · Aligned Data Centers · Operational · 72 MW
  • QTS Ashburn 1 DC1 · QTS · Operational · 55 MW
  • CyrusOne Sterling NVA1-NVA3 · CyrusOne · Operational · 44 MW
  • CyrusOne Sterling NVA9 · CyrusOne · Operational · 38 MW
  • Centersquare Sterling IAD2 · Centersquare · Operational · 35.8 MW

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Menlo Digital operate?

DC Market Insights tracks 3 Menlo Digital data center(s) in 1 country as of October 2026: 0 operational, 1 under construction and 2 planned.

Which other companies operate data centers in United States?

Besides Menlo Digital, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Sterling?

Other tracked data centers in Sterling include Centersquare Sterling IAD1 (Centersquare), CyrusOne Sterling NVA5-NVA7 (CyrusOne), EdgeCore Ashburn Campus (Maries Road and Moran Road) (EdgeCore Digital Infrastructure) and Vantage Ashburn II (VA2) campus (Vantage Data Centers).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst