Proprietary data
Midco Data Centers
Data centers operated by Midco that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 November 2026, DC Market Insights tracks 4 data centers operated by Midco in 1 country, of which 4 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 0 of 4 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Midco data centers: key facts
About Midco
Midco (Midcontinent Communications) is a Midwest broadband, TV and phone provider that runs four data centers in North Dakota and South Dakota: Tier III, SOC 2 certified purpose-built facilities in Sioux Falls, SD (11,000 sq ft) and Fargo, ND (16,000 sq ft), plus Tier II sites in Yankton, SD and Grand Forks, ND. It offers colocation from half racks to private suites, connected to its own fiber network with links to carrier hotels in Minneapolis, Chicago, Omaha, Kansas City and Denver. Midco serves more than 400,000 customers in five states.
- Headquarters
- United States
- Founded
- 1931
- Ownership
- Private; parent Midcontinent Media, Inc. (MMI), co-owned by Pat McAdaragh and Steve Grosser
- Parent company
- Midcontinent Media, Inc. (MMI)
- Tracked footprint
- 4 facilities in 1 country
- Website
- business.midco.com
Data center business
- The Fargo data center opened in July 2018 as Midco's fourth data center. The 16,000 sq ft building is expandable to 28,000 sq ft, is built to Tier III specifications with concurrent maintainability, is flood-averse and has an EF3-rated shell rated for 150 mph sustained winds.
- Midco lists two flagship data centers: Sioux Falls, SD, an 11,000-square-foot purpose-built facility with more than 9,000 sq ft of raised floor, and Fargo, ND, a 16,000-square-foot purpose-built facility with more than 7,500 sq ft of raised floor. Both are described as Tier III and SOC 2 compliance certified.
- Midco also has data centers in Yankton, SD and Grand Forks, ND, listed as Tier II facilities with dual fiber entrances, carrier-neutral access, backup generators and cabinet or private cage space.
- Fargo facility data sheet: isolated A and B electrical rooms, dual 1.75 MW generators with automatic transfer, redundant UPS, 2N backup power for 48 hours or longer with fuel contracts, N+1 HVAC, economizer cooling and four diverse fiber points of entry. Midco does not publish IT load in MW for any site.
- Sioux Falls facility data sheet: designed to Uptime Tier III specifications, EF3-rated shell, badge entry with man trap, dual generators, redundant UPS, N+1 HVAC and two diverse fiber points of entry. Wholesale and retail colocation is offered, nine miles from Sioux Falls Regional Airport.
- Customers can take a half rack, multiple racks or private suites, with metered PDUs per cabinet and on-site smart hands services. Midco markets the four sites as a multi-location set across North Dakota and South Dakota, so a customer can use one as primary and replicate to another over diverse networks.
- The data centers connect over Midco's owned fiber network to points of presence in Minneapolis, Chicago, Omaha, Kansas City and Denver. The network is watched 24/7 by the Midco Network Operations Center and carries MEF 3.0 Carrier Ethernet certification.
Recent updates
- 29 Oct 2026: Midco finished a multi-year fiber expansion in the Yankton, SD area near Lewis and Clark Recreation Area, more than $5.4 million of network work serving about 658 addresses.
- 29 Oct 2026: Midco completed fiber network construction in Janesville, MN: 19 miles of fiber passing 1,187 homes and businesses.
- 27 Oct 2026: Midco said CEO Pat McAdaragh will retire on 1 March 2027 and President and COO Ben Dold will become President and CEO. McAdaragh stays Chair and President of parent Midcontinent Media, Inc.; the release says the $500 million Fiber Forward programme begun in 2021 is nearing completion.
- 14 Sep 2026: Midco launched Beyond Gig 3.0 with a new 4 Gig x 1 Gig internet tier in eligible markets and Wi-Fi 7 equipment for home and business customers.
Company details checked against company and official sources, 10 Nov 2026.
- 0 of 4 facilities have a capacity stated by their source; the totals above count only those.
Facilities
4 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Midco Fargo Data CenterColocation | Fargo, United States | Operational | — | 2018 | Operator / official |
| Midco Grand Forks Data CenterColocation | Grand Forks, United States | Operational | — | — | Operator / official |
| Midco Sioux Falls Data CenterColocation | Sioux Falls, United States | Operational | — | — | Operator / official |
| Midco Yankton Data CenterColocation | Yankton, United States | Operational | — | — | Operator / official |
Market position
How Midco compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Midco is one of 171 operators we track.
- United States has 1,317 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Midco operate?
DC Market Insights tracks 4 Midco data center(s) in 1 country as of November 2026: 4 operational, 0 under construction and 0 planned.
Where is Midco headquartered?
Midco is headquartered in United States. Ownership: Private; parent Midcontinent Media, Inc. (MMI), co-owned by Pat McAdaragh and Steve Grosser.
Which other companies operate data centers in United States?
Besides Midco, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
