Proprietary data

Springfield City Group Data Centers

Data centers operated by Springfield City Group that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 1 data center operated by Springfield City Group in 1 country (1 operational).

1Facilities tracked
1Countries
—Operational (1 site)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 1 facilities have a stated capacity; the others are counted as sites only.

Polaris Data Centre · Springfield City Group · Brisbane (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Springfield City Group data centers: key facts

  • 0 of 1 facilities have a capacity stated by their source; the totals above count only those.

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Polaris Data CentreColocation Brisbane, Australia Operational — — Operator / official

Market position

How Springfield City Group compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Australia, Springfield City Group is one of 11 operators we track.
  • Australia has 82 tracked data centers from 11 operators: 2,206 MW operational and 4,511 MW under construction or planned.
  • Brisbane also hosts 3 other tracked data center(s), run by NEXTDC and Equinix.

Data center operators in Australia

Tracked facilities8211 operators
Operational capacity2,206 MW4,511 MW in the pipeline
Springfield City Group rank by capacity#11of 11 operators
Renewable share of generation39%2025
OperatorFacilitiesOperational MWPipeline MW
NEXTDC26557 MW2,367 MW
CDC Data Centres12667 MW943 MW
AirTrunk6700 MW354 MW
Keppel2—720 MW
STACK Infrastructure4180 MW—
DCI Data Centers65.4 MW63 MW
Macquarie Data Centres368 MW—
Vantage Data Centers1—64 MW

All data centers in Australia Power and policy in Australia

Other data centers in Brisbane

  • B2 Brisbane · NEXTDC · Operational · 12 MW
  • B1 Brisbane · NEXTDC · Operational · 2.3 MW
  • BR1 · Equinix · Operational

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Springfield City Group operate?

DC Market Insights tracks 1 Springfield City Group data center(s) in 1 country as of November 2026: 1 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Australia?

Besides Springfield City Group, the largest operators we track in Australia by capacity are NEXTDC, CDC Data Centres, AirTrunk, Keppel and STACK Infrastructure. The Australia page lists all 11 operators.

What rules apply to data centers in Australia?

Our Power & Policy Tracker lists 17 government actions on data centers and power in Australia, including 0 restriction(s) and 2 incentive scheme(s) in force.

Which other data centers are in Brisbane?

Other tracked data centers in Brisbane include B2 Brisbane (NEXTDC), B1 Brisbane (NEXTDC) and BR1 (Equinix).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst