Proprietary data

TRG Datacenters Data Centers

Data centers operated by TRG Datacenters that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 3 data centers operated by TRG Datacenters in 1 country, of which 2 are operational. Stated operational capacity is 6 MW.

3Facilities tracked
1Countries
6 MWOperational (2 sites)
—Under construction (0 sites)
—Planned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 3 facilities have a stated capacity; the others are counted as sites only.

TRG Datacenters HOU1 Spring · TRG Datacenters · Spring (approximate location)TRG Datacenters HOU2 & HOU3 Spring · TRG Datacenters · Spring (approximate location)TRG Datacenters DFW1 Farmers Branch · TRG Datacenters · Farmers Branch (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

TRG Datacenters data centers: key facts

  • Its largest operational site is TRG Datacenters HOU1 Spring in Spring, United States at 6 MW.
  • 1 of 3 facilities have a capacity stated by their source; the totals above count only those.

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
TRG Datacenters HOU1 SpringColocation Spring, United States Operational 6 MW total — Operator / official
TRG Datacenters DFW1 Farmers BranchColocation Farmers Branch, United States Planned — — Operator / official
TRG Datacenters HOU2 & HOU3 SpringColocation Spring, United States Operational — — Operator / official

Market position

How TRG Datacenters compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, TRG Datacenters ranks #63 of 171 tracked operators by capacity, with 0% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
TRG Datacenters rank by capacity#63of 171 operators · 0%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does TRG Datacenters operate?

DC Market Insights tracks 3 TRG Datacenters data center(s) in 1 country as of October 2026: 2 operational, 0 under construction and 1 planned.

Which other companies operate data centers in United States?

Besides TRG Datacenters, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst