As of 25 November 2026, DC Market Insights tracks 8 data centers in Portugal run by 4 operators: 5 operational, 0 under construction and 3 planned. Stated operational capacity is 42.6 MW, with a further — under construction and 216 MW planned. Start Campus holds the largest share of tracked operational capacity (88%).

8Facilities tracked
4Operators
42.6 MWOperational (5 sites)
—Under construction (0 sites)
216 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 4 of 8 facilities have a stated capacity; the others are counted as sites only.

Equinix LS1 · Equinix · Lisbon (approximate location)Equinix LS2 · Equinix · Lisbon (approximate location)Digital Realty LIS1 · Digital Realty · Carnaxide (approximate location)AtlasEdge LIS001 · AtlasEdge · Carnaxide (approximate location)AtlasEdge LIS002 · AtlasEdge · Carnaxide (approximate location)AtlasEdge LIS003 · AtlasEdge · Carnaxide (approximate location)Start Campus SIN01 · Start Campus · Sines (approximate location)Start Campus SIN02 · Start Campus · Sines (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Portugal data center market: key facts

  • Capacity under construction or planned (216 MW) is 5.1 times the operational base of 42.6 MW.
  • The three largest operators by operational capacity, Start Campus, AtlasEdge and Equinix, hold 100% of tracked operational MW.
  • Start Campus has the largest development pipeline in Portugal: 200 MW under construction or planned.
  • The largest operational facility we track is Start Campus SIN01 (Start Campus, Sines) at 37.5 MW.
  • The largest project in the pipeline is Start Campus SIN02 (200 MW, planned).
  • Sines is the largest cluster: 2 of 8 facilities and 92% of tracked capacity.
  • By type, the tracker lists 6 colocation and 2 hyperscale facilities.
  • 4 of 8 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational42.6 MW
Planned216 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Portugal by tracked capacity, MW
AtlasEdge21.1 MW

OperationalUnder construction or planned

Capacity by market in Portugal, MW
Sines238 MW
Lisbon21.1 MW

OperationalUnder construction or planned

Facilities by type
Colocation6
Hyperscale2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Portugal

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
AtlasEdge35.1 MW16 MW12%
Start Campus237.5 MW200 MW88%
Equinix2———
Digital Realty1———

Largest data center projects in Portugal

Under construction and planned facilities with a stated capacity, largest first. — under construction and 216 MW planned in total.

ProjectLocationStatusTypeCapacity
Start Campus SIN02Start Campus Sines Planned Hyperscale 200 MW
AtlasEdge LIS002AtlasEdge Carnaxide Planned Colocation 16 MW

How Portugal compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom207551,064 MW7,741 MW
Germany20364933 MW4,386 MW
France10920338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland461953 MW1,458 MW
Italy2211245 MW1,193 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Netherlands11034217 MW449 MW
Iceland73286 MW—

Data center deals in Portugal

Our Deal Tracker lists 3 deals in Portugal since February 2026, with $10.83B in disclosed value.

  • NxN Data Centers → 1MW operational data center in Évora M&A · 1 MW

All Portugal deals in the Deal Tracker

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Start Campus SIN02Start Campus Sines Planned 200 MW — Operator / official
Start Campus SIN01Start Campus Sines Operational 37.5 MW — Operator / official
AtlasEdge LIS002AtlasEdge Carnaxide Planned 16 MW — Operator / official
AtlasEdge LIS001AtlasEdge Carnaxide Operational 5.1 MW — Operator / official
AtlasEdge LIS003AtlasEdge Carnaxide Planned — — Operator / official
Digital Realty LIS1Digital Realty Carnaxide Operational — — Operator / official
Equinix LS1Equinix Lisbon Operational — — Operator / official
Equinix LS2Equinix Lisbon Operational — — Operator / official

Get the data

Every data center in Portugal, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,387 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Portugal

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Portugal

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Portugal?

DC Market Insights tracks 8 data centers in Portugal as of November 2026: 5 operational, 0 under construction and 3 planned, run by 4 operators. The count grows as we verify more sites.

What is the data center capacity of Portugal?

Tracked operational capacity in Portugal is 42.6 MW, with — under construction and 216 MW planned. These totals use the capacity each source states (IT load where given) and cover 4 of 8 tracked facilities.

Which companies operate the most data center capacity in Portugal?

By tracked operational capacity, the largest operators in Portugal are Start Campus (37.5 MW) and AtlasEdge (5.1 MW).

Where are the data centers in Portugal located?

The largest clusters by tracked capacity are Sines (2 facilities) and Lisbon (6 facilities). The map above shows every site.

Which new data centers are being built in Portugal?

We track — under construction and 216 MW planned. The largest projects are Start Campus SIN02 (200 MW) and AtlasEdge LIS002 (16 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy