Data Centers in Uruguay

Every data center in Uruguay that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 5 November 2026, DC Market Insights tracks 9 data centers in Uruguay run by 5 operators: 4 operational, 1 under construction and 4 planned.

9Facilities tracked
5Operators
—Operational (4 sites)
—Under construction (1 site)
500 MWPlanned (4 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 9 facilities have a stated capacity; the others are counted as sites only.

Google Uruguay data center (Parque de las Ciencias) · Google · Colonia Nicolich (approximate location)Antel Data Center Internacional Ing. José Luis Massera · Antel · Pando (approximate location)Antel Montevideo data center · Antel · Montevideo (approximate location)Zonamerica Data Center · Zonamerica · Montevideo (approximate location)BROU CPD Casa Central · Banco de la República Oriental del Uruguay · Montevideo (approximate location)BROU CPD 19 de Junio · Banco de la República Oriental del Uruguay · Montevideo (approximate location)Solaria data center park phase 1 (Canelones) · Solaria · Canelones (approximate location)Solaria data center park phase 2 (San José) · Solaria · San José de Mayo (approximate location)Antel AI data center (Routes 5 and 48, Canelones) · Antel · Canelones (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Uruguay data center market: key facts

  • Solaria has the largest development pipeline in Uruguay: 500 MW under construction or planned.
  • The largest project in the pipeline is Solaria data center park phase 2 (San José) (300 MW, planned).
  • By type, the tracker lists 4 colocation, 3 hyperscale and 2 enterprise facilities.
  • 2 of 9 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Colocation4
Hyperscale3
Enterprise2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Uruguay data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 21 October 2026. Government sources are linked; the full source list comes with the Excel data.

Uruguay offers a near-fully renewable grid (98% of 2025 generation) with a very low emission factor, tax-free free zones and an investment promotion regime. Google is building a data center in the Parque de las Ciencias free zone in Canelones, and in October 2026 the government signed a 500 MW data center park agreement with Solaria under the free zone regime. Presidencia de la República

Policy and incentives

Free zone users are exempt from all national taxes, existing or future, on authorized activities (Ley 15.921 of 1987, amended by Ley 19.566 of 2017); social security contributions are not exempt. IMPO – Ley 15.921

Outside free zones, projects declared 'promoted' under Ley 16.906 get IRAE (corporate income tax) relief. Decree 329/025, in force from 1 February 2026, caps the exemption at 100% of eligible investment and 90% of yearly IRAE, with up to 100% of eligible investment for projects above UI 180 million. IMPO – Decreto 329/025

The National AI Strategy 2024-2030, approved by the public sector AI and Data committee led by AGESIC, covers governance, capabilities (including infrastructure and data) and sustainable development. AGESIC

Power and grid

State utility UTE sells power under an annual tariff schedule. For 2026 (Decree 339/025, average +4.0%) the optional Large Consumer tariffs apply from 200 kW of contracted valley demand; GC3 at 31.5-63 kV charges 2.400 / 3.944 / 5.261 UYU/kWh in valley, shoulder and peak bands plus demand charges. IMPO – Decreto 339/025

Under Ley 16.832, generators may sign freely negotiated supply contracts directly with large consumers in the wholesale market run by ADME. Decree 12/026 sets the Large Consumer threshold at 1,500 kW of contracted demand and lets large consumers install their own generation under a use/connection agreement. IMPO – Decreto 12/026

Electricity generation in 2025 was 98% renewable, according to the Ministry of Industry, Energy and Mining. MIEM

Land, zoning and sites

Google's data center building is in the Parque de las Ciencias free zone, Ruta 101 km 23.5, Ciudad de la Costa, Canelones, supplied by UTE with diesel backup generators; its environmental assessment file ends in Ministry of Environment Resolution 644-2024. Ministerio de Ambiente – Observatorio Ambiental Nacional

Solaria's planned 500 MW data center park (USD 5.5 billion, plus USD 200 million for 350 MW of solar) will be spread over Canelones, San José and Florida under the free zone regime; phase 1 is 200 MW of data centers. Presidencia de la República

Building or expanding free zones and industrial parks, power plants above 10 MW and transmission lines of 150 kV or more need Prior Environmental Authorization under Decree 349/005. IMPO – Decreto 349/005

Sustainability, water and climate

The grid CO2 emission factor was 11.2 tCO2/GWh (0.0112 kgCO2/kWh) in 2025 as an annual average, with significant month-to-month variation. MIEM

The Ministry of Environment project file for Google's Canelones data center describes an air-based cooling system ('sistema de enfriamiento por aire'). Ministerio de Ambiente – Observatorio Ambiental Nacional

Ley 18.597 (2009) declares efficient energy use of national interest and requires a National Energy Efficiency Plan; it sets no data center specific efficiency rule. IMPO – Ley 18.597

Operators in Uruguay

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Antel3———
Solaria2—500 MW—
Banco de la República Oriental del Uruguay2———
Zonamerica1———
Google1———

Largest data center projects in Uruguay

Under construction and planned facilities with a stated capacity, largest first. — under construction and 500 MW planned in total.

ProjectLocationStatusTypeCapacity
Solaria data center park phase 2 (San José)Solaria San José de Mayo Planned Hyperscale 300 MW
Solaria data center park phase 1 (Canelones)Solaria Canelones Planned Hyperscale 200 MW

How Uruguay compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,31517111,392 MW66,365 MW
Canada7818495 MW9,870 MW
Brazil16456493 MW2,645 MW
Mexico3710179 MW1,306 MW
Chile5019115 MW1,029 MW
Argentina151414.5 MW920 MW
Uruguay95—500 MW
Colombia291814.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru201124.7 MW—
Ecuador1261 MW16 MW
Panama753.5 MW—

Data center deals in Uruguay

Our Deal Tracker lists 1 deals in Uruguay since October 2026, with $5.70B in disclosed value.

  • Solaria Energía y Medio Ambiente → Data center technology campus up to 500 MW (phase 1 Canelones 200 MW, phase 2 San José 300 MW) with 350 MW solar (Florida) Land / campus $5.70B · 500 MW

All Uruguay deals in the Deal Tracker

Facilities

9 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Solaria data center park phase 2 (San José)Solaria
History · 1 deal
  1. Announced
  2. Planned
  • Solaria Energía y Medio Ambiente → Data center technology campus up to 500 MW (phase 1 Canelones 200 MW, phase 2 San José 300 MW) with 350 MW solar (Florida) US$5,700m
  • All deals in the Deal Tracker
San José de Mayo Planned 300 MW — Operator / official
Solaria data center park phase 1 (Canelones)Solaria
History · 1 deal
  1. Announced
  2. Planned
  • Solaria Energía y Medio Ambiente → Data center technology campus up to 500 MW (phase 1 Canelones 200 MW, phase 2 San José 300 MW) with 350 MW solar (Florida) US$5,700m
  • All deals in the Deal Tracker
Canelones Planned 200 MW — Operator / official
Antel AI data center (Routes 5 and 48, Canelones)Antel Canelones Planned — — Operator / official
Antel Data Center Internacional Ing. José Luis MasseraAntel
History
  1. Operational
  2. Operational
  3. Operational
Pando Operational — 2016 Operator / official
Antel Montevideo data centerAntel
History
  1. Planned
  2. Planned
Montevideo Planned — — Operator / official
BROU CPD 19 de JunioBanco de la República Oriental del Uruguay Montevideo Operational — — Operator / official
BROU CPD Casa CentralBanco de la República Oriental del Uruguay Montevideo Operational — — Operator / official
Google Uruguay data center (Parque de las Ciencias)Google
History
  1. Under construction
  2. Under construction
Colonia Nicolich Under construction — — Operator / official
Zonamerica Data CenterZonamerica Montevideo Operational — — Operator / official

Get the data

Every data center in Uruguay, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Uruguay

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Uruguay

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Uruguay?

DC Market Insights tracks 9 data centers in Uruguay as of November 2026: 4 operational, 1 under construction and 4 planned, run by 5 operators. The count grows as we verify more sites.

Which new data centers are being built in Uruguay?

We track — under construction and 500 MW planned. The largest projects are Solaria data center park phase 2 (San José) (300 MW) and Solaria data center park phase 1 (Canelones) (200 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy