Proprietary data

Data Centers in Ecuador

Every data center in Ecuador that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 29 October 2026, DC Market Insights tracks 12 data centers in Ecuador run by 6 operators: 9 operational, 1 under construction and 2 planned. Stated operational capacity is 1 MW, with a further 6 MW under construction and 10 MW planned. Cirion Technologies holds the largest share of tracked operational capacity (100%).

12Facilities tracked
6Operators
1 MWOperational (9 sites)
6 MWUnder construction (1 site)
10 MWPlanned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 12 facilities have a stated capacity; the others are counted as sites only.

QUI2 · Cirion Technologies · Quito (approximate location)Telconet Cloud Center I · Telconet · Guayaquil (approximate location)Telconet Cloud Center II · Telconet · Quito (approximate location)Telconet Cloud Center III · Telconet · Guayaquil (approximate location)Telconet Cloud Center IV · Telconet · Quito (approximate location)Centro de Datos CNT EP – Guayaquil · CNT · Guayaquil (approximate location)Centro de Datos CNT EP – Quito · CNT · Quito (approximate location)Data Xperience Center Quito · Claro · Quito (approximate location)Epicentro · Puntonet · Quito (approximate location)Ciudad Digital · Ufinet · Guayaquil (approximate location)Telconet Quito AI campus · Telconet · Quito (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Ecuador data center market: key facts

  • Capacity under construction or planned (16 MW) is 16.0 times the operational base of 1 MW.
  • The three largest operators by operational capacity, Cirion Technologies, Telconet and CNT, hold 100% of tracked operational MW.
  • Telconet has the largest development pipeline in Ecuador: 10 MW under construction or planned.
  • The largest operational facility we track is QUI2 (Cirion Technologies, Quito) at 1 MW.
  • The largest project in the pipeline is Telconet Quito AI campus (10 MW, planned).
  • Quito is the largest cluster: 7 of 12 facilities and 100% of tracked capacity.
  • By type, the tracker lists 11 colocation and 1 hyperscale facilities.
  • 3 of 12 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational1 MW
Under construction6 MW
Planned10 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Ecuador by tracked capacity, MW

OperationalUnder construction or planned

Facilities by type
Colocation11
Hyperscale1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Ecuador data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 16 October 2026. Government sources are linked; the full source list comes with the Excel data.

Ecuador's grid is mostly hydro and under strain: drought brought rationing in 2024 and again in late 2026. Since Decree 32 (June 2025) high-voltage customers must have their own generation, and CENACE can disconnect them during deficits. A 2024 law lets private developers build plants up to 100 MW with ministry approval, and Decree 515 (Sep 2026) widens self-supply, surplus sales and Autonomous Energy Districts. High-voltage tariffs rose to an average 0.29-0.30 USD/kWh for Oct-Dec 2026. There is no data-centre incentive law yet; MINTEL and CAF are studying data centres and tech free zones. Ministerio de Ambiente y Energía, Boletín 368 (30 Sep 2026)

Policy and incentives

Private-initiative generation projects up to 100 MW (renewable or transition) can be built with ministry authorisation; preferential dispatch and price only up to 10 MW (RO 673, 28 Oct 2024). Registro Oficial 673, Ley Orgánica para Impulsar la Iniciativa Privada en la Generación de Energías

Decree 515 (29 Sep 2026) allows self-supply with surplus injection, Autonomous Energy Districts for industrial zones, storage projects and simplified permits up to 100 MW. Ministerio de Ambiente y Energía, Boletín 368

MINTEL signed a memorandum with CAF (26 Feb 2026) for studies on data centres and technology free zones; no data-centre incentive law yet.

Power and grid

High-voltage customers must have generation for their own demand; CENACE may disconnect them from the SNI during deficits or rationing (Decree 32, RO Supl. 62, 18 Jun 2025). ARCONEL, Reglamento General LOSPEE, Art. 10.1

ARCONEL set average high-voltage prices of 30 cUSD/kWh (AV1) and 29 cUSD/kWh (AV2) for Oct-Dec 2026. ARCONEL, Boletín 028

Total electricity production was 38,212 GWh in 2025 (Estadística del Sector Eléctrico 2025). Ministerio de Ambiente y Energía, Boletín 236 (31 Mar 2026)

CENACE warned of high supply risk on 22 Sep 2026 with Mazar reservoir at a record September low; about 185 high-voltage firms cut consumption one day a week.

Sustainability, water and climate

Grid emission factor for inventories 2024: 0.1616 tCO2-eq/MWh (SNI). Factor de Emisión SNI, Informe 2024

Hydro output fell 10.8% in 2024 because of low water levels; electricity production 34,370 GWh, effective capacity 9,009 MW. Balance Energético Nacional 2024

Data rules

The Organic Law on Personal Data Protection (Registro Oficial Supplement 459, 26 May 2021) governs processing and international transfers of personal data; no general data localisation rule was found. gob.ec, Ley Orgánica de Protección de Datos Personales

Operators in Ecuador

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Telconet5—10 MW—
Claro2———
CNT2———
Cirion Technologies11 MW—100%
Puntonet1—6 MW—
Ufinet1———

Largest data center projects in Ecuador

Under construction and planned facilities with a stated capacity, largest first. 6 MW under construction and 10 MW planned in total.

ProjectLocationStatusTypeCapacity
Telconet Quito AI campusTelconet Quito Planned Hyperscale 10 MW
EpicentroPuntonet Quito Under construction Colocation 6 MW

How Ecuador compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,31517111,392 MW66,365 MW
Canada7818495 MW9,870 MW
Brazil16456493 MW2,645 MW
Mexico3710179 MW1,306 MW
Chile5019115 MW1,029 MW
Argentina151414.5 MW920 MW
Uruguay95—500 MW
Colombia291814.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru201124.7 MW—
Ecuador1261 MW16 MW
Panama753.5 MW—

Facilities

12 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Telconet Quito AI campusTelconet
History
  1. Announced
  2. Planned
  3. Planned
Quito Planned 10 MW — Trade press
EpicentroPuntonet Quito Under construction 6 MW — Trade press
QUI2Cirion Technologies Quito Operational 1 MW total — Operator / official
Centro de Datos CNT EP – GuayaquilCNT Guayaquil Operational — 2016 Trade press
Centro de Datos CNT EP – QuitoCNT Quito Operational — — Trade press
Ciudad DigitalUfinet Guayaquil Operational — — Operator / official
Data Xperience Center DuránClaro Durán Operational — — Trade press
Data Xperience Center QuitoClaro Quito Operational — — Trade press
Telconet Cloud Center ITelconet Guayaquil Operational — — Trade press
Telconet Cloud Center IITelconet Quito Operational — — Trade press
Telconet Cloud Center IIITelconet
History
  1. Operational
  2. Operational
Guayaquil Operational — 2026 Trade press
Telconet Cloud Center IVTelconet Quito Planned — — Trade press

Get the data

Every data center in Ecuador, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Ecuador

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Ecuador

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Ecuador?

DC Market Insights tracks 12 data centers in Ecuador as of October 2026: 9 operational, 1 under construction and 2 planned, run by 6 operators. The count grows as we verify more sites.

What is the data center capacity of Ecuador?

Tracked operational capacity in Ecuador is 1 MW, with 6 MW under construction and 10 MW planned. These totals use the capacity each source states (IT load where given) and cover 3 of 12 tracked facilities.

Which companies operate the most data center capacity in Ecuador?

By tracked operational capacity, the largest operators in Ecuador are Cirion Technologies (1 MW).

Where are the data centers in Ecuador located?

The largest clusters by tracked capacity are Quito (7 facilities) and Guayaquil (5 facilities). The map above shows every site.

Which new data centers are being built in Ecuador?

We track 6 MW under construction and 10 MW planned. The largest projects are Telconet Quito AI campus (10 MW) and Epicentro by Puntonet (6 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy