Proprietary data

Data Centers in Argentina

Every data center in Argentina that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 1 November 2026, DC Market Insights tracks 15 data centers in Argentina run by 14 operators: 10 operational, 0 under construction and 5 planned. Stated operational capacity is 14.5 MW, with a further — under construction and 920 MW planned. Cirion Technologies holds the largest share of tracked operational capacity (48%).

15Facilities tracked
14Operators
14.5 MWOperational (10 sites)
—Under construction (0 sites)
920 MWPlanned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 6 of 15 facilities have a stated capacity; the others are counted as sites only.

BUE · EdgeConneX · Pilar (approximate location)BUE1 · Cirion Technologies · Buenos Aires (approximate location)Telecom Pacheco Data Center · Telecom Argentina · General Pacheco (approximate location)Ringo DCI · IPLAN · Buenos Aires (approximate location)Claro Buenos Aires CABA data center · Claro · Buenos Aires (approximate location)G2K Buenos Aires Tier III data center · G2K · Buenos Aires (approximate location)Claro Olleros data center · Claro · Buenos Aires (approximate location)Centro de Procesamiento de Datos "Rebeca Cherep de Guber" · Government of Buenos Aires Province · La Plata (approximate location)ARBA Centro de Procesamiento de Datos (Gonnet) · ARBA · La Plata (approximate location)Entre Ríos provincial Data Center (Centro de Proceso de Datos) · Government of Entre Ríos · Paraná (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Argentina data center market: key facts

  • Capacity under construction or planned (920 MW) is 63.4 times the operational base of 14.5 MW.
  • The three largest operators by operational capacity, Cirion Technologies, IPLAN and EdgeConneX, hold 100% of tracked operational MW.
  • Pampa Energía has the largest development pipeline in Argentina: 500 MW under construction or planned.
  • The largest operational facility we track is BUE1 (Cirion Technologies, Buenos Aires) at 7 MW.
  • The largest project in the pipeline is Loma de la Lata data center by Pampa Energía (500 MW, planned).
  • Patagonia is the largest cluster: 4 of 15 facilities and 98% of tracked capacity.
  • By type, the tracker lists 6 colocation, 4 hyperscale and 4 enterprise facilities.
  • 6 of 15 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational14.5 MW
Planned920 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Argentina by tracked capacity, MW
FlexDomes120 MW
IPLAN4 MW

OperationalUnder construction or planned

Capacity by market in Argentina, MW
Patagonia920 MW
Buenos Aires14.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation6
Hyperscale4
Enterprise4
Edge1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Argentina data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 14 October 2026. Government sources are linked; the full source list comes with the Excel data.

Argentina has no data-center-specific law. Large data center projects can apply to the Large Investment Incentive Regime (RIGI, Law 27.742), which needs at least USD 200 million and gives a 25% income tax rate, duty-free capital goods and 30 years of stability; the deadline to apply runs to 8 July 2027. A 'Súper RIGI' bill naming AI data centers (USD 1,000 million minimum, 15% income tax) passed the Chamber of Deputies in June 2026 and is pending in the Senate. Loads of 300 kW or more can buy power directly in the wholesale market, reformed from November 2025, and must source 20% renewable energy under Law 27.191. Cancillería Argentina (DNPRI), síntesis del RIGI

Policy and incentives

RIGI (Law 27.742, 8 Jul 2024) covers technology, infrastructure and energy projects of at least USD 200 million, with income tax cut from 35% to 25%, import and export duty relief and 30 years of stability. Cancillería Argentina, síntesis del RIGI

Decree 105/2026 (19 Feb 2026) extended the RIGI application deadline to 8 July 2027 and added a USD 250 million path for new technology products.

The 'Súper RIGI' bill for new industries including AI data centers (USD 1,000 million minimum, 15% income tax, 30 years) passed Deputies on 24 Jun 2026 and is under Senate committee review as file CD-6/26. Senado de la Nación

Power and grid

Secretariat of Energy Resolution 400/2025 normalises the wholesale electricity market from 1 Nov 2025; large customers of distributors (300 kW or more) can join the MEM as agents without restriction. Resolución 400/2025 SE

Law 27.191 obliges users of 300 kW or more to cover 20% of their own consumption with renewables by end 2025, via own contracts or the MATER term market. Ley 27.191

Renewables (excluding large hydro) produced 26,659 GWh in 2025, 19.6% of 142,789 GWh total generation, per CAMMESA data.

Sustainability, water and climate

The national inventory factor for electricity use is 0.283 kg CO2e/kWh (2022). Subsecretaría de Ambiente, Factores de Emisión SNIGEIAR 2025

Data rules

Law 25.326 art. 12 bars personal data transfers to countries without adequate protection; the AAIP keeps an adequacy list and approved model clauses (Resolution 198/2023). The EU renewed Argentina's adequacy status in January 2024. AAIP, Transferencias internacionales

Operators in Argentina

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Claro2———
Cirion Technologies17 MW—48%
IPLAN14 MW—28%
EdgeConneX13.5 MW—24%
ARSAT1———
Sur Energy1———
Government of Entre Ríos1———
G2K1———
ARBA1———
Telecom Argentina1———
Pampa Energía1—500 MW—
Green Capital1—300 MW—
Government of Buenos Aires Province1———
FlexDomes1—120 MW—

Largest data center projects in Argentina

Under construction and planned facilities with a stated capacity, largest first. — under construction and 920 MW planned in total.

ProjectLocationStatusTypeCapacity
Loma de la Lata data centerPampa Energía Planned Hyperscale 500 MW
Green Capital Chubut data centerGreen Capital Planned Hyperscale 300 MW
FlexDomes Neuquén data centerFlexDomes Planned Hyperscale 120 MW

How Argentina compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,31517111,392 MW66,365 MW
Canada7818495 MW9,870 MW
Brazil16456493 MW2,645 MW
Mexico3710179 MW1,306 MW
Chile5019115 MW1,029 MW
Argentina151414.5 MW920 MW
Uruguay95—500 MW
Colombia291814.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru201124.7 MW—
Ecuador1261 MW16 MW
Panama753.5 MW—

Facilities

15 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Loma de la Lata data centerPampa Energía Planned 500 MW total — Trade press
Green Capital Chubut data centerGreen Capital Planned 300 MW total — Trade press
FlexDomes Neuquén data centerFlexDomes Planned 120 MW IT — Trade press
BUE1Cirion Technologies
History
  1. Operational
  2. Operational
Buenos Aires Operational 7 MW — Operator / official
Ringo DCIIPLAN Buenos Aires Operational 4 MW total 2012 Trade press
BUEEdgeConneX Pilar Operational 3.5 MW IT — Operator / official
ARBA Centro de Procesamiento de Datos (Gonnet)ARBA La Plata Operational — — Operator / official
ARSAT Centro Nacional de DatosARSAT Benavídez Operational — — Trade press
Centro de Procesamiento de Datos "Rebeca Cherep de Guber"Government of Buenos Aires Province
History
  1. Operational
  2. Operational
La Plata Operational — 2024 Operator / official
Claro Buenos Aires CABA data centerClaro Buenos Aires Operational — — Trade press
Claro Olleros data centerClaro Buenos Aires Operational — — Trade press
Entre Ríos provincial Data Center (Centro de Proceso de Datos)Government of Entre Ríos Paraná Operational — — Operator / official
G2K Buenos Aires Tier III data centerG2K Buenos Aires Planned — — Trade press
Stargate ArgentinaSur Energy
History
  1. Announced
  2. Planned
Planned — — Trade press
Telecom Pacheco Data CenterTelecom Argentina General Pacheco Operational — — Trade press

Get the data

Every data center in Argentina, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Argentina

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Argentina

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Argentina?

DC Market Insights tracks 15 data centers in Argentina as of November 2026: 10 operational, 0 under construction and 5 planned, run by 14 operators. The count grows as we verify more sites.

What is the data center capacity of Argentina?

Tracked operational capacity in Argentina is 14.5 MW, with — under construction and 920 MW planned. These totals use the capacity each source states (IT load where given) and cover 6 of 15 tracked facilities.

Which companies operate the most data center capacity in Argentina?

By tracked operational capacity, the largest operators in Argentina are Cirion Technologies (7 MW), IPLAN (4 MW) and EdgeConneX (3.5 MW).

Where are the data centers in Argentina located?

The largest clusters by tracked capacity are Patagonia (4 facilities), Buenos Aires (10 facilities) and Paraná (1 facilities). The map above shows every site.

Which new data centers are being built in Argentina?

We track — under construction and 920 MW planned. The largest projects are Loma de la Lata data center by Pampa Energía (500 MW), Green Capital Chubut data center (300 MW) and FlexDomes Neuquén data center (120 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy