Canada Data Center Capacity

Installed data center capacity in Canada (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 November 2026

How much data center capacity Canada has installed, how it compares with the rest of North America, and what our trackers show about its sites, operators, deals and rules.

1.8 GWInstalled, end 2025IT load, DC Market Insights estimate
4%Share of North America2025
#6Rank among 33 countriesInstalled capacity, 2025
100Sites in our tracker38 with a stated MW

Canada data center capacity at a glance

Canada had about 1.8 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 4% of the capacity in North America and puts Canada at number 6 of the 33 countries in our global model. Our Data Center Tracker holds 100 sites in Canada run by 22 operators: 85 operational, 8 under construction and 7 planned. Our trackers also hold 10 verified deals and 9 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Canada

508 MWStated at operational sites (85)
1,367 MWUnder construction (8 sites)
8,510 MWPlanned (7 sites)
22Operators

Largest tracked sites

SiteOperatorCityStatusMW
Wonder Valley AI data centre industrial parkO'Leary VenturesMunicipal District of GreenviewPlanned7,500
Meta Sturgeon County Data CenterMetaSturgeon CountyUnder construction1,000
Beacon AI Centers Heartland data centreBeacon AI CentersSturgeon CountyPlanned920
Bell AI Fabric Saskatchewan (Sherwood) campusBell CanadaSherwood (RM)Under construction300
eStruxture CAL-3eStruxtureRocky View CountyPlanned90
Vantage Quebec City (QC2) campusVantage Data CentersQuebec CityOperational86 IT
QScale Q01 Campus Building BQScaleLévisUnder construction60 IT
STACK TOR01 Toronto (Scarborough)STACK InfrastructureTorontoOperational56 IT
Cologix MTL10CologixLongueuilOperational35
Compass Toronto campus (Etobicoke)Compass DatacentersTorontoOperational30 IT

Every Canada site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Toronto1910113
Montreal16497
Vancouver11411
Markham5429
Calgary5315
Mississauga4319
Kamloops437
Lévis32n/a

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
O'Leary Ventures1n/a7,500
Meta1n/a1,000
Beacon AI Centers1n/a920
Bell Canada47307
eStruxture1614890
Vantage Data Centers4127n/a
Cologix2386n/a
QScale2n/a60

Operators ranked by MW stated at their tracked sites in Canada.

Rules in force

  • MoratoriumOakville Interim Control By-law 2026-129 on data centres and similar high-intensity digital processing facilities
  • RestrictionRocky View County Bylaw C-8766-2026: Data Centre Campus made a discretionary use in the S-DAT District
  • MoratoriumRocky View County temporary moratorium on Special, Data Centre District (S-DAT) redesignation applications
  • RegulationAESO connection requirements for transmission-connected data centres (TCDC Guide)
  • GridData Centre Regulation (Alberta Regulation 117/2026) under the Electric Utilities Act

From government sources. Power and policy in Canada

Recent deals

  • Nov 2026 · M&ABitRock Ltd. (Calgary AI data center developer, ~44% stake), 10 MW, USD 22 m
  • Nov 2026 · JV / partnershipBlueFlare Energy Solutions Brooks Corridor Campus Program (up to 100 MW powered land and colocation campuses), first site Brooks Campus No. 1, 100 MW
  • Oct 2026 · Land / campusSite for 2 MW modular AI data center (about 1.77 MW IT), Ontario, 2 MW
  • Oct 2026 · Land / campusEverWind Point Tupper data centre campus, Nova Scotia (95 MW initial, 420 MW full), 420 MW
  • Sep 2026 · Land / campusBell AI data centre project, Regina area, Saskatchewan (expanded to pathway to 1.2 GW), 1,200 MW
  • Jul 2026 · Power deal250 MW capacity and energy for Meta data centre, Sturgeon County, Alberta, 250 MW

Deal Tracker

Other countries in North America

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Canada in the full data pack

By year to 2035

Installed MW for Canada from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Canada have?

We estimate about 1.8 GW of installed data center capacity (IT load) in Canada at the end of 2025, about 4% of North America and number 6 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Canada?

Our Data Center Tracker lists 100 sites in Canada (85 operational, 8 under construction, 7 planned), run by 22 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Canada?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are O'Leary Ventures, Meta, Beacon AI Centers. Site capacity is counted only where a source states it.

What rules apply to data centers in Canada?

Our Power and Policy Tracker lists 9 government measures in force for Canada, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Canada data center capacity grow to 2035?

The full data pack gives installed capacity for Canada by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.