50.4 GWInstalled, end 2025IT load, DC Market Insights estimate
97%Share of North America2025
#1Rank among 33 countriesInstalled capacity, 2025
1,343Sites in our tracker495 with a stated MW

United States data center capacity at a glance

United States had about 50.4 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 97% of the capacity in North America and puts United States at number 1 of the 33 countries in our global model. Our Data Center Tracker holds 1,343 sites in United States run by 173 operators: 867 operational, 139 under construction and 337 planned. Our trackers also hold 188 verified deals and 12 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for United States

11,428 MWStated at operational sites (867)
20,715 MWUnder construction (139 sites)
46,450 MWPlanned (337 sites)
173Operators

Largest tracked sites

SiteOperatorCityStatusMW
Richland Parish Data Center (Hyperion)MetaHolly RidgeUnder construction5,000 IT
Tract Caldwell Valley Technology ParkTractPlanned4,000
Project CameliaOpenAIPlanned3,200
Tract Virginia Highlands Technology ParkTractPlanned2,500
Tract Hanover Technology ParkTractPlanned2,400
Aligned Project Phoenix (Shippingport)Aligned Data CentersShippingportUnder construction2,000
Microsoft Pecos campusMicrosoftPecosPlanned2,000
Joliet Technology CenterPowerHouse Data CentersJolietPlanned1,800
PowerHouse Grand PrairiePowerHouse Data CentersGrand PrairiePlanned1,800
Tract Buckeye Technology ParkTractBuckeyePlanned1,800

Every United States site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Ashburn5613332
Santa Clara4717382
Dallas231047
Elk Grove Village2111225
Sterling209664
Manassas199422
Hillsboro187448
Atlanta1711391

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
Tract19n/a17,275
PowerHouse Data Centers17608,807
Meta311,0007,000
Vantage Data Centers221943,804
Beale Infrastructure6n/a3,650
OpenAI1n/a3,200
Aligned Data Centers291542,648
STACK Infrastructure204801,848

Operators ranked by MW stated at their tracked sites in United States.

Power context

Rules in force

  • RegulationERCOT Data Center State and Community Impacts Request for Information (Governor-directed data center audit)
  • GridFERC show cause orders to six RTOs/ISOs on large load integration (Dockets EL26-67 to EL26-72)
  • PlanGeorgia PSC certification of 9,985 MW of new Georgia Power generation (large-load certification)
  • GridFERC order directing PJM to create rules for co-located large loads (Docket EL25-49-000)
  • PlanAmerica's AI Action Plan

From government sources. Power and policy in United States

Recent deals

  • Nov 2026 · FinancingApplied Digital Corporation (AI data center developer), USD 500 m
  • Nov 2026 · M&AThree Cogent data center facilities: Omaha NE, Tacoma WA, Cheyenne WY, USD 35 m
  • Nov 2026 · FinancingApplied Digital, Delta Forge 1 AI Factory campus, Louisiana, USD 300 m
  • Nov 2026 · Land / campusApplied Digital, new 150 MW critical IT lease (campus not named), 150 MW, USD 5.4 bn
  • Nov 2026 · JV / partnershipOD1 JV Holdings LLC: STN AI data center campus, Odessa, Texas (65 MW first phase, up to 350 MW planned), 350 MW, USD 780 m
  • Nov 2026 · Power dealGreasewood solar project (operating), 43.5 MW, Texas, 44 MW

Deal Tracker

Other countries in North America

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

United States in the full data pack

By year to 2035

Installed MW for United States from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does United States have?

We estimate about 50.4 GW of installed data center capacity (IT load) in United States at the end of 2025, about 97% of North America and number 1 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in United States?

Our Data Center Tracker lists 1,343 sites in United States (867 operational, 139 under construction, 337 planned), run by 173 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in United States?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Tract, PowerHouse Data Centers, Meta. Site capacity is counted only where a source states it.

What rules apply to data centers in United States?

Our Power and Policy Tracker lists 12 government measures in force for United States, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will United States data center capacity grow to 2035?