Country Reports · Forecast 2026-2035

Singapore Data Center Storage Market Size, Share & Forecast to 2035

Market at a glance

The Singapore Data Center Storage market was worth USD 445.1 million in 2025 and is forecast to reach USD 834.5 million by 2035, growing at a 6.49% CAGR.

$445.1MMarket size, 2025
$834.5MForecast, 2035
6.49%CAGR, 2025-2035
$321.5MMarket size, 2020
Market size, USD million
321.5 2020 445.1 2025 834.5 2035F

Key findings

Driver

DC-CFA2 puts 200 MW of new halls on Jurong Island

Trend

Power caps favour flash over disk

Challenge

Capacity grows only as fast as the government allocates power

Opportunity

Jurong Island halls need first-fit storage from 2027

What is inside the report

  1. 01Introduction
  2. 02Market Snapshot
  3. 03Executive Summary
  4. 04Market Scope
  5. 05Why Estimates Differ
  6. 06Market Drivers
  7. 07Market Trends
  8. 08Market Challenges
  9. 09Market Opportunities
  10. 10Pricing
  • 22chapters
  • 2020-2024Historical period
  • 2026-2035Forecast period
  • —Companies profiled

Full table of contents

Segmentation

Storage Type
All-Flash ArraysHybrid Flash ArraysHDD-Based SystemsTape and Archive Libraries
Architecture
Storage Area Network (SAN)Network-Attached and Scale-Out FileObject StorageDirect-Attached and Hyperconverged
Component
HardwareStorage SoftwareSupport and Managed Services
End User
Hyperscale and Cloud ProvidersColocation and Telecom OperatorsBanks and Financial InstitutionsGovernment and Public SectorOther Enterprises

Recent developments

November 2026

Equinix opened SG6 in Singapore with 8 MW in its first phase (Source: Equinix).

September 2026

Micron reported a roughly 30% rise in NAND prices and said it expects tighter supply in 2027 and 2028 (Source: Micron Technology).

September 2026

the Digital Infrastructure Bill was read the first time in Parliament (Source: MDDI).

August 2026

EDB and IMDA allocated 200 MW of DC-CFA2 capacity on Jurong Island to four operators (Source: EDB).

January 2026

Micron broke ground on a NAND wafer fab in Singapore with a planned investment of about US$24 billion over 10 years, according to the Micron groundbreaking release (Source: Micron Technology).

December 2025

EDB launched DC-CFA2 with at least 200 MW on offer (Source: EDB).

Full analysis

The Singapore Data Center Storage Market is valued at USD 516.97 million in 2026 and is projected to reach USD 834.49 million by 2035, up from USD 445.06 million in 2025, a CAGR of 6.49% from 2025 to 2035 (DC Market Insights estimate). Singapore rations data center power rather than letting the market build freely: the island has about 1.4 gigawatts (GW) of capacity, and the second call for data centre applications (DC-CFA2, where CFA2 means Call for Application 2) handed out only 200 megawatts (MW) in August 2026, 50 MW each to four operators on Jurong Island (Source: Economic Development Board). Storage spend therefore grows with the data packed into each allocated megawatt, not with floor space, and the 2026 bill jumps 16.16% because NAND flash (the non-volatile memory chips inside solid-state storage) prices rose about 30% in a single quarter (Source: Micron Technology, September 2026). The 2025 build receipt is 1,080.7 MW of average installed IT load × USD 0.395 million of storage per MW-year = USD 426.86 million, plus 16.5 MW of new AI capacity × USD 1.103 million = USD 18.20 million. Object storage is the fastest architecture at 13.14% a year, and the West Region is the fastest region at 11.69% a year because Tuas and the Jurong Island park take almost all new halls.

How Much Will Singapore Data Centers Spend on Storage in 2026?

Singapore data centers will spend USD 516.97 million on storage arrays, storage software and storage support in 2026, 16.16% more than the USD 445.06 million of 2025, DC Market Insights estimates.

  • Market size 2025: USD 445.06 million
  • Market size 2026: USD 516.97 million
  • Market size 2030: USD 670.77 million
  • Market size 2035: USD 834.49 million
  • CAGR 2025-2035: 6.49% (low case 4.65%, high case 8.17%)
  • Largest storage type: All-Flash Arrays, 52% of 2025 value
  • Fastest architecture: Object Storage, 13.14% CAGR
  • Leading region: East Region, 38% of 2025 value; fastest region: West Region, 11.69% CAGR
  • Largest location: Tuas, USD 64.09 million in 2025
  • Market leaders: Dell Technologies, NetApp and Hewlett Packard Enterprise (HPE), about 46% of external array spend together (DC Market Insights estimate)

Key Takeaways: Four Singapore Storage Numbers That Follow the Power Allocation

  • All-flash arrays rise from 52% to 68% of storage value by 2035 because every allocated megawatt has to hold more data, and flash stores more per watt than spinning disk.
  • The 2026 storage bill grows 16.16%, twice the long-run rate, because flash prices rose about 30% in the quarter to August 2026 and memory makers expect tighter supply in 2027 and 2028.
  • The West Region climbs from 36% to 58% of value because the 200 MW of DC-CFA2 capacity and the 700 MW of Jurong Island headroom sit there.
  • Banks and Financial Institutions grow only 4.37% a year because their replicated storage already exists and refresh, not new halls, sets their spend.

Executive Summary: Singapore Data Center Storage Market Size, 2020-2035

The Singapore Data Center Storage Market size was valued at USD 321.49 million in 2020, reached USD 445.06 million in 2025, and is anticipated to reach USD 834.49 million by 2035, at a CAGR of 6.49% during the forecast period. Growth from 2020 to 2025 ran at 6.72% a year: installed IT load rose only from about 917 MW to 1,103 MW under the 2019-2022 moratorium and the first allocation call, while storage spend per megawatt rose from USD 0.355 million to USD 0.395 million as enterprises moved data out of offices into colocation halls.

Attribute Detail
Historical period 2020-2024
Base year 2025
Forecast period 2026-2035
Market size 2025 USD 445.06 million
Market size 2026 USD 516.97 million
CAGR 2025-2035 6.49%
Market size 2035 USD 834.49 million

DC Market Insights values installed-base storage refresh and expansion at USD 426.86 million in 2025 and storage for new AI capacity at USD 18.20 million; by 2035 the two lines reach USD 769.08 million and USD 65.42 million. The AI line peaks at USD 77.75 million in 2030, when Jurong Island halls come online at the fastest pace, and then eases as new allocations slow.

What Counts as Data Center Storage in Singapore Halls?

The Singapore Data Center Storage Market covers USD 445.06 million of storage equipment, software and support bought in 2025 for data center halls located in Singapore and run by cloud providers, colocation and telecom operators, banks, government agencies and other enterprises.

Included: all-flash and hybrid flash arrays, hard disk drive (HDD) based systems, tape and archive libraries, Storage Area Network (SAN) and Network-Attached Storage (NAS) systems, scale-out file and object platforms, hyperconverged storage nodes, storage software for replication, snapshots and data protection, and storage support and managed storage contracts.

Excluded: servers and graphics processing units (GPUs), network switches, power and cooling (see the Singapore Data Center Thermal Management Market), public cloud storage subscriptions, and the flash wafers, hard drives and high-bandwidth memory made in Singapore factories and shipped abroad, which are component exports rather than storage installed in Singapore halls.

How the segments fit together: each of the four segment dimensions and the five planning regions adds up to the same total in every year. The Singapore Data Center Market covers the halls and all IT inside them; the storage market counts only the storage layer, so the two reports do not double count each other’s headline, and the boundary between them is the array, its software and its support contract.

Why Do Singapore Data Center Storage Market Estimates Differ?

Published figures for Singapore data center storage range from under USD 0.5 billion to more than USD 1 billion for 2025 because they draw the boundary in different places; DC Market Insights puts 2026 at USD 516.97 million.

Broader definitions add Singapore’s semiconductor output, enterprise storage kept outside data center halls, and cloud storage subscription revenue earned from customers across Southeast Asia. Singapore is a manufacturing base for hard drives and flash, so a definition that counts factory output instead of installed systems inflates the number many times over. The earlier DC Market Insights edition used a wider basis and came out at USD 1.16 billion for 2025, about 2.6 times this edition; the new figure of USD 445.06 million counts only systems installed in Singapore halls and ties each dollar to a megawatt of IT load. Small and mid-sized enterprises (SMEs) that rent cages in colocation halls and buy their own arrays are in scope, and so are traditional storage, all-flash storage, hybrid storage, Hard Disk Drive (HDD), Solid-State Drive (SSD) and tape media when sold as part of a storage system.

Element In this report Why
Storage arrays, file and object systems Yes (USD 284.84 million hardware in 2025) Core purchase
Storage software and support Yes (USD 160.22 million in 2025) Bought with the arrays
Hard drive, flash and memory factory output No Component exports, not installed systems
Cloud storage subscriptions No Service revenue, not equipment
Servers, network, power, cooling No Covered by sibling reports

Market Drivers: What Pushes Singapore Data Center Storage Spending Up?

Three dated events add USD 71.91 million of storage spend between 2025 and 2026, DC Market Insights estimates: the DC-CFA2 allocation, the Digital Infrastructure Bill’s resilience duties and the 2026 flash price spike.

DC-CFA2 puts 200 MW of new halls on Jurong Island

The Economic Development Board (EDB) and the Infocomm Media Development Authority (IMDA) provisionally allocated 200 MW to Digital Realty, Equinix, Keppel Data Centres and ST Telemedia Global Data Centres (STT GDC, where GDC means Global Data Centres), 50 MW each, on 21 August 2026, according to the EDB announcement of the DC-CFA2 results. Each site must reach a Power Usage Effectiveness (PUE) of 1.25 at full IT load and run on at least 50% green energy (Source: EDB, 1 December 2025). DC Market Insights estimates that the 200 MW carries about USD 127 million of first-fit storage when the halls fill from 2027 to 2030 and about USD 80 million a year of storage spend once they are full.

The Digital Infrastructure Bill makes replicated storage a licence condition

The Digital Infrastructure Bill, read the first time on 8 September 2026, licenses every data center with a critical IT load of at least 3 MW for energy efficiency and requires co-location and cloud data centers of at least 10 MW, and cloud providers earning at least S$100 million a year in Singapore, to keep business continuity and disaster recovery plans and report incidents, according to the Ministry of Digital Development and Information (MDDI) release. Disaster recovery means a second copy of the data in another hall; DC Market Insights estimates the replication software and secondary arrays add about USD 9 million to 2026 storage software and support spend.

A 30% quarterly jump in flash prices lifts the 2026 bill

Micron Technology said that NAND prices rose about 30% in its fourth fiscal quarter of 2026 and that it expects supply to be much tighter in calendar 2027 and 2028 than in 2026, according to Micron’s fourth-quarter fiscal 2026 prepared remarks. Sandisk said about two-thirds of its quarter-on-quarter revenue growth in the same period came from higher prices (Source: Sandisk, August 2026). DC Market Insights lifts the storage rate per megawatt by 8% in 2026 and 6% in 2027, which adds about USD 38 million to the 2026 market compared with flat prices.

All-flash arrays rise from 52% to 68% of Singapore data center storage value by 2035 and object storage from 12% to 22%, DC Market Insights estimates, because each scarce megawatt has to hold more data at lower power.

Power caps favour flash over disk

Every new hall must meet PUE 1.25, and Singapore issued an IT energy-efficiency standard for data center equipment in August 2025 (Source: IMDA). Flash holds more terabytes per watt than hybrid arrays, so All-Flash Arrays grow 9.38% a year from USD 231.43 million in 2025 to USD 567.45 million in 2035, while Hybrid Flash Arrays shrink 0.64% a year. HPE said it had shipped over 7,400 Alletra MP arrays by December 2025, more than double a year earlier (Source: Hewlett Packard Enterprise).

AI-ready halls bring object tiers with them

Equinix opened SG6 (Singapore 6), its sixth Singapore data center, on 6 November 2026 with about US$290 million of initial investment and 8 MW in the first phase, rising to 20 MW, according to the Equinix SG6 announcement. AI training checkpoints and inference logs land on S3-compatible object stores, so Object Storage grows 13.14% a year from USD 53.41 million in 2025 to USD 183.59 million in 2035.

Market Challenges: What Holds Back Storage Spending in Singapore Data Centers?

Two limits keep the 2035 base case of USD 834.49 million about USD 141.86 million below the high case of USD 976.35 million, DC Market Insights estimates: the national power allocation and flash supply.

Capacity grows only as fast as the government allocates power

The Green Data Centre Roadmap of May 2024 promised at least 300 MW of additional capacity “in the next few years” on top of about 1.4 GW (Source: EDB), and the government will review the need for another allocation call 18 to 24 months after August 2026 (Source: EDB DC-CFA2 fact sheet). The Energy Market Authority (EMA) projects system peak demand growing 2.4% to 4.8% a year to 10.2 to 12.5 GW by 2034 (Source: EMA, November 2025). Installed IT load in the model rises from 1,103 MW in 2025 to 2,043 MW in 2035; a two-year delay to the next call would move about USD 60 million of storage spend out of 2028-2030.

Tight flash supply can delay array deliveries

HPE said in December 2025 that it was monitoring DRAM and NAND markets daily to protect storage margins (Source: Hewlett Packard Enterprise), and Micron expects tighter supply through 2028. If allocation limits array shipments in 2027, the price lift in the model turns into a volume shortfall; the low case of USD 700.97 million by 2035 (4.65% a year) reflects slower filling of allocated halls and harder price competition after 2028.

Market Opportunities: Where Can Storage Suppliers Win Singapore Deals?

Jurong Island and Tuas storage reach USD 338.80 million a year by 2035 and replication-led storage software USD 200.28 million, DC Market Insights estimates, so suppliers can win new-hall fit-outs and regulated disaster-recovery copies.

Jurong Island halls need first-fit storage from 2027

The minister for digital development said in March 2026 that Singapore has created headroom for up to 700 MW on Jurong Island (Source: MDDI, 13 March 2026). Jurong Island storage spend rises from USD 3.20 million in 2025 to USD 174.24 million in 2035, 49.14% a year, the fastest of the 12 locations, and Tuas adds a further USD 164.56 million by 2035.

Disaster-recovery copies for banks, government and cloud providers

Government and Public Sector storage grows 6.49% a year to USD 83.45 million by 2035, and Hyperscale and Cloud Providers reach USD 350.49 million, as licensed operators replicate data between halls. Storage Software, which includes replication, grows 7.92% a year from USD 93.46 million to USD 200.28 million.

What Do Singapore Operators Pay for Storage per Megawatt?

Singapore data centers spend about USD 0.395 million on storage per installed megawatt a year in 2025, plus about USD 1.10 million one-off per megawatt of new AI capacity, DC Market Insights estimates.

Year Storage spend per installed MW-year (USD million) Storage per new AI MW (USD million) Installed IT load (MW)
2020 0.355 1.22 917
2025 0.395 1.10 1,103
2030 0.400 1.00 1,540
2035 0.385 0.90 2,043

The Singapore rate sits above the USD 0.36 million that DC Market Insights uses for South Korea because finance and government workloads keep more replicated copies per megawatt. Public price anchors come from supplier filings rather than list prices: NetApp recorded USD 1.2 billion of all-flash array revenue in one quarter (Source: NetApp, May 2026), Dell Technologies recorded USD 4.8 billion of storage revenue in its fourth fiscal quarter of 2026 (Source: Dell Technologies), and Micron’s 30% NAND price rise sets the 2026 uplift.

Which Singapore Rules Shape Data Center Storage Buying?

Five rules decide where Singapore storage is installed and how much of it is replicated, touching an estimated USD 142.42 million of bank and government storage spend in 2025.

  • Digital Infrastructure Bill (No. 20/2026, first reading 8 September 2026): licences for data centers of 3 MW and above; resilience, business continuity and disaster recovery duties for co-location and cloud data centers of 10 MW and above (Source: MDDI).
  • DC-CFA2 conditions (December 2025): PUE 1.25 at 100% IT load and at least 50% green energy for new allocations (Source: EDB).
  • Green Data Centre Roadmap (May 2024): at least 300 MW of new capacity for efficient operators (Source: EDB).
  • IT Energy Efficiency Standard for Data Centres (August 2025): efficiency requirements for IT equipment, including storage (Source: IMDA).
  • SS 726:2026 liquid cooling standard for tropical data centers (August 2026): sets cooling rules that raise rack density and so the data stored per hall (Source: Enterprise Singapore).

Which Array Type Carries the Value in Singapore Data Center Storage?

All-flash arrays lead with USD 231.43 million, 52% of 2025 value, and Object Storage is the fastest architecture at 13.14% a year, DC Market Insights estimates.

By Storage Type

All-Flash Arrays rise from 52% to 68% of value because flash stores more data per watt of allocated power.

Segment 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
All-Flash Arrays 231.43 52% 567.45 9.38%
Hybrid Flash Arrays 89.01 20% 83.45 -0.64%
HDD-Based Systems 89.01 20% 125.17 3.47%
Tape and Archive Libraries 35.60 8% 58.41 5.08%

By Architecture

Storage Area Network (SAN) keeps the largest 2025 share at 40% because bank core systems run on block storage, but it grows only 3.47% a year.

Segment 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Storage Area Network (SAN) 178.02 40% 250.35 3.47%
Network-Attached and Scale-Out File 124.62 28% 258.69 7.58%
Object Storage 53.41 12% 183.59 13.14%
Direct-Attached and Hyperconverged 89.01 20% 141.86 4.77%

By Component

Storage Software grows fastest at 7.92% a year because replication licences follow the Digital Infrastructure Bill’s recovery duties.

Segment 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Hardware 284.84 64% 500.69 5.80%
Storage Software 93.46 21% 200.28 7.92%
Support and Managed Services 66.76 15% 133.52 7.18%

By End User

Hyperscale and Cloud Providers grow 8.76% a year to 42% of value by 2035, while Other Enterprises grow only 1.60% as they move data into cloud regions.

Segment 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Hyperscale and Cloud Providers 151.32 34% 350.49 8.76%
Colocation and Telecom Operators 80.11 18% 166.90 7.62%
Banks and Financial Institutions 97.91 22% 150.21 4.37%
Government and Public Sector 44.51 10% 83.45 6.49%
Other Enterprises 71.21 16% 83.45 1.60%

DC Exclusive: The Singapore Allocation-to-Array Storage Tracker

The Singapore Allocation-to-Array Storage Tracker is a DC Market Insights model built on 9 inputs that converts each announced capacity block into first-fit storage and yearly storage spend: 220 MW of new halls carry about USD 140 million of first-fit storage and about USD 88 million a year once full.

Capacity block Operator New IT MW Ready First-fit storage (USD million, estimate) Yearly storage at full load (USD million, estimate)
SG6 phase 1 Equinix 8 Nov 2026 5.38 3.20
SG6 full build Equinix 12 2027-2028 7.63 4.80
Jurong Island DC-CFA2 site Digital Realty 50 2028-2030 31.80 20.00
Jurong Island DC-CFA2 site Equinix 50 2028-2030 31.80 20.00
Jurong Island DC-CFA2 site Keppel Data Centres 50 2028-2030 31.80 20.00
Jurong Island DC-CFA2 site ST Telemedia Global Data Centres 50 2028-2030 31.80 20.00
Existing three sites (refresh) Digital Realty 84 (installed) Operating – 33.60

The inputs are the MW of each block, a 60% AI share of new halls, USD 1.12 million of storage per AI MW in 2027 and USD 1.06 million in 2028, USD 0.40 million of storage per MW-year at full load, and the ready dates. Digital Realty’s three operating Singapore data centers total about 84 MW (Source: Digital Realty, August 2026), and Digital Realty targets nearly S$7 billion of total investment in Singapore (Source: Digital Realty, April 2026).

Regional Insights: Which Part of Singapore Leads Data Center Storage, and Why Is the West Catching Up?

The East Region leads with USD 169.12 million, 38% of 2025 value, while the West Region grows fastest at 11.69% a year and takes the lead before 2030, DC Market Insights estimates.

Region 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
East 169.12 38% 200.28 1.71%
West 160.22 36% 484.00 11.69%
Central 71.21 16% 83.45 1.60%
North 26.70 6% 41.72 4.56%
North-East 17.80 4% 25.03 3.47%

East

Loyang, Changi and Tampines hold the older colocation and bank halls, so storage here is refresh spend on block arrays. Storage spend rises from USD 169.12 million in 2025 to USD 200.28 million in 2035.

West

Tuas, Jurong and the Jurong Island park take the DC-CFA2 allocation and most of the 700 MW of headroom. Storage spend rises from USD 160.22 million in 2025 to USD 484.00 million in 2035.

Central

Genting Lane, Kallang and one-north host carrier-neutral interconnection sites with small storage footprints. Storage spend rises from USD 71.21 million in 2025 to USD 83.45 million in 2035.

North

Woodlands sites serve enterprise and recovery workloads close to the Johor border. Storage spend rises from USD 26.70 million in 2025 to USD 41.72 million in 2035.

North-East

Serangoon North hosts a few enterprise halls. Storage spend rises from USD 17.80 million in 2025 to USD 25.03 million in 2035.

Which Singapore Locations Buy the Most Data Center Storage?

Tuas is the largest location at USD 64.09 million in 2025, and Jurong Island is the fastest at 49.14% a year, DC Market Insights estimates.

Rank Location Region 2025 (USD million) 2035 (USD million) CAGR 2025-2035
1 Tuas West 64.09 164.56 9.89%
2 Tampines East 57.50 72.10 2.29%
3 Jurong East and Jurong West West 52.86 87.12 5.12%
4 Loyang East 50.73 60.08 1.71%
5 Changi East 43.97 52.08 1.71%
6 Kranji and Lim Chu Kang West 40.05 58.08 3.79%
7 Genting Lane and Kallang Central 32.05 40.05 2.25%
8 one-north and Ayer Rajah Central 28.49 31.71 1.08%
9 Woodlands North 18.70 29.20 4.56%
10 Paya Lebar East 16.90 16.02 -0.53%
11 Serangoon North North-East 9.78 13.76 3.47%
12 Jurong Island West 3.20 174.24 49.14%

Forecast Scenarios: Where Could Singapore Data Center Storage Land in 2035?

The Singapore Data Center Storage Market reaches between USD 700.97 million and USD 976.35 million by 2035, with a base case of USD 834.49 million, DC Market Insights estimates.

Scenario 2035 value CAGR 2025-2035 What has to happen
Low USD 700.97 million 4.65% No allocation call after DC-CFA2 until 2030; flash prices fall faster after 2028
Base USD 834.49 million 6.49% About 2,040 MW installed by 2035; AI share of new halls 66%
High USD 976.35 million 8.17% A third call releases more of the 700 MW Jurong Island headroom by 2029; flash stays tight to 2028

Key Players and Market Share: Which Vendors Supply Singapore Data Center Storage?

Dell Technologies, NetApp and Hewlett Packard Enterprise hold about 46% of external array spend in Singapore together, DC Market Insights estimates on the basis of installed systems in bank, government, colocation and cloud halls.

  • Dell Technologies
  • NetApp
  • Hewlett Packard Enterprise (HPE)
  • Everpure (formerly Pure Storage)
  • IBM
  • Hitachi Vantara
  • Huawei Technologies
  • Lenovo
  • Nutanix
  • Commvault
  • Seagate Technology
  • Western Digital
  • Sandisk
  • Micron Technology
  • Equinix
  • Digital Realty
  • ST Telemedia Global Data Centres

NetApp reported fiscal 2026 revenue of USD 6.93 billion, up 5% (Source: NetApp). Everpure, the new name of Pure Storage, reported fiscal 2026 revenue of USD 3.7 billion, up 16% (Source: Everpure). Seagate Technology, which reports from Singapore, recorded fiscal 2026 revenue of USD 12.2 billion and pointed to durable demand for mass-capacity drives as AI raises data generation (Source: Seagate Technology). On the operator side, Keppel DC REIT reported portfolio occupancy of 95.8% at the end of 2025 (Source: Keppel DC REIT), and a consortium led by KKR with Singtel agreed in February 2026 to buy STT GDC at an enterprise value of about S$13.8 billion (Source: STT GDC).

Recent Developments: What Changed for Singapore Data Center Storage in 2026?

  • In November 2026, Equinix opened SG6 in Singapore with 8 MW in its first phase (Source: Equinix).
  • In September 2026, Micron reported a roughly 30% rise in NAND prices and said it expects tighter supply in 2027 and 2028 (Source: Micron Technology).
  • In September 2026, the Digital Infrastructure Bill was read the first time in Parliament (Source: MDDI).
  • In August 2026, EDB and IMDA allocated 200 MW of DC-CFA2 capacity on Jurong Island to four operators (Source: EDB).
  • In January 2026, Micron broke ground on a NAND wafer fab in Singapore with a planned investment of about US$24 billion over 10 years, according to the Micron groundbreaking release (Source: Micron Technology).
  • In December 2025, EDB launched DC-CFA2 with at least 200 MW on offer (Source: EDB).

Research Methodology: How the Model Counts Singapore Storage Megawatt by Megawatt

The model multiplies 16 years of installed IT load (about 917 MW in 2020, 1,103 MW in 2025 and 2,043 MW in 2035, 1% retired each year, the same capacity path as the Singapore Data Center Thermal Management Market) by a storage rate per MW-year, and adds new AI megawatts (30% of 55 MW in 2025, 66% of 110 MW in 2035) times a storage rate per AI megawatt. The 2025 receipt is USD 426.86 million + USD 18.20 million = USD 445.06 million. Bound checks: (1) consistency — 2025 storage spend is 1.71 times the USD 260.13 million thermal layer that uses the same capacity inputs, against 1.41 times in South Korea, which fits Singapore’s heavier finance and government data; (2) ceiling — 2025 spend equals about 1.6% of the USD 27.2 billion that NetApp, Everpure and Dell storage booked worldwide in their 2026 fiscal years, far below what those three vendors alone could ship into Singapore halls; (3) floor — Digital Realty’s 84 MW alone at the model rate would buy USD 33.18 million of storage a year, about 7% of the market for about 8% of installed load. Segment and regional shares are set for 2025 and 2035, interpolated and normalised to the total each year. The Data Center Storage Market gives the worldwide view and the Singapore AI Data Center Market the AI capacity path. See our research methodology.

Table of contents

  • 22 chapters
  • 11 data tables
  1. 01Introduction
    • 1.1Market Definition and Scope
    • 1.2Research Methodology Overview
  2. 02Market Snapshot
    • 2.1Market Snapshot, 2025, 2026 and 2035
    • 2.2Key Market Statistics
    • 2.3Key Takeaways
  3. 03Executive Summary
    • 3.1Market Size, 2020-2035
    • 3.2Installed-Base and AI Storage Lines
  4. 04Market Scope
    • 4.1Included Storage Systems
    • 4.2Excluded Items
    • 4.3How the Segments Fit Together
  5. 05Why Estimates Differ
    • 5.1Factory Output versus Installed Systems
    • 5.2Scope Comparison Table
  6. 06Market Drivers
    • 6.1DC-CFA2 Puts 200 MW of New Halls on Jurong Island
    • 6.2The Digital Infrastructure Bill Makes Replicated Storage a Licence Condition
    • 6.3A 30% Quarterly Jump in Flash Prices Lifts the 2026 Bill
  7. 07Market Trends
    • 7.1Power Caps Favour Flash over Disk
    • 7.2AI-Ready Halls Bring Object Tiers with Them
  8. 08Market Challenges
    • 8.1Capacity Grows Only as Fast as the Government Allocates Power
    • 8.2Tight Flash Supply Can Delay Array Deliveries
  9. 09Market Opportunities
    • 9.1Jurong Island Halls Need First-Fit Storage from 2027
    • 9.2Disaster-Recovery Copies for Banks, Government and Cloud Providers
  10. 10Pricing
    • 10.1Storage Spend per MW-Year and per AI MW, 2020-2035
    • 10.2Public Price Anchors from Supplier Filings
  11. 11Standards and Regulation
    • 11.1Digital Infrastructure Bill
    • 11.2DC-CFA2 Conditions
    • 11.3Green Data Centre Roadmap
    • 11.4IT Energy Efficiency Standard for Data Centres
    • 11.5SS 726:2026 Liquid Cooling Standard
  12. 12Market Segmentation by Storage Type
    • 12.1All-Flash Arrays
    • 12.2Hybrid Flash Arrays
    • 12.3HDD-Based Systems
    • 12.4Tape and Archive Libraries
  13. 13Market Segmentation by Architecture
    • 13.1Storage Area Network (SAN)
    • 13.2Network-Attached and Scale-Out File
    • 13.3Object Storage
    • 13.4Direct-Attached and Hyperconverged
  14. 14Market Segmentation by Component
    • 14.1Hardware
    • 14.2Storage Software
    • 14.3Support and Managed Services
  15. 15Market Segmentation by End User
    • 15.1Hyperscale and Cloud Providers
    • 15.2Colocation and Telecom Operators
    • 15.3Banks and Financial Institutions
    • 15.4Government and Public Sector
    • 15.5Other Enterprises
  16. 16DC Exclusive: The Singapore Allocation-to-Array Storage Tracker
    • 16.1Equinix SG6
    • 16.2Digital Realty Jurong Island
    • 16.3Equinix Jurong Island
    • 16.4Keppel Data Centres Jurong Island
    • 16.5ST Telemedia Global Data Centres Jurong Island
    • 16.6Digital Realty Existing Sites
  17. 17Regional Insights
    • 17.1East
    • 17.2West
    • 17.3Central
    • 17.4North
    • 17.5North-East
  18. 18Location Analysis
    • 18.1Tuas
    • 18.2Tampines
    • 18.3Jurong East and Jurong West
    • 18.4Loyang
    • 18.5Changi
    • 18.6Kranji and Lim Chu Kang
    • 18.7Genting Lane and Kallang
    • 18.8one-north and Ayer Rajah
    • 18.9Woodlands
    • 18.10Paya Lebar
    • 18.11Serangoon North
    • 18.12Jurong Island
  19. 19Forecast Scenarios
    • 19.1Low Case
    • 19.2Base Case
    • 19.3High Case
  20. 20Competitive Insights
    • 20.1Dell Technologies
    • 20.2NetApp
    • 20.3Hewlett Packard Enterprise (HPE)
    • 20.4Everpure (formerly Pure Storage)
    • 20.5IBM
    • 20.6Hitachi Vantara
    • 20.7Huawei Technologies
    • 20.8Lenovo
    • 20.9Nutanix
    • 20.10Commvault
    • 20.11Seagate Technology
    • 20.12Western Digital
    • 20.13Sandisk
    • 20.14Micron Technology
    • 20.15Equinix
    • 20.16Digital Realty
    • 20.17ST Telemedia Global Data Centres
  21. 21Recent Developments
    • 21.1Equinix SG6 Opening, November 2026
    • 21.2Micron NAND Price Rise, September 2026
    • 21.3Digital Infrastructure Bill, September 2026
    • 21.4DC-CFA2 Allocation, August 2026
    • 21.5Micron Singapore NAND Fab, January 2026
    • 21.6DC-CFA2 Launch, December 2025
  22. 22Research Methodology
    • 22.1Capacity and Storage Rate Model
    • 22.22025 Build Receipt
    • 22.3Three Bound Checks
  1. Table 1Market Attributes, 2025, 2026 and 2035
  2. Table 2Scope Comparison
  3. Table 3Storage Spend per MW-Year and per AI MW, 2020-2035
  4. Table 4Market by Storage Type, 2025 and 2035
  5. Table 5Market by Architecture, 2025 and 2035
  6. Table 6Market by Component, 2025 and 2035
  7. Table 7Market by End User, 2025 and 2035
  8. Table 8Singapore Allocation-to-Array Storage Tracker
  9. Table 9Market by Region, 2025 and 2035
  10. Table 10Top 12 Locations, 2025 and 2035
  11. Table 11Forecast Scenarios, 2035

About this report

Amit JainDeepti Agrawal

Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.

Read our methodology

How we built this

  • Historical period2020-2024
  • Base year2025
  • Forecast period2026-2035
  • Sizing approachTop-down + bottom-up

Need more than the report?

Advisory on this market

Due diligence, site selection and market entry work, by the analysts who wrote this report.

See consulting services

Frequently asked questions

What is the size of the Singapore Data Center Storage Market in 2026?

USD 516.97 million in 2026, up 16.16% from USD 445.06 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 834.49 million by 2035, a CAGR of 6.49% from 2025.

How fast is the Singapore Data Center Storage Market growing?

6.49% a year from 2025 to 2035, DC Market Insights estimates, close to the 6.72% of 2020-2025, because Singapore adds data center power only through government allocation calls such as the 200 MW DC-CFA2.

Why does Singapore data center storage spending jump in 2026?

By 16.16% to USD 516.97 million because NAND flash prices rose about 30% in one quarter of 2026 (Micron) and new AI-ready halls such as Equinix SG6 start buying storage, DC Market Insights estimates.

Which storage type is largest in Singapore data centers?

All-flash arrays, at USD 231.43 million or 52% of 2025 spend, rising to 68% by 2035 because flash stores more data per watt of scarce allocated power.

What is the fastest growing segment of Singapore data center storage?

Object storage, at 13.14% a year from USD 53.41 million in 2025 to USD 183.59 million in 2035, because AI checkpoints and disaster-recovery copies move to S3-compatible tiers.

Which part of Singapore leads data center storage spending?

The East Region, with USD 169.12 million or 38% of 2025 spend; the West Region grows fastest at 11.69% a year because Tuas and the Jurong Island park take the new DC-CFA2 halls.

How will the Digital Infrastructure Bill affect data center storage in Singapore?

It adds about USD 9 million of replication software and secondary arrays in 2026, DC Market Insights estimates, because licensed data centers of 10 MW and above must keep business continuity and disaster recovery plans.

How much do Singapore data centers spend on storage per megawatt?

About USD 0.395 million per installed megawatt a year in 2025, plus about USD 1.10 million one-off per megawatt of new AI capacity, DC Market Insights estimates.

Who are the leading data center storage suppliers in Singapore?

Dell Technologies, NetApp and Hewlett Packard Enterprise hold about 46% of external array spend together (DC Market Insights estimate), followed by Everpure (formerly Pure Storage), IBM, Hitachi Vantara and Huawei.

Why do Singapore Data Center Storage Market estimates differ?

Estimates differ by more than 2 times because broader definitions count Singapore’s drive and flash factory output and cloud subscriptions; DC Market Insights counts only storage installed in Singapore halls, USD 445.06 million in 2025.

Get this report

How do I get the full report?

Request a quote; we reply by email within one business day.

How and when will I receive the report?

By email, within 24-48 business hours of payment.

How can I pay?

Once you accept the quote, we email you a secure payment link.

Can I see a sample first?

Yes. Request a free sample and we will email it to you.

Can the report be tailored to my needs?

Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.

Can I get an invoice or pay against a purchase order?

Write to sales@dcmarketinsights.com and our team will help.

Refund and returns policy

Request a quote

Singapore Data Center Storage Market

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Free sample

Singapore Data Center Storage Market

See the structure, tables and charts before you decide.

Smallform of Sample request

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to send your sample and answer your questions
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Talk to an analyst

Ask the team that built this report

Different scope, country or data cut? A senior analyst replies within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy