Indonesia Data Center Capacity

Installed data center capacity in Indonesia (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity Indonesia has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.

0.7 GWInstalled, end 2025IT load, DC Market Insights estimate
2%Share of Asia Pacific2025
#18Rank among 26 countriesInstalled capacity, 2025

Indonesia data center capacity at a glance

Indonesia had about 0.7 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 2% of the capacity in Asia Pacific and puts Indonesia at number 18 of the 26 countries in our global model. Our trackers also hold 9 verified deals and 6 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

Rules in force

  • PlanPusat Data Nasional (PDN) 1 limited operation
  • PlanPeraturan Menteri Komunikasi dan Digital Nomor 18 Tahun 2025 tentang Organisasi dan Tata Kerja Balai Layanan Pusat Data Nasional
  • RenewablePLN REC service for the data centre industry
  • IncentivePeraturan Pemerintah Nomor 68 Tahun 2021 tentang Kawasan Ekonomi Khusus Nongsa
  • RegulationPeraturan Pemerintah Nomor 71 Tahun 2019 tentang Penyelenggaraan Sistem dan Transaksi Elektronik

From government sources. Power and policy in Indonesia

Recent deals

  • Oct 2026 · M&APDG Indonesia enterprise data center business (5 operational data centers: Greater Jakarta, Bandung, Surabaya, Pekanbaru)
  • Sep 2026 · JV / partnershipPlanned ~500MW wholesale AI and cloud data centre campus, KEK Galang Batang, Bintan (phase 1 ~50MW), 500 MW
  • Aug 2026 · Land / campusSMX01 data center, Jakarta (27MW facility)
  • Aug 2026 · JV / partnershipZankore by Indosat AI factory platform (200MW by 1H 2027, up to 1GW), 1,000 MW, USD 800 m
  • Aug 2026 · Land / campusThree data centers in Indonesia (360MW contracted IT power), 360 MW
  • Jun 2026 · JV / partnership360MW NVIDIA DSX AI Factory campus, Batam, 360 MW

Deal Tracker

Other countries in Asia Pacific

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Indonesia in the full data pack

By year to 2035

Installed MW for Indonesia from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Indonesia have?

We estimate about 0.7 GW of installed data center capacity (IT load) in Indonesia at the end of 2025, about 2% of Asia Pacific and number 18 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

What rules apply to data centers in Indonesia?

Our Power and Policy Tracker lists 6 government measures in force for Indonesia, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Indonesia data center capacity grow to 2035?

The full data pack gives installed capacity for Indonesia by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.