Indonesia Data Center Capacity

Installed data center capacity in Indonesia (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 November 2026

How much data center capacity Indonesia has installed, how it compares with the rest of Asia Pacific, and what our trackers show about its sites, operators, deals and rules.

0.5 GWInstalled, end 2025IT load, DC Market Insights estimate
1%Share of Asia Pacific2025
#22Rank among 33 countriesInstalled capacity, 2025
76Sites in our tracker37 with a stated MW

Indonesia data center capacity at a glance

Indonesia had about 0.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 1% of the capacity in Asia Pacific and puts Indonesia at number 22 of the 33 countries in our global model. Our Data Center Tracker holds 76 sites in Indonesia run by 33 operators: 61 operational, 8 under construction and 7 planned. Our trackers also hold 11 verified deals and 6 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Indonesia

348 MWStated at operational sites (61)
1,084 MWUnder construction (8 sites)
1,878 MWPlanned (7 sites)
33Operators

Largest tracked sites

SiteOperatorCityStatusMW
DCI H5 Data Center ParkDCI IndonesiaBintanPlanned1,000 IT
CGK CampusDigital EdgeBekasiUnder construction500 IT
Kabil Industrial Tech Park (KITP)DayOneBatamPlanned360 IT
CGK5 Suryacipta AI Campus 3BDxKarawangPlanned290 IT
JC4Princeton Digital GroupBekasiUnder construction240
AI Campus 2 (CGK4)BDxPurwakartaUnder construction120 IT
JC3Princeton Digital GroupBekasiUnder construction120
STTGDC JKT7ST Telemedia Global Data CentresCikarangPlanned60 IT
STTGDC JKT8ST Telemedia Global Data CentresCikarangPlanned60 IT
STTGDC JKT9ST Telemedia Global Data CentresCikarangPlanned60 IT

Every Indonesia site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Jakarta2319105
Cikarang11364
Bekasi7571
Cibitung5173
Surabaya5512
Karawang43n/a
South Tangerang3317
Batam32n/a

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
DCI Indonesia101011,000
Digital Edge329500
BDx537410
Princeton Digital Group726360
ST Telemedia Global Data Centres942332
DayOne2n/a360
NTT DATA366n/a
NeutraDC444n/a

Operators ranked by MW stated at their tracked sites in Indonesia.

Rules in force

  • PlanPusat Data Nasional (PDN) 1 limited operation
  • PlanPeraturan Menteri Komunikasi dan Digital Nomor 18 Tahun 2025 tentang Organisasi dan Tata Kerja Balai Layanan Pusat Data Nasional
  • RenewablePLN REC service for the data centre industry
  • IncentivePeraturan Pemerintah Nomor 68 Tahun 2021 tentang Kawasan Ekonomi Khusus Nongsa
  • RegulationPeraturan Pemerintah Nomor 71 Tahun 2019 tentang Penyelenggaraan Sistem dan Transaksi Elektronik

From government sources. Power and policy in Indonesia

Recent deals

  • Oct 2026 · Land / campus16.6 ha land, Cluster 2B, D-Hub Special Economic Zone, BSD City, Tangerang, Banten, USD 186 m
  • Oct 2026 · M&APDG Indonesia enterprise data center business (5 operational data centers: Greater Jakarta, Bandung, Surabaya, Pekanbaru)
  • Sep 2026 · JV / partnershipPlanned ~500MW wholesale AI and cloud data centre campus, KEK Galang Batang, Bintan (phase 1 ~50MW), 500 MW
  • Aug 2026 · Land / campusSMX01 data center, Jakarta (27MW facility)
  • Aug 2026 · JV / partnershipZankore by Indosat AI factory platform (200MW by 1H 2027, up to 1GW), 1,000 MW, USD 800 m
  • Aug 2026 · Land / campusThree data centers in Indonesia (360MW contracted IT power), 360 MW

Deal Tracker

Other countries in Asia Pacific

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Indonesia in the full data pack

By year to 2035

Installed MW for Indonesia from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Indonesia have?

We estimate about 0.5 GW of installed data center capacity (IT load) in Indonesia at the end of 2025, about 1% of Asia Pacific and number 22 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Indonesia?

Our Data Center Tracker lists 76 sites in Indonesia (61 operational, 8 under construction, 7 planned), run by 33 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Indonesia?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are DCI Indonesia, Digital Edge, BDx. Site capacity is counted only where a source states it.

What rules apply to data centers in Indonesia?

Our Power and Policy Tracker lists 6 government measures in force for Indonesia, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will Indonesia data center capacity grow to 2035?

The full data pack gives installed capacity for Indonesia by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.