South Africa Data Center Capacity

Installed data center capacity in South Africa (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 November 2026

How much data center capacity South Africa has installed, how it compares with the rest of Middle East and Africa, and what our trackers show about its sites, operators, deals and rules.

0.4 GWInstalled, end 2025IT load, DC Market Insights estimate
16%Share of Middle East and Africa2025
#25Rank among 33 countriesInstalled capacity, 2025
28Sites in our tracker20 with a stated MW

South Africa data center capacity at a glance

South Africa had about 0.4 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 16% of the capacity in Middle East and Africa and puts South Africa at number 25 of the 33 countries in our global model. Our Data Center Tracker holds 28 sites in South Africa run by 7 operators: 25 operational, 2 under construction and 1 planned. Our trackers also hold 5 verified deals and 13 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for South Africa

202 MWStated at operational sites (25)
60 MWUnder construction (2 sites)
120 MWPlanned (1 sites)
7Operators

Largest tracked sites

SiteOperatorCityStatusMW
Vantage Johannesburg I (JNB1) campusVantage Data CentersJohannesburgPlanned120 IT
Teraco CT2TeracoCape TownOperational50 IT
Teraco JB4TeracoJohannesburgOperational50 IT
Teraco JB7TeracoJohannesburgUnder construction40 IT
Africa Data Centres JHB2 SamrandAfrica Data CentresCenturionOperational35 IT
Vantage Johannesburg II (JNB2)Vantage Data CentersEkurhuleniUnder construction20 IT
Teraco JB2TeracoJohannesburgOperational14 IT
OADC Isando (JNB1)Open Access Data CentresJohannesburgOperational12
OADC Durban (DUR1)Open Access Data CentresDurbanOperational8
OADC Parklands (JNB3)Open Access Data CentresJohannesburgOperational6

Every South Africa site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Johannesburg11485
Cape Town6369
Durban3210
Centurion2235
Midrand22n/a
Bloemfontein111
Gqeberha111
East London111

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
Teraco911940
Vantage Data Centers2n/a140
Open Access Data Centres1142n/a
Africa Data Centres341n/a
MTN1n/an/a
Equinix1n/an/a
Vodacom1n/an/a

Operators ranked by MW stated at their tracked sites in South Africa.

Power context

Rules in force

  • TariffEskom FY2027 tariff increase: 8.76% for direct customers from 1 April 2026
  • TariffCarbon tax raised to R308 per tonne CO2e from 1 January 2026
  • IncentiveSpecial Economic Zones: 15% corporate income tax
  • GridGrid Capacity Allocation Rules: queuing per node, first-ready first-served
  • RegulationNERSA grants Market Operator licence to NTCSA

From government sources. Power and policy in South Africa

Recent deals

  • Oct 2026 · Land / campusVacant industrial land at Erf 25704 Brackenfell, City of Cape Town
  • Jun 2026 · M&AAdditional 16% stake in Teraco (Africa data center platform), lifting ownership to 77%, USD 650 m
  • Mar 2026 · Land / campusLand in Johannesburg and Cape Town for 160 MW of new capacity, 160 MW, USD 52 m
  • Feb 2026 · M&ASeven NTT data centres across South Africa
  • Feb 2026 · M&ACassava Africa Data Centres (ADC)

Deal Tracker

Other countries in Middle East and Africa

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

South Africa in the full data pack

By year to 2035

Installed MW for South Africa from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does South Africa have?

We estimate about 0.4 GW of installed data center capacity (IT load) in South Africa at the end of 2025, about 16% of Middle East and Africa and number 25 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in South Africa?

Our Data Center Tracker lists 28 sites in South Africa (25 operational, 2 under construction, 1 planned), run by 7 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in South Africa?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Teraco, Vantage Data Centers, Open Access Data Centres. Site capacity is counted only where a source states it.

What rules apply to data centers in South Africa?

Our Power and Policy Tracker lists 13 government measures in force for South Africa, such as incentives, tariffs, grid rules and national plans, each linked to the official source.

How will South Africa data center capacity grow to 2035?

The full data pack gives installed capacity for South Africa by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.