Proprietary data

Data Center Power & Policy in South Africa

Every government action on data centers and power in South Africa that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 25 November 2026, DC Market Insights tracks 17 government actions on data centers and power in South Africa, 13 of them in force. South Africa has 1 restriction on new data centers in force: Data and Cloud Policy: government data on national security and sovereignty stays in South Africa. 1 incentive scheme applies: Special Economic Zones: 15% corporate income tax.

17Actions tracked
13In force
—Industrial power price
9%Renewable share of generation

Market snapshot

South Africa power and policy: key facts

  • Renewable share of electricity generation: 9% (2024). Rank 40 of 43 tracked countries, highest first.
  • Latest change: NERSA consultation on a Wholesale Electricity Pricing Methodology (NERSA, 25 May 2026).
  • By type: 5 power tariff, 4 regulation, 3 grid access and 2 plan or strategy.

Power indicators for South Africa

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 9% 2024 · Renewables (wind, solar, hydro) share of local electricity production 2024; coal 83% Stats SA, A breakdown of South Africa's energy mix

In force now in South Africa

Restriction (1)

  • RestrictionIn force

    Data and Cloud Policy: government data on national security and sovereignty stays in South Africa

    Section 15.4.2 of the National Policy on Data and Cloud requires government data that concerns national security and sovereignty to be stored only in digital infrastructure inside South Africa, in unified cloud-enabled government data centres. No general localisation rule for private data.

    Department of Communications and Digital Technologies · Effective 31 May 2024 · Government Gazette 50741, General Notice 2533 of 2024

Grid access (2)

  • Grid accessIn force

    Grid Capacity Allocation Rules: queuing per node, first-ready first-served

    Gazetted national rules (Gazette 53914, Notice 6982) for allocating grid connection capacity: queuing per node when several applications compete, capacity revocable if milestones are missed; cover generation and storage projects.

    NERSA · Government Gazette 53914, Notice 6982 of 2025

  • Grid accessIn force

    NTCSA GCCA 2025: Cape grid capacity fully allocated, curtailment raises hosting to 7,205 MW

    NTCSA's Generation Connection Capacity Assessment 2025 update says available capacity in the Eastern, Western and Northern Cape is fully allocated; congestion curtailment lifts hosting from 5,625 MW to 7,205 MW by 2028, and new bulk loads such as data centres could improve curtailment outcomes.

    7,205 MW Cape hosting capacity by 2028 with curtailment

    National Transmission Company South Africa

Power tariff (4)

  • Power tariffIn force

    Eskom FY2027 tariff increase: 8.76% for direct customers from 1 April 2026

    After NERSA's 5 Mar 2026 decision (generation RAB re-determination), Eskom direct customers pay an average 8.76% more from 1 Apr 2026; municipal bulk purchasers average 9.01% from 1 Jul 2026. NERSA set 8.83% for 2027/28.

    8.76 % average for Eskom direct customers

    NERSA / Eskom · Effective 1 Apr 2026

  • Power tariffIn force

    Carbon tax raised to R308 per tonne CO2e from 1 January 2026

    Carbon tax rate rose from R236 to R308 per tonne of CO2 equivalent from 1 Jan 2026 (Eskom's cost pass-through feeds electricity tariffs).

    308 ZAR/tCO2e

    National Treasury / SARS · Effective 1 Jan 2026 · SARS Budget 2026 FAQ

  • Power tariffIn force

    Eskom tariff restructuring: separate generation capacity charge from 1 April 2025

    NERSA-approved FY2026 tariffs move generation capacity costs out of energy charges into a fixed generation capacity charge (R/kVA/month) and a legacy charge; for FY2027 the charge was raised to 30% of the Retail Tariff Plan value.

    NERSA / Eskom · Effective 1 Apr 2025

  • Power tariffIn force

    NERSA MYPD6 decision on Eskom revenue 2025/26-2027/28

    NERSA approved Eskom price increases of 12.74% for 2025/26, 5.36% for 2026/27 and 6.19% for 2027/28 (31 Jan 2025). The 2026/27 and 2027/28 figures were later raised to 8.76% and 8.83% after the 2026 RAB re-determination (PP-ZA-009).

    12.74 % FY2025/26 average increase

    NERSA · Effective 1 Apr 2025 · SAnews, 31 Jan 2025

Incentive (1)

  • IncentiveIn force

    Special Economic Zones: 15% corporate income tax

    Qualifying companies in approved Special Economic Zones may pay 15% corporate income tax instead of the standard rate, plus a building allowance; Budget 2026 proposes tighter anti-avoidance rules.

    15 % corporate income tax rate in SEZs

    SARS / Department of Trade, Industry and Competition · SARS Budget 2026 FAQ

Regulation (4)

  • RegulationIn force

    NERSA grants Market Operator licence to NTCSA

    NERSA approved the National Transmission Company South Africa's Market Operator licence application; next step is to finalise the Market Code and submit it to NERSA. The wholesale market is not yet trading.

    NERSA / NTCSA · SAnews, 28 Nov 2025

  • RegulationIn force

    Electricity Regulation Amendment Act 38 of 2024: transmission system operator and competitive electricity trading

    Amends the Electricity Regulation Act 2006: sets up the independent Transmission System Operator (NTCSA) and an open market platform for competitive electricity trading, the base for a wholesale market and private supply to large users. In force 1 Jan 2025 (Gazette 51778).

    Parliament of South Africa / Minister of Electricity and Energy · Effective 1 Jan 2025 · Electricity Regulation Amendment Act 38 of 2024 (gov.za)

  • RegulationIn force

    National Policy on Data and Cloud: data centre siting and self-supply of power and water

    Gazetted national data and cloud policy (DCDT). Data centres must not be built in restricted areas such as heritage sites or national key points; priority is given to data centres providing their own electricity and water; government data centres must meet high availability standards.

    Department of Communications and Digital Technologies · Effective 31 May 2024 · Government Gazette 50741, General Notice 2533 of 2024

  • RegulationIn force

    Amended Schedule 2 of the Electricity Regulation Act: embedded generation exempt from licensing up to 100 MW

    Amended Schedule 2 (gazetted 12 Aug 2021) exempts embedded generation projects of 1-100 MW from a NERSA licence (registration only), opening own generation for large users such as data centres. A later removal of any MW cap is not confirmed here.

    100 MW licence exemption threshold set in 2021

    Department of Mineral Resources and Energy · DMRE media statement, 13 Aug 2021

Plan or strategy (1)

  • Plan or strategyIn force

    Integrated Resource Plan 2025 approved by Cabinet

    Cabinet approved the final Integrated Resource Plan 2025 on 15 Oct 2025: about R2.23 trillion of investment in new generation and grid, towards a net-zero electricity sector by 2050. Replaces IRP 2019/2023 drafts.

    Cabinet / Department of Electricity and Energy · Statement on the Cabinet meeting of 15 October 2025

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Power tariffProposed

    NERSA consultation on a Wholesale Electricity Pricing Methodology

    NERSA consultation paper (Gazette 54738, Notice 7512) on a pricing methodology for the coming wholesale market, covering wheeling, ancillary services, balancing markets and the Market Code.

    NERSA · Government Gazette 54738, Notice 7512 of 2026

  • Grid accessAnnounced

    Independent Transmission Projects programme, Phase I

    Government programme for privately financed transmission lines: pre-qualified bidders by 15 Dec 2025, final RFP by Q3 2026, credit guarantee vehicle expected in H2 2026.

    Department of Electricity and Energy / National Treasury · Department of Electricity and Energy media statement

Timeline of data center and power policy in South Africa

DateActionTypeStatusAuthority
25 May 2026NERSA consultation on a Wholesale Electricity Pricing MethodologyPower tariffProposedNERSA
26 Apr 2026Draft National AI Policy (withdrawn April 2026)Plan or strategyWithdrawnDepartment of Communications and Digital Technologies
16 Mar 2026Eskom FY2027 tariff increase: 8.76% for direct customers from 1 April 2026Power tariffIn forceNERSA / Eskom
25 Feb 2026Carbon tax raised to R308 per tonne CO2e from 1 January 2026Power tariffIn forceNational Treasury / SARS
25 Feb 2026Special Economic Zones: 15% corporate income taxIncentiveIn forceSARS / Department of Trade, Industry and Competition
24 Dec 2025Grid Capacity Allocation Rules: queuing per node, first-ready first-servedGrid accessIn forceNERSA
28 Nov 2025NERSA grants Market Operator licence to NTCSARegulationIn forceNERSA / NTCSA
31 Oct 2025Independent Transmission Projects programme, Phase IGrid accessAnnouncedDepartment of Electricity and Energy / National Treasury
31 Oct 2025NTCSA GCCA 2025: Cape grid capacity fully allocated, curtailment raises hosting to 7,205 MWGrid accessIn forceNational Transmission Company South Africa
16 Oct 2025Integrated Resource Plan 2025 approved by CabinetPlan or strategyIn forceCabinet / Department of Electricity and Energy
19 Mar 2025Eskom tariff restructuring: separate generation capacity charge from 1 April 2025Power tariffIn forceNERSA / Eskom
31 Jan 2025NERSA MYPD6 decision on Eskom revenue 2025/26-2027/28Power tariffIn forceNERSA
20 Aug 2024Electricity Regulation Amendment Act 38 of 2024: transmission system operator and competitive electricity tradingRegulationIn forceParliament of South Africa / Minister of Electricity and Energy
31 May 2024Data and Cloud Policy: government data on national security and sovereignty stays in South AfricaRestrictionIn forceDepartment of Communications and Digital Technologies
31 May 2024National Policy on Data and Cloud: data centre siting and self-supply of power and waterRegulationIn forceDepartment of Communications and Digital Technologies
20 Nov 2023Section 12BA enhanced renewable energy deduction (125%)IncentiveExpiredNational Treasury / SARS
12 Aug 2021Amended Schedule 2 of the Electricity Regulation Act: embedded generation exempt from licensing up to 100 MWRegulationIn forceDepartment of Mineral Resources and Energy

How South Africa compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in South Africa?

Yes. 1 restriction on new data centers is in force in South Africa: Data and Cloud Policy: government data on national security and sovereignty stays in South Africa.

What incentives does South Africa offer data centers?

In force: Special Economic Zones: 15% corporate income tax. Each is listed with its authority and dates on this page.

How much of South Africa’s electricity is renewable?

Renewables supplied 9% of electricity generation in South Africa in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity does South Africa have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See South Africa capacity

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.