In short

As of 16 November 2026, DC Market Insights tracks 1 data centers in Greece run by 1 operators: 0 operational, 0 under construction and 1 planned.

1Facilities tracked
1Operators
—Operational (0 sites)
—Under construction (0 sites)
90 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Data4 ATH1 Paiania · Data4 · Paiania (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Greece data center market: key facts

  • Data4 has the largest development pipeline in Greece: 90 MW under construction or planned.
  • The largest project in the pipeline is Data4 ATH1 Paiania (90 MW, planned).

Operators in Greece

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Data41—90 MW—

Largest data center projects in Greece

Under construction and planned facilities with a stated capacity, largest first. — under construction and 90 MW planned in total.

ProjectLocationStatusTypeCapacity
Data4 ATH1 PaianiaData4 Paiania Planned Colocation 90 MW

How Greece compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom197541,025 MW7,778 MW
Germany18556923 MW4,385 MW
France5510322 MW1,413 MW
Sweden4117172 MW1,498 MW
Finland3616230 MW1,430 MW
Ireland391553 MW1,278 MW
Denmark301454.6 MW844 MW
Italy107170 MW693 MW
Russia10820371 MW357 MW
Netherlands10732217 MW414 MW
Norway22—350 MW
Spain211279.4 MW175 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Data4 ATH1 PaianiaData4
History
  1. Announced
  2. Planned
Paiania Planned 90 MW total — Operator / official

Get the data

Every data center in Greece, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,284 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Greece

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Greece

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Greece?

DC Market Insights tracks 1 data centers in Greece as of November 2026: 0 operational, 0 under construction and 1 planned, run by 1 operators. The count grows as we verify more sites.

Which new data centers are being built in Greece?

We track — under construction and 90 MW planned. The largest projects are Data4 ATH1 Paiania (90 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy