Greece Data Center Market Size, Share & Forecast to 2035
Market at a glance
The Greece Data Center market was worth USD 286.4 million in 2025 and is forecast to reach USD 7,970.0 million by 2035, growing at a 39.47% CAGR.
What is inside the report
- 01Introduction
- 02Executive Summary
- 03Market Drivers
- 04Market Trends
- 05Market Challenges
- 06Market Opportunities
- 07Pricing and Cost per MW
- 08Licensing, Rules and Standards
- 09Market Segmentation
- 10DC Exclusive: Greece Grid-Ready Project Tracker
- 17chapters
- 2020-2024Historical period
- 2026-2035Forecast period
- —Companies profiled
Segmentation
Full analysis
The Greece Data Center Market is valued at USD 650.36 million in 2026 and is projected to reach USD 7.97 billion by 2035, up from USD 286.38 million in 2025, a CAGR of 39.47% from 2025 to 2035 (DC Market Insights estimate). Greece entered 2026 with only about 21 operating data centers and 44 megawatts (MW) of installed capacity, 34.1 MW of it in Attica, according to a PwC siting study for the Ministry of Digital Governance reported by TA NEA in September 2026. Against that small base, investors have expressed interest in 1.4 to 2.2 gigawatts (GW), and about 330 MW in Attica already holds grid connection terms, so the market is set by how fast the Independent Power Transmission Operator (IPTO) can energise sites rather than by demand. DC Market Insights builds 2025 spend as 15.5 MW under construction (the average of 9 MW completed in 2025 and 22 MW in 2026) × USD 9.50 million of facility cost per MW, plus about 1.4 MW of new AI halls × USD 35 million of AI IT per MW, plus conventional IT refresh on the installed 44 MW, which gives USD 286.38 million. The Greece Data Center Market covers capital spend on IT infrastructure, power, cooling and construction inside Greek data centers; AI workloads grow fastest at 52.74% a year and Western Macedonia is the fastest region at 75.58% because the former lignite site at Agios Dimitrios in Kozani is planned for a 300 MW first phase.
Key Market Statistics: What Is the Greece Data Center Market Worth in 2026?
DC Market Insights values the Greece Data Center Market at USD 650.36 million in 2026, 127.1% above the USD 286.38 million of 2025, because Microsoft’s first company-owned 19.2 MW facility and the 12.5 MW first phase of the PPC and Edgnex site in Attica are fitted out this year.
- Market size 2025: USD 286.38 million (DC Market Insights estimate)
- Market size 2026: USD 650.36 million
- Market size 2030: USD 4.26 billion
- Market size 2035: USD 7.97 billion
- CAGR 2025-2035: 39.47% (low case USD 4.79 billion, high case USD 10.36 billion in 2035)
- Largest component: IT Infrastructure, USD 139.13 million or 48.6% of 2025 spend
- Fastest segment: AI Workloads, 52.74% a year to USD 6.25 billion by 2035
- Leading region: Attica, USD 219.08 million or 76.5% of 2025 spend
- Fastest region: Western Macedonia, 75.58% a year
- Largest hub: Spata, USD 63.00 million in 2025
- Market leaders by capacity: Digital Realty (Lamda Hellix) in colocation; Microsoft, Amazon Web Services (AWS) and Data4 in the new build wave
How Much Is Greece Spending on Data Centers, 2020-2035?
The Greece Data Center Market size was valued at USD 53.49 million in 2020, reached USD 286.38 million in 2025, and is anticipated to reach USD 7.97 billion by 2035, at a CAGR of 39.47% during the forecast period.
| Attribute | Detail |
|---|---|
| Historical period | 2020-2024 |
| Base year | 2025 |
| Forecast period | 2026-2035 |
| Market size 2025 | USD 286.38 million |
| Market size 2026 | USD 650.36 million |
| CAGR 2025-2035 | 39.47% |
| Market size 2035 | USD 7.97 billion |
| Unit | USD million, nominal |
Spend grew 39.87% a year from 2020 to 2025 as installed capacity roughly doubled from about 20 MW to 44 MW, and the pace stays near 39.47% a year after 2025 because DC Market Insights expects 972 MW to be completed in 2026-2035, taking installed capacity to about 980 MW by 2035. DC Market Insights estimates that AI halls carry 31.6% of spend in 2025 and 78.4% by 2035.

What Counts as Greek Data Center Spend in This Market?
The Greece Data Center Market covers USD 286.38 million of 2025 capital spend on four layers inside Greek data centers: IT infrastructure (servers, storage, network), power (switchgear, uninterruptible power supply (UPS), generators), cooling and general construction.
Included
- IT hardware installed in Greek colocation, cloud, enterprise and government data centers, including AI accelerator servers
- Facility build cost per MW of new IT capacity: electrical, mechanical and shell works
- Refresh of AI hardware on the installed AI base (20% a year) and conventional IT spend on the installed conventional base
Excluded
- Land, IPTO and HEDNO (Hellenic Electricity Distribution Network Operator) grid reinforcement, electricity bills and the renewable plants that supply data centers
- Colocation rent and cloud service revenue, which are the return on this spend and are covered in the Greece Data Center Colocation Market report
- Submarine cable systems landing in Crete and Attica, and telecom networks outside the data hall
How the segments fit together
Every dimension sums to the same total: components (USD 139.13 million IT plus USD 147.25 million facility layers), workloads, data center types and end users each add up to USD 286.38 million in 2025. The facility layer alone is analysed in the Greece Data Center Infrastructure Market report, and storage hardware in the Greece Data Center Storage Market report.
Why Do Greece Data Center Market Estimates Differ?
Estimates for Greece differ because broader definitions add colocation revenue, telecom and electricity, while DC Market Insights counts only capital spend inside the halls, which is USD 650.36 million in 2026.
Earlier estimates, including the previous edition of this page at USD 1.43 billion for 2025, mixed colocation and cloud service revenue, network carriage and enterprise IT located outside data centers with build spend. Each is a real flow of money, but adding them to hardware and construction counts the same megawatt twice. A second gap is capacity: Greece had 44 MW installed in 2025, so a USD 1.43 billion capital market would imply about USD 32 million of yearly spend per installed MW, more than four times the Germany or Pakistan ratios in DC Market Insights models.
| Element | In this report | Why |
|---|---|---|
| IT, power, cooling and construction spend | Yes, USD 286.38 million in 2025 | Capital spend tied to MW built and installed |
| Colocation and cloud revenue | No | Return on the same assets |
| Electricity and renewable PPAs | No | Operating cost, not capital spend |
| Grid connection works by IPTO and HEDNO | No | Paid through network tariffs and guarantees |
| Submarine cables and landing stations | No | Telecom infrastructure outside the hall |
Out of scope therefore are colocation revenue, cloud revenue, electricity purchase agreements, grid reinforcement and submarine cable landing stations. In scope are all buyer groups that own or lease halls in Greece, from hyperscale cloud providers to banks, shipping companies and small and medium-sized enterprises (SMEs) that buy racks in carrier-neutral sites.
Why Are Hyperscalers Building Data Centers in Greece Now?
Three Greek-specific moves drive the Greece Data Center Market’s 39.47% a year growth: a 300 MW AWS first phase in Kozani, Microsoft’s three-site Attica region and a grid queue that jumped from 5 GW to 9 GW in two months.
Agios Dimitrios in Kozani: 300 MW First Phase, Up to 1 GW
Public Power Corporation (PPC) and Amazon Web Services plan a 300 MW first phase on the site of the retired Agios Dimitrios lignite station, expandable to 1 GW, according to Deputy Prime Minister Kostis Hatzidakis in September 2026. PPC budgets an initial EUR 1.2 billion for the site, as TA NEA reported. DC Market Insights books the campus from 2028 onward, which lifts Western Macedonia to USD 1.59 billion of spend by 2035, 20.0% of the national total.
Microsoft’s Attica Cloud Region: Nearly EUR 1 Billion Across Spata and Koropi
Microsoft is investing nearly EUR 1 billion in three facilities in Spata and Koropi, with its first company-owned site rated at 19.2 MW under construction, according to the company’s Microsoft in Greece page and TA NEA. A single 19.2 MW hall is 44% of the whole 2025 national base, which is why the 2026 market more than doubles to USD 650.36 million.
Grid Queue: IPTO Requests Rise from 5 GW to 9 GW
Applications to IPTO for data center connections rose from 5 GW to 9 GW in two months during summer 2026, according to the Ministry of Environment and Energy bill reported in October 2026. Only 1.4 to 2.2 GW of that is judged firm in the PwC study for the Ministry of Digital Governance, and DC Market Insights models 972 MW of completions to 2035, below the lower end of that band.
Which Trends Are Moving Greek Data Center Builds Out of Central Athens?
Greece data center builds are moving out of central Athens to eastern Attica and former coal land, and AI halls are lifting average spend per MW from USD 9.50 million to over USD 40 million once IT is included.
Eastern Attica Becomes the Hyperscale Corridor
Spata, Koropi and Paiania now hold the three largest projects: Microsoft in Spata and Koropi, Data4’s EUR 300 million campus of up to 90 MW in Paiania (per the Data4 announcement of September 2024), and the 46 MW Dromeus Capital and Apto project in Spata. DC Market Insights estimates these three hubs hold 58.0% of 2025 spend.
Renewable-Matched Campuses on Lignite Land
The draft grid rules give connection priority to sites above 200 MW that source 80% of power from a nearby generator or six-hour storage, and require at least 60% renewable supply for every site. This favours Western Macedonia, which has about 630 MW of grid headroom through 2034 according to the PwC study, and shifts 20.0% of 2035 spend there.
Mediterranean Submarine Cable Connectivity and the Athens-Thessaloniki Corridor
Submarine cable connectivity is the second siting test after power: Mediterranean submarine cable systems landing in Crete and Attica, used by carriers such as Telecom Italia Sparkle, link Greek halls to Italy, Israel and the Middle East, while a terrestrial fiber connectivity network along the Athens-Thessaloniki corridor carries traffic north to the Balkans. DC Market Insights estimates that carrier-neutral halls with direct cable access hold about 55% of 2025 spend through colocation, where Interxion Digital Realty, as the group is known in much of Europe, is the largest operator.
What Slows Data Center Builds in Greece?
In the Greece Data Center Market, grid guarantees of EUR 200,000 per MW and Attica grid congestion are the two main limits that could hold 2035 spend near the low case of USD 4.79 billion.
EUR 200,000 per MW Connection Guarantees
The Ministry of Environment and Energy bill asks applicants for letters of guarantee of EUR 200,000 per MW, valid for three years, and bars splitting projects to stay under the 10 MW HEDNO threshold. For a 100 MW campus this is EUR 20 million locked before construction, which DC Market Insights expects to remove speculative requests and delay some Attica phases by 12 to 24 months.
Attica Grid Congestion
Power grid congestion is sharpest in Attica, which attracts about 65% of investor interest, or 800 to 1,260 MW, but ranks only eighth among regions for available grid capacity through 2034, according to the PwC study. In the low case DC Market Insights cuts completions after 2026 by 35%, which lowers 2035 spend by 40%.
Archaeological Permitting Delays and Earthquake-Related Construction Standards
Complex archaeological permitting is a Greek-specific risk: excavation in Attica can trigger Ministry of Culture review, and DC Market Insights assumes archaeological permitting delays of 6 to 12 months on about a third of new Attica sites. Earthquake-related construction rules under the Greek seismic code and Eurocode 8 also raise structural cost; DC Market Insights estimates these construction standards raise capex on the shell by 3% to 5%, which is built into the USD 9.50 million per MW facility value.
Where Can Suppliers Win in the Greece Data Center Market by 2035?
The largest openings are AI fit-out, worth USD 1.97 billion in 2030, and the Western Macedonia build-out, worth USD 1.59 billion by 2035.
AI Fit-Out: USD 1.97 billion in 2030
DC Market Insights expects 55% of new Greek capacity in 2030 to be AI halls, each carrying about USD 33 million of accelerator servers, storage and fabric per MW. Integrators and server vendors that can deliver liquid-cooled racks into Attica and Kozani gain from USD 1.97 billion of yearly fit-out by 2030.
Western Macedonia: USD 1.59 billion by 2035
Electrical contractors, transformer makers and cooling suppliers can win a share of the USD 1.59 billion of 2035 spend in Western Macedonia, where PPC plans about EUR 5.75 billion of renewables, storage and data center investment in total, according to TA NEA.
How Much Does It Cost to Build a Data Center in Greece per MW?
In the Greece Data Center Market, a new facility costs about USD 9.50 million per MW of IT capacity to build in 2025 before IT equipment, and an AI hall adds about USD 35 million per MW of IT (DC Market Insights estimate).
| Year | Facility cost (USD million per MW) | AI IT (USD million per MW) | Conventional IT (USD million per installed MW a year) |
|---|---|---|---|
| 2020 | 8.19 | 35.00 | 1.65 |
| 2025 | 9.50 | 35.00 | 2.50 |
| 2030 | 11.01 | 32.50 | 2.50 |
| 2035 | 12.77 | 30.00 | 2.50 |
Greek anchors bracket the facility figure: the PPC and Edgnex Attica site budgets EUR 150 million for a 12.5 MW first phase, or EUR 12.0 million per MW (Source: Edgnex, December 2024), while the Dromeus Capital and Apto Spata project is EUR 300 million for 46 MW, or EUR 6.5 million per MW at full build-out (Source: TA NEA, September 2026). Data4’s EUR 300 million for up to 90 MW of power is a first-phase budget and is not used as a per-MW anchor. Colocation buyers pay per rack rather than per MW, so rack space utilization matters: DC Market Insights assumes Greek halls run at about 70% utilisation, which is why installed MW, not sold racks, drives the conventional IT line.
Which Rules Govern Data Center Licensing in Greece?
Greece data center licensing runs on 3 layers for the Greece Data Center Market: an environmental fast track for 2 to 20 MW sites, IPTO connection above 10 MW, and EU energy reporting for sites of 500 kilowatts (kW) and more.
- Joint Ministerial Decision ΥΠΕΝ/ΔΙΠΑ/82255/5190 (Government Gazette B 4095, 29 July 2025): Standard Environmental Commitments for Category B data centers of 2 MW to under 20 MW, with two 10-working-day steps; sites of 20 MW and above still need an Approval of Environmental Terms (Source: Government Gazette)
- Ministry of Environment and Energy grid bill (October 2026): IPTO licenses connections above 10 MW, HEDNO below; EUR 200,000 per MW guarantee; 60% renewable supply; priority for sites above 200 MW with 80% local supply (Source: Ministry of Environment and Energy)
- Delegated Regulation (EU) 2024/1364: annual energy and water reporting for data centers of 500 kW and more, applied to Greek operators since 2024
- Law 4014/2011: environmental licensing basis under which the 2025 decision was issued
- EN 50600 / ISO/IEC 22237: design and operation classes used in Greek public tenders
For a 20 MW data center, the line between Category B and A2 is the main licensing question: one MW less moves the project to the template route, but the bill bars splitting projects to fit under a threshold.
Which Segment Makes the Money in the Greece Data Center Market?
IT Infrastructure carries the most value at USD 139.13 million, or 48.6% of 2025 spend, and AI Workloads are the fastest-growing segment at 52.74% a year.
By Component
| Component | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| IT Infrastructure | 139.13 | 48.6% | 6,185.49 | 46.15% |
| Power Solutions | 66.26 | 23.1% | 804.33 | 28.36% |
| Cooling Systems | 29.45 | 10.3% | 357.48 | 28.36% |
| General Construction | 51.54 | 18.0% | 625.59 | 28.36% |
| Total | 286.38 | 100.0% | 7,972.90 | 39.47% |
By Workload
AI workloads reach USD 6.25 billion by 2035 because each new AI MW carries 14 times the yearly IT spend of a conventional MW.
| Workload | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| AI Workloads | 90.45 | 31.6% | 6,250.69 | 52.74% |
| Conventional Workloads | 195.93 | 68.4% | 1,722.21 | 24.28% |
| Total | 286.38 | 100.0% | 7,972.90 | 39.47% |
By Data Center Type
Cloud and hyperscale halls grow from 25.0% to 62.0% of spend as Microsoft and AWS build their own sites.
| Data Center Type | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Colocation | 157.51 | 55.0% | 2,232.41 | 30.36% |
| Cloud and Hyperscale | 71.59 | 25.0% | 4,943.20 | 52.73% |
| Enterprise and Government | 57.28 | 20.0% | 797.29 | 30.13% |
| Total | 286.38 | 100.0% | 7,972.90 | 39.47% |
By End User
Shipping, tourism and other buyers hold 18.0% of 2025 spend, a larger share than in most European markets because Piraeus-based shipping groups run their own server rooms; media and entertainment buyers sit in IT and Telecom, and cloud service providers sit under Cloud and Hyperscale.
| End User | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| IT and Telecom | 108.82 | 38.0% | 3,826.99 | 42.76% |
| BFSI | 51.55 | 18.0% | 1,116.21 | 36.00% |
| Government and Public Sector | 45.82 | 16.0% | 956.75 | 35.51% |
| Manufacturing and Energy | 28.64 | 10.0% | 956.75 | 42.03% |
| Shipping Tourism and Other | 51.55 | 18.0% | 1,116.21 | 36.00% |
| Total | 286.38 | 100.0% | 7,972.90 | 39.47% |
DC Exclusive: The Greece Grid-Ready Project Tracker (7 Projects, 475 MW Named)
For the Greece Data Center Market, DC Market Insights tracks 7 named projects with about 475 MW of first-phase capacity, more than ten times the 44 MW installed in 2025; this is a DC Market Insights model built from 21 inputs (project MW, budgets, status and the 1.4-2.2 GW interest band), and the values are estimates.
| Project | Location | MW | Budget | Status (latest public) |
|---|---|---|---|---|
| Microsoft Spata (first owned site) | Spata, Attica | 19.2 | Nearly EUR 1 billion for 3 sites | Under construction |
| PPC and Edgnex (Data In Scale) | Attica | 12.5 (25 later) | EUR 150 million first phase | Construction from Q1 2025 |
| Data4 ATH1 campus | Paiania, Attica | Up to 90 (power) | More than EUR 300 million | Two buildings planned |
| Dromeus Capital and Apto | Spata, Attica | 46 | EUR 300 million | Planned |
| PPC and AWS Agios Dimitrios | Kozani, Western Macedonia | 300 (1,000 later) | EUR 1.2 billion initial (PPC) | Planned |
| Digital Realty ATH3 (built by Metlen) | Koropi, Attica | 6.8 | Not disclosed | Delivered August 2025 |
| Digital Realty HER1 | Heraklion, Crete | 1 (5 later) | Not disclosed | Opened April 2025 |
The tracker explains the model’s shape: the 2026-2030 completions of 327 MW equal about 69% of the named first phases, because only about 330 MW in Attica holds connection terms today. Facility spend on the tracked projects alone is about USD 4.5 billion at 2025 costs (475 MW × USD 9.50 million), close to the model’s USD 4.09 billion of facility spend over 2025-2030.
Is Attica Still the Center of Greek Data Center Spend, and Which Region Grows Fastest?
In the Greece Data Center Market, Attica leads with USD 219.08 million in 2025, and Western Macedonia grows fastest at 75.58% a year to 2035.
Attica
Attica holds 76.5% of 2025 spend, USD 219.08 million, with 34.1 MW of the 44 MW national base and about 330 MW of connection terms; its share falls to 55.0% by 2035 as grid limits push large campuses north.
Western Macedonia
Western Macedonia is the fastest region at 75.58% a year, from USD 5.73 million of site preparation in 2025 to USD 1.59 billion by 2035, because the PPC and AWS campus at Agios Dimitrios reuses lignite-era grid connections.
Central Macedonia
Central Macedonia, centred on Thessaloniki, holds USD 22.91 million in 2025 and grows 38.57% a year as enterprise and edge sites serve northern Greece and the Balkans.
Rest of Greece
Rest of Greece, led by Boeotia with about 275 MW of investor interest in the PwC study, grows 45.24% a year to USD 1.08 billion by 2035.
Crete and the Islands
Crete and the Islands hold USD 12.89 million in 2025; Digital Realty’s HER1 in Heraklion (1 MW, scalable to 5 MW) serves submarine cables landing in Crete, and the region grows 37.83% a year.
Which Greek Hubs, from Spata to Kozani, Carry the Most Data Center Spend?
Within the Greece Data Center Market, Spata carries the most spend at USD 63.00 million in 2025, and Kozani (Agios Dimitrios) is the fastest-growing hub at 75.58% a year.
| Rank | Hub | 2025 (USD million) | 2035 (USD million) | CAGR 2025-2035 | Region |
|---|---|---|---|---|---|
| 1 | Spata | 63.00 | 1,355.39 | 35.92% | Attica |
| 2 | Koropi | 57.28 | 956.75 | 32.52% | Attica |
| 3 | Paiania | 45.82 | 1,116.21 | 37.62% | Attica |
| 4 | Athens Metro (Metamorfosi and Kifisia) | 40.09 | 558.10 | 30.13% | Attica |
| 5 | Thessaloniki | 22.91 | 597.97 | 38.57% | Central Macedonia |
| 6 | Rest of Attica | 12.89 | 398.64 | 40.94% | Attica |
| 7 | Boeotia | 10.02 | 597.97 | 50.51% | Rest of Greece |
| 8 | Heraklion | 8.59 | 223.24 | 38.51% | Crete and the Islands |
| 9 | Patras and Peloponnese | 8.59 | 239.19 | 39.47% | Rest of Greece |
| 10 | Corinth | 7.16 | 239.19 | 42.03% | Rest of Greece |
| 11 | Kozani (Agios Dimitrios) | 5.73 | 1,594.58 | 75.58% | Western Macedonia |
| 12 | Other Islands | 4.30 | 95.67 | 36.39% | Crete and the Islands |
What If the Kozani Campus Slips? Greece Data Center Market Forecast Scenarios to 2035
The 2035 Greece Data Center Market ranges from USD 4.79 billion in the low case to USD 10.36 billion in the high case, around a base of USD 7.97 billion.
| Scenario | Assumption | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|
| Low | Completions after 2026 cut 35%; AI share 10 points lower | 4,792.99 | 32.55% |
| Base | 972 MW completed 2026-2035; AI share 55% in 2030 | 7,972.90 | 39.47% |
| High | Completions after 2026 up 25%; AI share 5 points higher | 10,356.06 | 43.16% |
The swing factor is the Kozani campus: if its 300 MW first phase slips past 2030, most of the USD 1.59 billion that DC Market Insights places in Western Macedonia by 2035 moves later, towards the low case.
Which Companies Lead the Greece Data Center Market?
Digital Realty, through Lamda Hellix, operates the largest colocation base in Greece, and DC Market Insights estimates the top three owners (Digital Realty, Microsoft and Data4) will hold about 55% of 2026 spend, based on their share of MW under construction.
- Digital Realty (Lamda Hellix)
- Microsoft
- Amazon Web Services (AWS)
- Data4
- Public Power Corporation (PPC)
- Edgnex (Damac)
- Metlen Energy and Metals
- Dromeus Capital
- OTE Group (COSMOTE)
- Vodafone Greece
- Nova (formerly WIND Hellas)
- Intracom Telecom
- Space Hellas
- Schneider Electric
Digital Realty’s ATH3 in Koropi, delivered by Metlen in August 2025 at up to 6.8 MW and 8,600 square meters, was described as the largest data center in Greece (Source: Metlen, via To Vima, August 2025). Microsoft’s first owned site at 19.2 MW will be nearly three times that. Telecom groups OTE (COSMOTE), Vodafone and Nova run enterprise and carrier sites in Athens and Thessaloniki, and Greek integrators Intracom Telecom and Space Hellas supply IT fit-out to government buyers.
The threat of substitutes is low for the Greece Data Center Market: the repatriation of Greek workloads from data centers abroad, required for some public-sector and banking data, and the rapid fiber rollout to Greek homes and offices both add demand rather than replace it; DC Market Insights estimates that Government and Public Sector plus BFSI buyers hold 34.0% of 2025 spend (USD 97.37 million).
What Changed in the Greece Data Center Market in 2025 and 2026?
Six dated events in 2025-2026 moved the Greek pipeline from about 44 MW to more than 475 MW of named projects.
- In October 2026, the Ministry of Environment and Energy presented a bill on data center grid connections with EUR 200,000 per MW guarantees and a 10 MW IPTO threshold (Source: Ministry of Environment and Energy).
- In September 2026, Deputy Prime Minister Kostis Hatzidakis described the PPC and AWS 300 MW first phase at Agios Dimitrios, expandable to 1 GW (Source: Greek government).
- In March 2026, a PwC study for the Ministry of Digital Governance put investor interest at 1.4 to 2.2 GW, with 330 MW in Attica holding connection terms (Source: Ministry of Digital Governance).
- In August 2025, Metlen delivered Digital Realty’s 6.8 MW ATH3 in Koropi (Source: Metlen).
- In July 2025, Joint Ministerial Decision ΥΠΕΝ/ΔΙΠΑ/82255/5190 set Standard Environmental Commitments for 2 to 20 MW data centers (Source: Government Gazette B 4095/2025).
- In April 2025, Digital Realty opened HER1 in Heraklion, Crete, at 1 MW scalable to 5 MW (Source: Digital Realty).
Key Takeaways: What Should Investors Take from the Greece Data Center Market?
Four takeaways follow from a market that grows from USD 286.38 million to USD 7.97 billion.
- Grid, not demand, sets the pace: 9 GW of IPTO requests sit against 1.9 GW of system capacity in 2025, so connection terms are worth more than land.
- AI halls carry 78.4% of 2035 spend because each AI MW adds about USD 33 million of IT, against USD 2.5 million a year for a conventional MW.
- Western Macedonia rises from 2.0% to 20.0% of spend because lignite-era grid connections are available there now.
- Sites between 2 and 20 MW license fastest under the July 2025 decision, which favours edge and enterprise builds in Thessaloniki and Crete.
How We Built the Greece Data Center Market Model: Methodology and Receipts
DC Market Insights built the model bottom-up from 16 yearly capacity cohorts (2020-2035), 3 unit costs and 44 MW of 2025 installed capacity, giving USD 286.38 million for 2025.
- Capacity: 44 MW installed in 2025 (PwC study for the Ministry of Digital Governance), 9 MW completed in 2025, 327 MW in 2026-2030, 645 MW in 2031-2035, 1% a year retired; AI share of new capacity 15% in 2025, 55% in 2030 and 60% in 2035.
- Unit values: facility USD 9.50 million per MW in 2025, +3% a year; AI IT USD 35 million per new AI MW, falling to USD 30 million by 2035; 20% a year AI refresh; conventional IT USD 2.5 million per installed MW a year (8% lower each year before 2025).
- Check 1 (ceiling): 980 MW installed in 2035 is below the 1.4 GW lower end of investor interest and the 2.9 GW of IPTO system capacity for 2034.
- Check 2 (ceiling): model facility spend of USD 4.09 billion in 2025-2030 against about USD 4.5 billion for the 475 MW of named first phases.
- Check 3 (floor): Microsoft’s nearly EUR 1 billion over its three sites, spread over about 4 years, is about USD 0.28 billion a year, 43% of the 2026 total.
Euro figures are converted at USD 1.13 per EUR. The full approach is on the research methodology page, and the global context sits in the Data Center Market report.
Table of contents
- 01Introduction
- 1.1Market Definition and Scope
- 1.2Included and Excluded Spend
- 1.3Why Greece Data Center Market Estimates Differ
- 02Executive Summary
- 2.1Market Snapshot, 2025, 2026 and 2035
- 2.2Key Market Statistics
- 2.3Market Size 2020-2035
- 03Market Drivers
- 3.1Agios Dimitrios in Kozani: 300 MW First Phase
- 3.2Microsoft's Attica Cloud Region
- 3.3Grid Queue: IPTO Requests Rise from 5 GW to 9 GW
- 04Market Trends
- 4.1Eastern Attica Becomes the Hyperscale Corridor
- 4.2Renewable-Matched Campuses on Lignite Land
- 4.3Mediterranean Submarine Cable Connectivity and the Athens-Thessaloniki Corridor
- 05Market Challenges
- 5.1EUR 200,000 per MW Connection Guarantees
- 5.2Attica Grid Congestion
- 5.3Archaeological Permitting Delays and Earthquake-Related Construction Standards
- 06Market Opportunities
- 6.1AI Fit-Out
- 6.2Western Macedonia Build-Out
- 07Pricing and Cost per MW
- 7.1Facility, AI IT and Conventional IT Unit Values 2020-2035
- 7.2Greek Cost Anchors
- 08Licensing, Rules and Standards
- 8.1Joint Ministerial Decision 82255/5190 (2025)
- 8.2Grid Connection Bill (October 2026)
- 8.3Delegated Regulation (EU) 2024/1364
- 8.4EN 50600 / ISO/IEC 22237
- 09Market Segmentation
- 9.1By Component: IT Infrastructure / Power Solutions / Cooling Systems / General Construction
- 9.2By Workload: AI Workloads / Conventional Workloads
- 9.3By Data Center Type: Colocation / Cloud and Hyperscale / Enterprise and Government
- 9.4By End User: IT and Telecom / BFSI / Government and Public Sector / Manufacturing and Energy / Shipping Tourism and Other
- 10DC Exclusive: Greece Grid-Ready Project Tracker
- 10.1Microsoft Spata (first owned site)
- 10.2PPC and Edgnex (Data In Scale)
- 10.3Data4 ATH1 campus
- 10.4Dromeus Capital and Apto
- 10.5PPC and AWS Agios Dimitrios
- 10.6Digital Realty ATH3 (built by Metlen)
- 10.7Digital Realty HER1
- 11Regional Insights
- 11.1Attica
- 11.2Western Macedonia
- 11.3Central Macedonia
- 11.4Rest of Greece
- 11.5Crete and the Islands
- 12Hub Analysis
- 12.1Spata
- 12.2Koropi
- 12.3Paiania
- 12.4Athens Metro (Metamorfosi and Kifisia)
- 12.5Thessaloniki
- 12.6Rest of Attica
- 12.7Boeotia
- 12.8Heraklion
- 12.9Patras and Peloponnese
- 12.10Corinth
- 12.11Kozani (Agios Dimitrios)
- 12.12Other Islands
- 13Forecast Scenarios
- 13.1Low Case
- 13.2Base Case
- 13.3High Case
- 14Competitive Insights
- 14.1Digital Realty (Lamda Hellix)
- 14.2Microsoft
- 14.3Amazon Web Services (AWS)
- 14.4Google
- 14.5Data4
- 14.6Public Power Corporation (PPC)
- 14.7Edgnex (Damac)
- 14.8Metlen Energy and Metals
- 14.9Dromeus Capital
- 14.10OTE Group (COSMOTE)
- 14.11Vodafone Greece
- 14.12Nova (formerly WIND Hellas)
- 14.13Intracom Telecom
- 14.14Space Hellas
- 14.15Schneider Electric
- 15Recent Developments
- 15.1Grid Bill, Kozani Campus, PwC Study, ATH3, Licensing Decision and HER1 (2025-2026)
- 16Key Takeaways
- 16.1Four Takeaways for Investors and Suppliers
- 17Methodology
- 17.1Capacity Cohorts and Unit Values
- 17.2Three Bound Checks
- 17.3Research Methodology
- Fig. 1Greece Data Center Market Size, 2020-2035 (USD million)
- Table 1Market Snapshot
- Table 2Scope Comparison
- Table 3Cost per MW, 2020-2035
- Table 4By Component
- Table 5By Workload
- Table 6By Data Center Type
- Table 7By End User
- Table 8Greece Grid-Ready Project Tracker
- Table 9Hub Analysis
- Table 10Forecast Scenarios
About this report
Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.
Read our methodologyHow we built this
- Historical period2020-2024
- Base year2025
- Forecast period2026-2035
- Sizing approachTop-down + bottom-up
Need more than the report?
Advisory on this market
Due diligence, site selection and market entry work, by the analysts who wrote this report.
See consulting servicesFrequently asked questions
USD 650.36 million in 2026, up 127.1% from USD 286.38 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 7.97 billion by 2035, a CAGR of 39.47% from 2025.
About 21 operating data centers with 44 MW of installed capacity in 2025, 34.1 MW of it in Attica, according to a PwC study for the Ministry of Digital Governance. Named projects add about 475 MW of first-phase capacity.
39.47% a year from 2025 to 2035, after 39.87% a year in 2020-2025, because DC Market Insights expects 972 MW of new capacity to be completed in 2026-2035 on a 44 MW base.
Sites of 2 MW to under 20 MW use Standard Environmental Commitments under Joint Ministerial Decision 82255/5190 of July 2025, with two 10-working-day steps; 20 MW and above need full environmental terms, and IPTO grants grid connections above 10 MW.
AI Workloads, at 52.74% a year to USD 6.25 billion by 2035, because each new AI MW carries about USD 33 million to USD 35 million of IT equipment.
About USD 9.50 million per MW of IT capacity in 2025 for the building, power and cooling (DC Market Insights estimate), within Greek anchors of EUR 6.5 million to EUR 12.0 million per MW; AI IT adds about USD 35 million per MW.
Attica, with USD 219.08 million or 76.5% of 2025 spend. Western Macedonia grows fastest at 75.58% a year because of the planned 300 MW PPC and AWS campus in Kozani.
Digital Realty (Lamda Hellix), Microsoft and Data4 hold about 55% of 2026 spend by MW under construction (DC Market Insights estimate), followed by AWS, PPC, Edgnex, OTE (COSMOTE) and Vodafone Greece.
USD 650.36 million in 2026 is DC Market Insights’ capital-spend figure for IT, power, cooling and construction only. Estimates that add colocation revenue, telecom networks or electricity come out several times larger.
EUR 200,000 per MW guarantees valid for three years, at least 60% renewable supply, IPTO connection above 10 MW and priority for sites above 200 MW with 80% local supply, under the October 2026 Ministry of Environment and Energy bill.
Get this report
How do I get the full report?
Request a quote; we reply by email within one business day.
How and when will I receive the report?
By email, within 24–48 business hours of payment.
How can I pay?
Once you accept the quote, we email you a secure payment link.
Can I see a sample first?
Yes. Request a free sample and we will email it to you.
Can the report be tailored to my needs?
Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.
Can I get an invoice or pay against a purchase order?
Write to sales@dcmarketinsights.com and our team will help.