In short

As of 16 November 2026, DC Market Insights tracks 11 data centers operated by Data4 in 6 countries, of which 5 are operational. Stated operational capacity is 535 MW, with a further 180 MW under construction and 1,190 MW planned. The pipeline is 2.6 times the capacity already operating.

11Facilities tracked
6Countries
535 MWOperational (5 sites)
180 MWUnder construction (1 site)
1,190 MWPlanned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 11 of 11 facilities have a stated capacity; the others are counted as sites only.

Data4 PAR01 campus · Data4 · Nozay (approximate location)Data4 PAR02 · Data4 · Marcoussis (approximate location)Data4 PAR03 AI campus · Data4 · Nozay (approximate location)Data4 MIL01 Cornaredo · Data4 · Cornaredo (approximate location)Data4 MIL02 Vittuone · Data4 · Vittuone (approximate location)Data4 MAD01 Alcobendas · Data4 · Alcobendas (approximate location)Data4 MAD02 San Agustín del Guadalix · Data4 · San Agustín del Guadalix (approximate location)Data4 Warsaw campus (Jawczyce) · Data4 · Jawczyce (approximate location)Data4 ATH1 Paiania · Data4 · Paiania (approximate location)Data4 Escaudain campus · Data4 · Escaudain (approximate location)Data4 Hanau campus · Data4 · Hanau am Main (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Data4 data centers: key facts

About Data4

Data4 is a European data center operator and investor that finances, designs, builds and operates its own campuses. It says it operates ten campuses across six European countries (France, Italy, Spain, Poland, Germany and Greece) as of June 2026, and 38 data centers in six countries as of December 2025, with about 165,000 sqm of IT space, 1.5 GW of available energy and a 200-hectare land bank. Its largest site is the Paris-Saclay campus at Nozay and Marcoussis; its biggest project is a 700 MW campus at Escaudain in Northern France.

Headquarters
Paris, France
Founded
2006
Ownership
Brookfield-backed; Arjun Infrastructure Partners and Interogo Holding joined in 2025
Parent company
Brookfield
Tracked footprint
11 facilities in 6 countries
Website
data4group.com

Data center business

  • Energy: Data4 says it buys low-carbon power through a mix of renewable and nuclear supply under long-term contracts. It signed a twelve-year Nuclear Production Allocation Contract with EDF giving 40 MW of nuclear power (about 230 GWh a year) from 2026, the first such contract for a data center operator in France, and targets a PUE below 1.3 at new sites.
  • Data4 describes itself as a European data center operator in France, Italy, Spain, Poland, Germany and Greece. The group finances, designs, constructs and operates its own data centers, sold from a single colocation rack up to a dedicated building, under a campus model with interconnected fibre inside each campus and links to about 220 cloud providers and carriers.
  • Company-wide resources stated on its home page: 10 campuses, 165,000 sqm of IT space, 1.5 GW of available energy, a 200-hectare land bank and 21 additional data centers being built. The home page meta description says Data4 operates 16 data centers; a December 2025 company article gives 38 data centers in six countries, so the count depends on how buildings are grouped.
  • Paris-Saclay campus: 133 ha and 505 MW of capacity across three sites, PAR01 (3 Route de Marcoussis, Nozay; 250 MW, 110 ha), PAR02 (15 rue Angiboust, Marcoussis; 5 MW, 1 ha) and PAR03 (7 Route Villejust, Nozay; 250 MW, 22 ha). Data4 says it turned former Alcatel and Nokia industrial sites near Paris into a 500 MW data center hub.
  • Milan campus at Cornaredo: 28 ha and 317 MW, with MIL01 (Via Monzoro 101-105, Cornaredo; 170 MW, 20 ha) and MIL02 (Vittuone; 100 MW, 8 ha). Madrid: 100 MW across MAD01 (Avenida de la Industria 15, Alcobendas; 50 MW, 4 ha) and MAD02 (San Agustín del Guadalix; 50 MW, 6.7 ha).
  • Warsaw campus at Przyparkowa 21, Jawczyce (Ożarów Mazowiecki): 4 ha with available IT power of up to 60 MW. The first building opened in 2023 and a second 10 MW data center was inaugurated in April 2026; the campus is planned for about 50,000 sqm of built space, 15,000 sqm of it IT space.
  • Frankfurt-Hanau campus on Depotstraße, Hanau: 25 ha of land and 180 MW of available electricity, on the former Grossauheim barracks site; Data4 plans to invest over EUR 1 billion and develop it in stages until 2032. Athens campus (ATH1) at Agiou Louka 33, Paiania: 7.5 ha and up to 90 MW, a first investment of over EUR 300 million announced in September 2024.

Recent updates

  • 22 Jun 2026: in its 20th year, Data4 said it plans more than 100 new hires in the coming months after growing its workforce by 46% in 2025, driven by new campuses in France, Greece and Germany.
  • 12 Jun 2026: Data4 launched a EUR 5 billion data center campus at Escaudain, Northern France, on the 33-hectare former Parc des Soufflantes industrial site. The campus is to deliver 700 MW, the largest project Data4 has developed. Data4 plans to invest more than EUR 20 billion in Europe by 2030.
  • 9 Apr 2026: Data4 inaugurated a second data center at its Jawczyce campus near Warsaw, with 10 MW of capacity and BREEAM Excellent certification. It has invested nearly EUR 200 million in Poland and plans about EUR 600 million by 2030; the first building reports a PUE of 1.27.
  • 15 Dec 2025: Data4 said it operates 38 data centers in six countries and plans to invest over EUR 21 billion by 2030 to double its capacity, citing the 180 MW Hanau campus near Frankfurt.
  • 29 Oct 2025: Data4, RTE and Schneider Electric launched Europe's first demonstrator on how data centers interact with the power grid, at the Marcoussis campus, as part of EPRI's DCFLEX initiative.
  • 1 Aug 2025: Arjun Infrastructure Partners and Interogo Holding joined Data4's shareholder base alongside Brookfield, investing in its hyperscale portfolio in Paris, Milan and Madrid, which has a combined contracted capacity of 244 MW. The Data4 team keeps managing and operating the sites.

Company details checked against company and official sources, 16 Nov 2026.

  • Capacity under construction or planned (1,370 MW) is 2.6 times the operational base of 535 MW.
  • Its largest operational site is Data4 PAR01 campus in Nozay, France at 250 MW.
  • The largest project in the pipeline is Data4 Escaudain campus (700 MW, planned).
  • France accounts for 63% of tracked capacity (4 facilities).
  • By type, the tracker lists 8 colocation and 3 hyperscale facilities.
Capacity by status, MW
Operational535 MW
Under construction180 MW
Planned1,190 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
France1,205 MW
Italy270 MW
Germany180 MW
Spain100 MW
Greece90 MW
Poland60 MW

OperationalUnder construction or planned

Facilities by type
Colocation8
Hyperscale3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Data4 development pipeline

Under construction and planned facilities with a stated capacity, largest first. 180 MW under construction and 1,190 MW planned in total.

ProjectLocationStatusTypeCapacity
Data4 Escaudain campusData4 Escaudain, France Planned Hyperscale 700 MW
Data4 PAR03 AI campusData4 Nozay, France Planned Hyperscale 250 MW
Data4 Hanau campusData4 Hanau am Main, Germany Under construction Hyperscale 180 MW
Data4 MIL02 VittuoneData4 Vittuone, Italy Planned Colocation 100 MW
Data4 ATH1 PaianiaData4 Paiania, Greece Planned Colocation 90 MW
Data4 MAD02 San Agustín del GuadalixData4 San Agustín del Guadalix, Spain Planned Colocation 50 MW

Facilities

11 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Data4 Escaudain campusHyperscale
History
  1. Announced
  2. Planned
Escaudain, France Planned 700 MW total — Operator / official
Data4 PAR01 campusColocation Nozay, France Operational 250 MW — Operator / official
Data4 PAR03 AI campusHyperscale
History
  1. Announced
  2. Planned
Nozay, France Planned 250 MW — Operator / official
Data4 Hanau campusHyperscale Hanau am Main, Germany Under construction 180 MW total — Operator / official
Data4 MIL01 CornaredoColocation Cornaredo, Italy Operational 170 MW — Operator / official
Data4 MIL02 VittuoneColocation Vittuone, Italy Planned 100 MW — Operator / official
Data4 ATH1 PaianiaColocation
History
  1. Announced
  2. Planned
Paiania, Greece Planned 90 MW total — Operator / official
Data4 Warsaw campus (Jawczyce)Colocation
History
  1. Operational
  2. Operational
  3. Operational
Jawczyce, Poland Operational 60 MW total — Operator / official
Data4 MAD01 AlcobendasColocation
History
  1. Operational
  2. Operational
Alcobendas, Spain Operational 50 MW — Operator / official
Data4 MAD02 San Agustín del GuadalixColocation
History
  1. Announced
  2. Planned
San Agustín del Guadalix, Spain Planned 50 MW total — Operator / official
Data4 PAR02Colocation Marcoussis, France Operational 5 MW — Operator / official

Market position

How Data4 compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In France, Data4 ranks #1 of 10 tracked operators by capacity, with 69% of the country’s tracked MW.
  • France has 55 tracked data centers from 10 operators: 322 MW operational and 1,413 MW under construction or planned.
  • Industrial electricity in France costs 104 USD/MWh (2025, latest official figure).
  • In Italy, Data4 ranks #1 of 7 tracked operators by capacity, with 31% of the country’s tracked MW.
  • In Spain, Data4 ranks #1 of 12 tracked operators by capacity, with 39% of the country’s tracked MW.
  • Our Deal Tracker lists 1 deal(s) naming Data4, the latest on 16 November 2026.

Data center operators in France

Tracked facilities5510 operators
Operational capacity322 MW1,413 MW in the pipeline
Data4 rank by capacity#1of 10 operators · 69%
Industrial power price104 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Digital Realty14—176 MW
Colt DCS524 MW137 MW
CloudHQ1—150 MW
Scaleway120 MW—
Telehouse318 MW—
CyrusOne14.5 MW—
Cogent16——
Equinix9——

All data centers in France Power and policy in France

Data center operators in Italy

Tracked facilities107 operators
Operational capacity170 MW693 MW in the pipeline
Data4 rank by capacity#1of 7 operators · 31%
Industrial power price184 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
CloudHQ1—240 MW
NTT DATA1—128 MW
Vantage Data Centers2—96 MW
CyrusOne2—81 MW
Compass Datacenters1—48 MW
QTS1——

All data centers in Italy Power and policy in Italy

Data center operators in Spain

Tracked facilities2112 operators
Operational capacity79.4 MW175 MW in the pipeline
Data4 rank by capacity#1of 12 operators · 39%
Industrial power price113 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Ark Data Centres1—65 MW
Prime Data Centers1—40 MW
Iron Mountain33 MW20 MW
CyrusOne118 MW—
EdgeConneX18.4 MW—
MERLIN Edged (MERLIN Properties / Edged Energy)5——
Microsoft3——
QTS1——

All data centers in Spain Power and policy in Spain

Deals naming Data4

  • Hellenic Innovation and Infrastructure Fund (HIIF) → Data4 Greece S.A. (23%), DC01 of the Athens Campus, Paiania (15 MW) M&A

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Data4 operate?

DC Market Insights tracks 11 Data4 data center(s) in 6 countries as of November 2026: 5 operational, 1 under construction and 5 planned.

Where is Data4 headquartered?

Data4 is headquartered in Paris, France. Ownership: Brookfield-backed; Arjun Infrastructure Partners and Interogo Holding joined in 2025.

Which other companies operate data centers in France?

Besides Data4, the largest operators we track in France by capacity are Digital Realty, Colt DCS, CloudHQ, Scaleway and Telehouse. The France page lists all 10 operators.

What rules apply to data centers in France?

Our Power & Policy Tracker lists 9 government actions on data centers and power in France, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst