In short

As of 10 October 2026, DC Market Insights tracks 6 data centers operated by Applied Digital in 1 country, of which 2 are operational. Stated operational capacity is 250 MW, with a further 150 MW under construction and — planned. The pipeline is 0.6 times the capacity already operating.

6Facilities tracked
1Countries
250 MWOperational (2 sites)
150 MWUnder construction (3 sites)
—Planned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 6 facilities have a stated capacity; the others are counted as sites only.

Polaris Forge 1 Building 1 · Applied Digital · Ellendale (approximate location) · Cooling: Direct liquid · Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years)Polaris Forge 1 Building 2 · Applied Digital · Ellendale (approximate location) · Cooling: Direct liquid · Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years)Polaris Forge 1 Building 3 · Applied Digital · Ellendale (approximate location) · Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years)Polaris Forge 3 · Applied Digital · Center (approximate location) · Cooling: Direct liquid · Leased in colocation: high investment-grade hyperscaler (not named by Applied Digital), two about 15-year leases
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Applied Digital data centers: key facts

  • Capacity under construction or planned (150 MW) is 0.6 times the operational base of 250 MW.
  • Its largest operational site is Polaris Forge 1 Building 2 in Ellendale, United States at 150 MW.
  • The largest project in the pipeline is Polaris Forge 1 Building 3 by Applied Digital (150 MW, under construction).
  • 3 of 6 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational250 MW
Under construction150 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Applied Digital development pipeline

Under construction and planned facilities with a stated capacity, largest first. 150 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Polaris Forge 1 Building 3Applied Digital Ellendale, United States Under construction Hyperscale 150 MW

Facilities

6 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Polaris Forge 1 Building 2Hyperscale Cooling: Direct liquid · Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years)
History
  1. Operational
  2. Operational
  3. Operational
Ellendale, United States Operational 150 MW IT 2026 Operator / official
Polaris Forge 1 Building 3Hyperscale Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years) Ellendale, United States Under construction 150 MW — Operator / official
Polaris Forge 1 Building 1Hyperscale Cooling: Direct liquid · Leased in colocation: CoreWeave leases the Polaris Forge 1 campus from Applied Digital (400 MW, 15 years) Ellendale, United States Operational 100 MW IT 2025 Operator / official
Delta Forge 2Hyperscale
1 deal
United States Planned — — Trade press
Polaris Forge 2Hyperscale Cooling: Direct liquid · Leased in colocation: U.S.-based investment-grade hyperscaler (not named by Applied Digital), about 15-year lease for 200 MW critical IT Harwood, United States Under construction — — Operator / official
Polaris Forge 3Hyperscale Cooling: Direct liquid · Leased in colocation: high investment-grade hyperscaler (not named by Applied Digital), two about 15-year leases Center, United States Under construction — — Operator / official

Market position

How Applied Digital compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Applied Digital ranks #31 of 171 tracked operators by capacity, with 0.5% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Our Deal Tracker lists 2 deal(s) naming Applied Digital, the latest on 21 October 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Applied Digital rank by capacity#31of 171 operators · 0.5%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Deals naming Applied Digital

  • Applied Digital Corporation (51%); Soluna Holdings (49%) → Project Dorothy 3, planned 50 MW critical IT AI/HPC data center near Silverton, Briscoe County, Texas, co-located with 150 MW Briscoe Wind JV / partnership
  • Applied Digital → Up to 1GW potential power capacity site in Finland (first non-US development) Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Applied Digital operate?

DC Market Insights tracks 6 Applied Digital data center(s) in 1 country as of October 2026: 2 operational, 3 under construction and 1 planned.

Which other companies operate data centers in United States?

Besides Applied Digital, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst