In short
As of 16 October 2026, DC Market Insights tracks 32 data centers operated by H5 Data Centers in 1 country, of which 30 are operational. Stated operational capacity is 93.3 MW, with a further 42 MW under construction and 36 MW planned. The pipeline is 0.8 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 8 of 32 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
H5 Data Centers data centers: key facts
About H5 Data Centers
H5 Data Centers is a privately held US operator of wholesale data centers and colocation, founded and led by CEO Josh Simms and based in the Denver area (5350 South Valentia Way). It states it operates in 25 US markets with over 4 million square feet of data center space under management. The company has grown mainly by buying enterprise data centers and carrier hotels, including seven vXchnge sites (2021) and three 365 Data Centers sites in Buffalo, Nashville and Tampa bought with Novacap (2026), and is building new capacity such as a 42 MW development in Ashburn, Virginia and a 36 MW Chicago site.
- Headquarters
- Denver, United States
- Ownership
- Privately held; founder-led (CEO Josh Simms)
- Parent company
- None (independent, privately held)
- Tracked footprint
- 32 facilities in 1 country
- Website
- h5datacenters.com
Data center business
- H5 Data Centers describes itself as one of the leading data center operators in the United States, with over 4 million square feet of data center space under management, operating in 25 US markets.
- Josh Simms is the CEO and founder; the company calls itself one of the largest privately held data center companies in the US. Other leaders listed: CFO Lisa Doverspike and COO David Dunn.
- The corporate address given on the contact page is 5350 South Valentia Way, Denver, CO 80111; most company releases carry a Denver, CO dateline.
- Chicago: a purpose-built site at 1951 W. Hastings St. on 3.6 acres with 36 MW of total power capacity, 18 MW available in the initial phase, Tier III N+1 design and utility feeds from two substations.
- Omaha (La Vista, NE): a 234,500 SF campus on 32 acres at 10917 Harry Watanabe Pkwy with 17.3 MW of N+1 critical capacity and a Tier III design.
- Ashburn, VA: a 255,000 SF new build at 21800 Beaumeade Circle with access to 42 MW from Dominion Power (up to 60 MVA); the site page says the first phase would be available in Q3 2024.
- Charlotte: a 207,000 SF mixed-use facility on 28 acres at 10105 David Taylor Drive, with an adjacent 200,000 SF build planned for up to 20 critical MW.
- Atlanta: a 110,000 SF data center and carrier hotel at 345 Courtland St. NE.
Acquisitions and expansions
- Phase three expansion at the San Antonio edge data center, 100 Taylor Street: up to 340 more cabinets and up to 1.5 MW of additional UPS capacity.
- Phase three expansion at 2600 W. Germann Road, Chandler (Phoenix): an additional 30,000 SF and up to 6 critical MW.
- Broke ground on a three-story, 255,000 SF data center on Beaumeade Circle, Ashburn, supporting 42 MW of critical load, with availability planned for Q3 2024.
- Acquired 505 Marquette, an approximately 225,000 SF carrier hotel in downtown Albuquerque with more than 20 on-site carriers.
- Announced a build-out of more than 20,000 SF at 345 Courtland St. NE, Atlanta, bringing the site to up to 3 MW of concurrently maintainable Tier III infrastructure.
- Acquired 925 Dalton Avenue, a 107,000 SF Tier III enterprise data center in Cincinnati originally developed by PNC Bank.
- Acquired seven data centers from vXchnge in Nashville, Philadelphia, Pittsburgh, Portland, Secaucus (New Jersey), St. Louis and St. Paul.
- Acquired a 240,000 SF purpose-built data center on a 63-acre campus in Quincy, Washington from Intuit Inc., with over 40 MW of turn-key colocation space at full build-out.
Recent updates
- Announced the acquisition of three data centers from 365 Data Centers in Buffalo, NY, Nashville, TN and Tampa, FL through a joint venture with Novacap, the second portfolio the two have acquired together.
- Expanded its partnership with Megaport to bring private cloud connectivity across its data center portfolio (release dated December 2025).
- Partnered with DE-CIX so that SAT-IX, the internet exchange at its San Antonio site, became the first exchange to join DE-CIX as a Turnkey Connectivity Partner.
Company details checked against company and official sources, 16 Oct 2026.
- Capacity under construction or planned (78 MW) is 0.8 times the operational base of 93.3 MW.
- Its largest operational site is H5 Phoenix Data Center Chandler in Chandler, United States at 26 MW.
- The largest project in the pipeline is H5 Ashburn (42 MW, under construction).
- By type, the tracker lists 31 colocation and 1 hyperscale facilities.
- 8 of 32 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
H5 Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 42 MW under construction and 36 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| H5 AshburnH5 Data Centers | Ashburn, United States | Under construction | Hyperscale | 42 MW |
| H5 Chicago Data CenterH5 Data Centers | Chicago, United States | Planned | Colocation | 36 MW |
Facilities
32 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| H5 AshburnHyperscale | Ashburn, United States | Under construction | 42 MW total | — | Operator / official |
| H5 Chicago Data CenterColocation | Chicago, United States | Planned | 36 MW total | — | Operator / official |
| H5 Phoenix Data Center ChandlerColocation | Chandler, United States | Operational | 26 MW total | — | Operator / official |
| H5 Virginia Data Center Campus ChantillyColocation | Chantilly, United States | Operational | 23 MW IT | — | Operator / official |
| H5 Omaha Data CenterColocation | La Vista, United States | Operational | 17.3 MW IT | — | Operator / official |
| H5 HerndonColocation | Herndon, United States | Operational | 15 MW IT | — | Operator / official |
| H5 Buffalo IIColocation | Lockport, United States | Operational | 9 MW total | — | Operator / official |
H5 Atlanta Data CenterColocation
History
|
Atlanta, United States | Operational | 3 MW total | — | Operator / official |
| H5 Albuquerque Data CenterColocation | Albuquerque, United States | Operational | — | — | Operator / official |
| H5 Buffalo IColocation | Lockport, United States | Operational | — | — | Operator / official |
| H5 Buffalo IIIColocation | Buffalo, United States | Operational | — | — | Operator / official |
| H5 Charlotte Data CenterColocation | Charlotte, United States | Operational | — | — | Operator / official |
| H5 Cincinnati I Data CenterColocation | Cincinnati, United States | Operational | — | — | Operator / official |
H5 Cincinnati II Data CenterColocation
History
|
Cincinnati, United States | Operational | — | — | Operator / official |
| H5 Cleveland Data CenterColocation | Cleveland, United States | Operational | — | — | Operator / official |
| H5 Data Centers San AntonioColocation | San Antonio, United States | Operational | — | — | Operator / official |
| H5 DenverColocation | Greenwood Village, United States | Operational | — | — | Operator / official |
| H5 Minneapolis Data Center (St. Paul)Colocation | St. Paul, United States | Operational | — | — | Operator / official |
| H5 New Jersey SecaucusColocation | Secaucus, United States | Operational | — | — | Operator / official |
| H5 New York 325 Hudson StreetColocation | New York City, United States | Operational | — | — | Operator / official |
| H5 PhiladelphiaColocation | Philadelphia, United States | Operational | — | — | Operator / official |
| H5 PittsburghColocation | Pittsburgh, United States | Operational | — | — | Operator / official |
| H5 Portland Data CenterColocation | Portland, United States | Operational | — | — | Operator / official |
| H5 QuincyColocation Cooling: Chilled water, cooling towers | Quincy, United States | Operational | — | — | Operator / official |
| H5 Quincy IIColocation | Quincy, United States | Operational | — | — | Operator / official |
| H5 Quincy IIIColocation | Quincy, United States | Operational | — | — | Operator / official |
| H5 San Luis Obispo Data CenterColocation | San Luis Obispo, United States | Operational | — | — | Operator / official |
| H5 SeattleColocation | Seattle, United States | Operational | — | — | Operator / official |
| H5 Silicon Valley Data CenterColocation | Sunnyvale, United States | Operational | — | — | Operator / official |
| H5 St. Louis Data Center (Globe Building)Colocation | St. Louis, United States | Operational | — | — | Operator / official |
Nashville Data CenterColocation
1 deal
|
Nashville, United States | Operational | — | — | Operator / official |
Tampa Data CenterColocation
1 deal
|
Tampa, United States | Operational | — | — | Operator / official |
Market position
How H5 Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, H5 Data Centers ranks #39 of 171 tracked operators by capacity, with 0.2% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Quincy also hosts 4 other tracked data center(s), run by Sabey Data Centers, Vantage Data Centers, CyrusOne and Microsoft.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Quincy
- Sabey SDC Quincy (Intergate.Quincy) · Sabey Data Centers · Operational · 123 MW
- Vantage WA1 Quincy · Vantage Data Centers · Operational · 89 MW
- CyrusOne PNW1 Quincy · CyrusOne · Operational · 36 MW
- Microsoft Quincy · Microsoft · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does H5 Data Centers operate?
DC Market Insights tracks 32 H5 Data Centers data center(s) in 1 country as of October 2026: 30 operational, 1 under construction and 1 planned.
Where is H5 Data Centers headquartered?
H5 Data Centers is headquartered in Denver, United States. Ownership: Privately held; founder-led (CEO Josh Simms).
Which other companies operate data centers in United States?
Besides H5 Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Quincy?
Other tracked data centers in Quincy include Sabey SDC Quincy (Intergate.Quincy) (Sabey Data Centers), Vantage WA1 Quincy (Vantage Data Centers), CyrusOne PNW1 Quincy (CyrusOne) and Microsoft Quincy (Microsoft).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.