Sabey Data Centers Data Centers
Data centers operated by Sabey Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 6 November 2026, DC Market Insights tracks 11 data centers operated by Sabey Data Centers in 1 country, of which 7 are operational. Stated operational capacity is 265 MW, with a further 228 MW under construction and — planned. The pipeline is 0.9 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 7 of 11 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Sabey Data Centers data centers: key facts
About Sabey Data Centers
Sabey Data Centers (Sabey Data Center Properties, LLC) is a US owner, developer and operator of multi-tenant data centers. On 8 July 2026 it said the platform spans six energized campuses totaling approximately 251 MW of operating capacity, with an opportunity to triple that output by 2036 on existing land holdings. Its campuses are in Seattle, East Wenatchee and Quincy (Washington), Ashburn (Virginia), Round Rock near Austin (Texas) and Manhattan (New York), with a seventh campus under construction in Umatilla, Oregon and a proposed campus in Indianapolis.
- Headquarters
- Seattle, United States
- Founded
- 2010
- Ownership
- JV of Sabey Corporation and National Real Estate Advisors; Ares minority stake
- Parent company
- Sabey Corporation and National Real Estate Advisors (joint owners)
- Tracked footprint
- 11 facilities in 1 country
- Website
- sabeydatacenters.com
Data center business
- Sabey Corporation was founded in 1972 as a commercial real estate developer. In 2010 it partnered with investor National Real Estate Advisors to create Sabey Data Centers; the company says it has designed, constructed and operated more than 3.5 million square feet of data center space, and its portfolio has grown to six data center campuses.
- SDC Quincy in Quincy, Washington is the largest campus in the portfolio: 530,000 square feet across five purpose-built buildings with 123 MW of data center power, an average annualized PUE of 1.2 and hydropower at $0.038 per kWh. A 2023 phase of two buildings added over 85 MW of critical power.
- SDC Columbia in East Wenatchee, Washington has 70 MW of data center power, an average annualized PUE of 1.2 and hydro power from Douglas County PUD at $0.05 per kWh; three buildings are on campus and a fourth is under construction.
- SDC Seattle in Tukwila is the flagship campus, with over a million square feet of space, 54 MW of data center power, about 20 carriers and 100% carbon-free power from Seattle City Light.
- SDC Ashburn is a 38-acre campus in Loudoun County, Virginia with 85 MW of planned campus capacity. Two of three buildings are complete with over 36 MW of power; Building A, the third and final building, adds 54 MW and supports racks above 100 kW with an average annualized PUE of 1.35.
- SDC Austin in Round Rock, Texas has two purpose-built data centers with up to 84 MW of critical IT load across 603,300 square feet and up to 200 kW per cabinet. The first building was completed in October 2024 and hosts the Texas Advanced Computing Center's Horizon supercomputer.
- SDC Manhattan occupies the former Verizon Building at 375 Pearl Street, New York: 32 floors, a 222,000 square foot dedicated data center footprint, 18 MW of data center power and 23 carriers.
- SDC Umatilla is a 60-acre campus in Umatilla, Oregon with 120 MW+ of aggregate power coming. Sabey bought the land in 2023 and plans two buildings totaling over 714,000 square feet.
Recent updates
- Sabey began piloting hydrotreated vegetable oil (HVO) renewable diesel as the primary fuel in backup generators at SDC Austin to test it for wider use across its portfolio.
- Sabey outlined commitments for a proposed campus of about 130 acres at 6400 Kentucky Avenue in Decatur Township, Indianapolis: two buildings of about one million square feet, a new substation, closed-loop cooling and $4.25 billion of projected taxable investment. Construction is expected to begin in Q2 2027, with phased occupancy from Q4 2029 through 2035.
- Sabey held a Going Vertical ceremony on 15 July 2026 marking the first steel rising at SDC Umatilla in Northeast Oregon; the campus uses a closed-loop cooling system.
- Ares Secondaries funds made a minority equity investment in Sabey Data Center Properties, LLC, jointly owned and governed by Sabey and National Real Estate Advisors. The platform spans six energized campuses with approximately 251 MW of operating capacity.
- Sabey reported a 25.2% cut in Scope 1 and 2 emissions from a 2018 baseline in its 2024 Sustainability Report, an MOU with TerraPower on advanced nuclear, and a net-zero target for Scope 1 and 2 by 2029.
- Q4 2025 inventory: SDC Columbia 4.5 MW leasable and 18 MW for pre-leasing (9 MW in Q4 2026, 9 MW in 2027); SDC Seattle 3.5 MW now and 12 MW in 2027; SDC Manhattan 755 kW; SDC Ashburn 14 MW by Q3 2026; SDC Austin 18 MW (Q4 2027 and Q1 2028); SDC Umatilla 120 MW for pre-leasing, first 12 MW by 2027.
- Construction of SDC Austin Building B (54 MW total, six 30,000 square foot data halls, onsite substation) reached a near-complete shell; the first 18 MW is on track for delivery in late 2027.
Company details checked against company and official sources, 6 Nov 2026.
- Capacity under construction or planned (228 MW) is 0.9 times the operational base of 265 MW.
- Its largest operational site is Sabey SDC Quincy (Intergate.Quincy) in Quincy, United States at 123 MW.
- The largest project in the pipeline is Sabey SDC Umatilla (120 MW, under construction).
- 4 facilities publish a PUE figure; the lowest is 1.20 at Sabey SDC Quincy (Intergate.Quincy) (Sabey Data Centers) and the median is 1.20.
- 7 of 11 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Sabey Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 228 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Sabey SDC UmatillaSabey Data Centers | Umatilla, United States | Under construction | Colocation | 120 MW |
| Sabey SDC Ashburn Building ASabey Data Centers | Ashburn, United States | Under construction | Colocation | 54 MW |
| Sabey SDC Austin Building BSabey Data Centers | Round Rock, United States | Under construction | Colocation | 54 MW |
Facilities
11 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Sabey SDC Quincy (Intergate.Quincy)Colocation
Cooling: Evaporative or adiabatic
History
|
Quincy, United States | Operational | 123 MW total | — | Operator / official |
Sabey SDC UmatillaColocation
History
|
Umatilla, United States | Under construction | 120 MW total | — | Operator / official |
Sabey SDC Columbia East WenatcheeColocation
History
|
East Wenatchee, United States | Operational | 70 MW | — | Operator / official |
Sabey SDC Ashburn Building AColocation
History
|
Ashburn, United States | Under construction | 54 MW total | — | Operator / official |
Sabey SDC Austin Building BColocation
History
|
Round Rock, United States | Under construction | 54 MW total | — | Operator / official |
Sabey SDC Seattle (Intergate.Seattle) TukwilaColocation
History
|
Tukwila, United States | Operational | 54 MW total | — | Operator / official |
Sabey SDC Manhattan (Intergate.Manhattan)Colocation
History
|
New York City, United States | Operational | 18 MW total | — | Operator / official |
Sabey Indianapolis Decatur Township campusColocation
History
|
Indianapolis, United States | Planned | — | — | Operator / official |
| Sabey SDC Ashburn Building BColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Sabey SDC Ashburn Building CColocation | Ashburn, United States | Operational | — | — | Operator / official |
Sabey SDC Austin Building AColocation
History
|
Round Rock, United States | Operational | — | 2024 | Operator / official |
Market position
How Sabey Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Sabey Data Centers ranks #25 of 171 tracked operators by capacity, with 0.6% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Ashburn also hosts 10 other tracked data center(s), run by Vantage Data Centers, PowerHouse Data Centers, Cologix and QTS.
- Our Deal Tracker lists 1 deal(s) naming Sabey Data Centers, the latest on 17 November 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Ashburn
- Vantage Ashburn III (VA3) campus · Vantage Data Centers · Planned · 288 MW
- PowerHouse Pacific · PowerHouse Data Centers · Under construction · 265 MW
- Cologix Ashburn Beaumeade land (38 acres) · Cologix · Planned · 85 MW
- QTS Ashburn 3 · QTS · Operational · 80 MW
- PowerHouse ABX-1 · PowerHouse Data Centers · Operational · 60 MW
- Cologix ASH2 Ashburn · Cologix · Under construction · 51 MW
- H5 Ashburn · H5 Data Centers · Under construction · 42 MW
- IAD3 Ashburn Campus Data Center · DataBank · Operational · 40 MW
- NTT DATA Ashburn VA7 · NTT DATA · Planned · 36 MW
- Centersquare Ashburn IAD4 · Centersquare · Operational · 35.8 MW
Deals naming Sabey Data Centers
- Sabey Data Centers → Greasewood solar project (operating), 43.5 MW, Texas Power deal
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Sabey Data Centers operate?
DC Market Insights tracks 11 Sabey Data Centers data center(s) in 1 country as of November 2026: 7 operational, 3 under construction and 1 planned.
Where is Sabey Data Centers headquartered?
Sabey Data Centers is headquartered in Seattle, United States. Ownership: JV of Sabey Corporation and National Real Estate Advisors; Ares minority stake.
Which other companies operate data centers in United States?
Besides Sabey Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Ashburn?
Other tracked data centers in Ashburn include Vantage Ashburn III (VA3) campus (Vantage Data Centers), PowerHouse Pacific (PowerHouse Data Centers), Cologix Ashburn Beaumeade land (38 acres) (Cologix) and QTS Ashburn 3 (QTS).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.