Compass Datacenters Data Centers
Data centers operated by Compass Datacenters that we have verified: location, status and capacity, each checked against its source.
In short
As of 5 November 2026, DC Market Insights tracks 10 data centers operated by Compass Datacenters in 3 countries, of which 4 are operational. Stated operational capacity is 480 MW, with a further 532 MW under construction and 356 MW planned. The pipeline is 1.9 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 9 of 10 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Compass Datacenters data centers: key facts
About Compass Datacenters
Compass Datacenters is a Dallas-based developer and operator of single-tenant hyperscale and cloud data center campuses. Its markets page (Nov 2026) lists seven active campus markets: Chicago (200 MW, Hoffman Estates), Meridian, Mississippi (320 MW), Dallas-Fort Worth (360 MW Red Oak), Northern Virginia (79 MW, Loudoun County), Phoenix (212 MW Goodyear and 108 MW El Mirage), Toronto and Milan. The company is backed by Ontario Teachers' Pension Plan, Brookfield Infrastructure and KKR.
- Headquarters
- Dallas, United States
- Ownership
- Private; backed by Ontario Teachers' Pension Plan, Brookfield Infrastructure and KKR
- Tracked footprint
- 10 facilities in 3 countries
- Website
- compassdatacenters.com
Data center business
- The Meridian, Mississippi campus will have eight data centers built over eight years, a $10 billion investment at full fit-out including tenant IT equipment; Mississippi Power will supply about 500 MW.
- The Hoffman Estates campus is on the nearly 200-acre former Sears headquarters site, bought in September 2023. Compass plans five hyperscale data centers there, about $10 billion of local investment once operational.
- Brookfield Infrastructure and existing investor Ontario Teachers' agreed to acquire Compass Datacenters, LLC from RedBird Capital Partners and the Azrieli Group; founder and CEO Chris Crosby continued to lead the company.
- Compass entered Europe in a joint venture with Hines, buying a 2.3 million sq ft site in Noviglio, Milan metro area, to support 48 MW+ of IT load.
- Compass bought land for its first Toronto campus in Etobicoke, 15 km from 151 Front Street; the first building was planned to support 30 MW of critical IT load in a $100 million phase one.
- Compass develops and operates Class A, Community-First campuses for cloud and hyperscale customers, built with an industrialized, prefabricated design and hybrid cooling that uses no water during operations. It says it builds every campus as a 100-year asset that it owns and operates itself.
- Active campus markets (company markets page): a 200 MW campus in Hoffman Estates, about 30 miles west of Chicago; a 320 MW site in Meridian, Mississippi that broke ground in 2025; the 360 MW Red Oak development near Dallas, nearing completion; a 79 MW hyperscale campus in Loudoun County, Virginia; a 212 MW campus in Goodyear and a 108 MW campus in El Mirage near Phoenix; a hyperscale campus in the Greater Toronto Area; and a hyperscale campus being established in Milan.
- Compass also lists earlier projects that are now independently owned and operated: a customer-owned data center near Boston, two customer-owned data centers in Columbus, a data center in Shakopee near Minneapolis, two campus locations near Montreal, a 14-acre campus in Franklin near Nashville, a fully leased campus in Raleigh, multiple data centers near Tel Aviv and a five-acre campus in Tulsa.
Recent updates
- Compass funded a $50,000 community wellness space at the Village of Hoffman Estates Health and Human Services Department, where it is developing a hyperscale campus on the former Sears headquarters site.
- Compass is funding a shade structure at the Northwest Valley Family YMCA in El Mirage, Arizona, where it is developing a campus.
- Compass and Meridian Community College launched Mississippi's first MEI Data Center Pathway training program, tied to the $10 billion Meridian campus.
- Compass donated a $12.6 million, 40,000 sq ft training building at its Red Oak, Texas campus to Texas State Technical College; once complete, the Red Oak campus will host a workforce of more than 400.
- Compass and Ellis County announced a proposed $15 million grant to build a county animal shelter; construction of the Red Oak campus began more than six years earlier.
- Compass said it cannot move forward with the Prince William Digital Gateway project in Virginia after legal actions and regulatory hurdles.
Company details checked against company and official sources, 5 Nov 2026.
- Capacity under construction or planned (888 MW) is 1.9 times the operational base of 480 MW.
- Its largest operational site is Compass Red Oak Campus in Red Oak, United States at 360 MW.
- The largest project in the pipeline is Meridian campus by Compass Datacenters (320 MW, under construction).
- United States accounts for 94% of tracked capacity (8 facilities).
- 9 of 10 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Compass Datacenters development pipeline
Under construction and planned facilities with a stated capacity, largest first. 532 MW under construction and 356 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Meridian campusCompass Datacenters | Meridian, United States | Under construction | Hyperscale | 320 MW |
| Compass Goodyear campusCompass Datacenters | Goodyear, United States | Under construction | Hyperscale | 212 MW |
| Compass Hoffman Estates CampusCompass Datacenters | Hoffman Estates, United States | Planned | Hyperscale | 200 MW |
| Compass El Mirage campusCompass Datacenters | El Mirage, United States | Planned | Hyperscale | 108 MW |
| Compass Milan campus (Noviglio)Compass Datacenters | Noviglio, Italy | Planned | Hyperscale | 48 MW |
Facilities
10 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Compass Red Oak CampusHyperscale
History
|
Red Oak, United States | Operational | 360 MW | — | Operator / official |
Meridian campusHyperscale
Cooling: Hybrid
History
|
Meridian, United States | Under construction | 320 MW total | — | Operator / official |
| Compass Goodyear campusHyperscale | Goodyear, United States | Under construction | 212 MW | — | Operator / official |
Compass Hoffman Estates CampusHyperscale
History
|
Hoffman Estates, United States | Planned | 200 MW | — | Operator / official |
Compass El Mirage campusHyperscale
History
|
El Mirage, United States | Planned | 108 MW | — | Operator / official |
Compass Northern Virginia Campus (Loudoun County)Hyperscale
History
|
United States | Operational | 79 MW | — | Operator / official |
Compass Milan campus (Noviglio)Hyperscale
History
|
Noviglio, Italy | Planned | 48 MW IT | — | Operator / official |
Compass Toronto campus (Etobicoke)Hyperscale
History
|
Toronto, Canada | Operational | 30 MW IT | — | Operator / official |
| Compass DFW AllenHyperscale | Allen, United States | Operational | 10.8 MW IT | — | Operator / official |
| Statesville campus (Stamey Farm)Hyperscale | Statesville, United States | Planned | — | — | Trade press |
Market position
How Compass Datacenters compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Compass Datacenters ranks #14 of 171 tracked operators by capacity, with 1.7% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Canada, Compass Datacenters ranks #11 of 18 tracked operators by capacity, with 0.3% of the country’s tracked MW.
- In Italy, Compass Datacenters ranks #6 of 7 tracked operators by capacity, with 5.6% of the country’s tracked MW.
- Red Oak also hosts 7 other tracked data center(s), run by PowerHouse Data Centers, DataBank, Google and Lincoln Property Company.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Canada
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| O'Leary Ventures | 1 | — | 7,500 MW |
| Meta | 1 | — | 1,000 MW |
| Beacon AI Centers | 1 | — | 920 MW |
| Bell Canada | 2 | — | 300 MW |
| eStruxture | 16 | 148 MW | 90 MW |
| Vantage Data Centers | 4 | 127 MW | — |
| Cologix | 23 | 86.4 MW | — |
| QScale | 2 | — | 60 MW |
All data centers in Canada Power and policy in Canada
Data center operators in Italy
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Data4 | 2 | 170 MW | 100 MW |
| CloudHQ | 1 | — | 240 MW |
| NTT DATA | 1 | — | 128 MW |
| Vantage Data Centers | 2 | — | 96 MW |
| CyrusOne | 2 | — | 81 MW |
| QTS | 1 | — | — |
All data centers in Italy Power and policy in Italy
Other data centers in Red Oak
- PowerHouse Red Oak · PowerHouse Data Centers · Planned · 150 MW
- DataBank DFW10 Red Oak · DataBank · Planned · 60 MW
- DataBank DFW11 Red Oak · DataBank · Planned · 60 MW
- DataBank DFW12 Red Oak · DataBank · Planned · 60 MW
- DataBank DFW9 Red Oak · DataBank · Under construction · 60 MW
- Google Red Oak · Google · Under construction
- Lincoln Red Oak Campus · Lincoln Property Company · Planned
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Compass Datacenters operate?
DC Market Insights tracks 10 Compass Datacenters data center(s) in 3 countries as of November 2026: 4 operational, 2 under construction and 4 planned.
Where is Compass Datacenters headquartered?
Compass Datacenters is headquartered in Dallas, United States. Ownership: Private; backed by Ontario Teachers' Pension Plan, Brookfield Infrastructure and KKR.
Which other companies operate data centers in United States?
Besides Compass Datacenters, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Red Oak?
Other tracked data centers in Red Oak include PowerHouse Red Oak (PowerHouse Data Centers), DataBank DFW10 Red Oak (DataBank), DataBank DFW11 Red Oak (DataBank) and DataBank DFW12 Red Oak (DataBank).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.