Proprietary data

Kolo Data Centers

Data centers operated by Kolo that we have verified: location, status and capacity, each checked against its source.

In short

As of 9 November 2026, DC Market Insights tracks 12 data centers operated by Kolo in 3 countries, of which 12 are operational.

12Facilities tracked
3Countries
—Operational (12 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 12 facilities have a stated capacity; the others are counted as sites only.

Kolo NL1 Dronten · Kolo · Dronten (approximate location)Kolo NL2 Meppel · Kolo · Meppel (approximate location)Kolo NL3 Apeldoorn · Kolo · Apeldoorn (approximate location)Kolo NL4 Amsterdam · Kolo · Schiphol-Rijk (approximate location)Kolo DK1 Skanderborg · Kolo · Skanderborg (approximate location)Kolo DK2 Aarhus · Kolo · Aarhus (approximate location)Kolo DK3 Randers · Kolo · Randers (approximate location)Kolo DK4 Viby J · Kolo · Viby J (approximate location)Kolo DK5 Copenhagen · Kolo · Copenhagen (approximate location)Kolo SE1 Atlas Stockholm · Kolo · Stockholm (approximate location)Kolo SE2 Tellus Stockholm · Kolo · Stockholm (approximate location)Kolo SE3 Piteå · Kolo · Piteå (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Kolo data centers: key facts

About Kolo

Kolo (Kolo DC) is a Northern European colocation platform backed by CapMan Infra. It states that it operates 12 data centers across the Netherlands, Denmark and Sweden: four in the Netherlands (Dronten, Meppel, Apeldoorn, Schiphol-Rijk near Amsterdam, ex-Serverius), five in Denmark (Skanderborg, Aarhus, Randers, Viby J and Copenhagen, ex-Fuzion) and three in Sweden (two in Stockholm and one in Piteå, bought from EcoDataCenter in 2025). Its headquarters are in Luxembourg.

Headquarters
Luxembourg, Luxembourg
Ownership
Private; backed by CapMan Infra (shareholder and investor)
Parent company
CapMan Infra
Tracked footprint
12 facilities in 3 countries
Website
kolodc.com

Data center business

  • Kolo says it operates 12 data centers across the Netherlands, Denmark and Sweden and sells colocation, connectivity and interconnection, hybrid cloud, disaster recovery, EMP-secure colocation and AI-ready high-density infrastructure. Serverius (Netherlands) and Fuzion (Denmark) now trade under the Kolo name, with the same sites, teams and contracts.
  • The platform was formed by CapMan Infra: Serverius in the Netherlands and Fuzion in Denmark joined in 2023, and in 2025 Kolo entered Sweden by acquiring three EcoDataCenter sites. Kolo is backed by CapMan Infra, part of the Nasdaq Helsinki-listed CapMan group.
  • Netherlands sites: NL1 Dronten (De Linge 26, PUE 1.35), NL2 Meppel (Ketelskamp 10), NL3 Apeldoorn (Laan van de Ram 39) and NL4 Amsterdam (Capronilaan 2, Schiphol-Rijk, about 5 km from Schiphol Airport with access to AMS-IX). The Dutch operating company is Serverius B.V. (KvK 34367179).
  • Denmark sites: DK1 Skanderborg (Niels Bohrs Vej 35, Tier III design, PUE 1.35), DK2 Aarhus (Silkeborgvej 53, PUE 1.4), DK3 Randers (Normansvej 1, PUE 1.42, disaster recovery focus), DK4 Viby J (Søndervangs Alle 20, PUE 1.4) and DK5 Copenhagen (Bygmestervej 10, a retrofit site with up to 40 kW per cabinet). The Danish operating company is Fuzion A/S (CVR 25780582).
  • Sweden sites: SE1 Atlas and SE2 Tellus in Stockholm, about 10 km apart and run as twin sites with N+N power and heat recovery into district heating, and SE3 Piteå in Norrbotten, about 850 km north of Stockholm, on 100% hydropower with free cooling about 65% of the year and optional EMP protection. The Swedish company is KDC Sweden BidCo (org. nr 559522-0590).
  • Kolo says its sites support racks of up to 50 kW with climate-optimised cooling, use 100% renewable energy at the Swedish and Danish sites, and reuse heat in Stockholm and other locations. It does not publish MW capacity per site.

Recent updates

  • 29 Sep 2026: Kolo renewed its ISO 9001, ISO 14001 and ISO 27001 certifications for its operations in Sweden, the Netherlands and Denmark after a full recertification audit; the certificates run for another three years.
  • 3 Sep 2026: Kolo appointed Rogier van der Wal, formerly with Interxion and Digital Realty, to the new role of Chief Revenue Officer to lead sales and marketing; the release says Kolo is headquartered in Luxembourg and backed by CapMan Infra.
  • 21 May 2026: Kolo launched Kolo Konnect in Denmark, combining peering with 320+ networks through the Speed-IX community, DDoS protection, a 24/7 NOC and colocation; it went live at DK5 Copenhagen, DK2 Aarhus and DK1 Skanderborg.
  • 28 Apr 2025: CapMan Infra's data centre platform, to be renamed Kolo DC, agreed to buy two Stockholm data centres and one in Piteå from EcoDataCenter, with Tier 3 equivalent redundancy and district heating links; closing was expected in Q2 2025.

Company details checked against company and official sources, 9 Nov 2026.

  • Denmark accounts for 0% of tracked capacity (5 facilities).
  • 5 facilities publish a PUE figure; the lowest is 1.35 at Kolo DK1 Skanderborg (Kolo) and the median is 1.40.
  • 0 of 12 facilities have a capacity stated by their source; the totals above count only those.

Facilities

12 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Kolo DK1 SkanderborgColocation Skanderborg, Denmark Operational — — Operator / official
Kolo DK2 AarhusColocation Aarhus, Denmark Operational — — Operator / official
Kolo DK3 RandersColocation Randers, Denmark Operational — — Operator / official
Kolo DK4 Viby JColocation Viby J, Denmark Operational — — Operator / official
Kolo DK5 CopenhagenColocation Copenhagen, Denmark Operational — — Operator / official
Kolo NL1 DrontenColocation Dronten, Netherlands Operational — — Operator / official
Kolo NL2 MeppelColocation Meppel, Netherlands Operational — — Operator / official
Kolo NL3 ApeldoornColocation Apeldoorn, Netherlands Operational — — Operator / official
Kolo NL4 AmsterdamColocation Schiphol-Rijk, Netherlands Operational — — Operator / official
Kolo SE1 Atlas StockholmColocation
History
  1. Operational
  2. Operational
Stockholm, Sweden Operational — — Operator / official
Kolo SE2 Tellus StockholmColocation
History
  1. Operational
  2. Operational
Stockholm, Sweden Operational — — Operator / official
Kolo SE3 PiteåColocation
History
  1. Operational
  2. Operational
Piteå, Sweden Operational — — Operator / official

Market position

How Kolo compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Denmark, Kolo is one of 14 operators we track.
  • Denmark has 30 tracked data centers from 14 operators: 54.6 MW operational and 844 MW under construction or planned.
  • Industrial electricity in Denmark costs 134 USD/MWh (2025, latest official figure).
  • In Netherlands, Kolo is one of 33 operators we track.
  • In Sweden, Kolo is one of 17 operators we track.

Data center operators in Denmark

Tracked facilities3014 operators
Operational capacity54.6 MW844 MW in the pipeline
Kolo rank by capacity#9of 14 operators
Industrial power price134 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
GARBE Data Centers1—350 MW
atNorth230 MW250 MW
Prime Data Centers1—160 MW
STACK Infrastructure1—72 MW
Digital Realty423 MW—
Thylander1—11.5 MW
Penta Infra11.6 MW—
Microsoft5——

All data centers in Denmark Power and policy in Denmark

Data center operators in Netherlands

Tracked facilities10833 operators
Operational capacity217 MW414 MW in the pipeline
Kolo rank by capacity#18of 33 operators
Industrial power price148 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
EdgeConneX440 MW162 MW
CloudHQ1—84 MW
Pure DC1—78 MW
Digital Realty13—70 MW
NorthC1457 MW—
CyrusOne154 MW—
Iron Mountain213.1 MW20 MW
NTT DATA120.7 MW—

All data centers in Netherlands Power and policy in Netherlands

Data center operators in Sweden

Tracked facilities4117 operators
Operational capacity172 MW1,510 MW in the pipeline
Kolo rank by capacity#12of 17 operators
Industrial power price78.5 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Brookfield1—750 MW
EcoDataCenter380 MW400 MW
atNorth312 MW330 MW
Conapto439 MW—
Hydro66119.2 MW—
STACK Infrastructure118 MW—
evroc1—18 MW
Bahnhof6—12 MW

All data centers in Sweden Power and policy in Sweden

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Kolo operate?

DC Market Insights tracks 12 Kolo data center(s) in 3 countries as of November 2026: 12 operational, 0 under construction and 0 planned.

Where is Kolo headquartered?

Kolo is headquartered in Luxembourg, Luxembourg. Ownership: Private; backed by CapMan Infra (shareholder and investor).

Which other companies operate data centers in Denmark?

Besides Kolo, the largest operators we track in Denmark by capacity are GARBE Data Centers, atNorth, Prime Data Centers, STACK Infrastructure and Digital Realty. The Denmark page lists all 14 operators.

What rules apply to data centers in Denmark?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Denmark, including 1 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst