Proprietary data
Stream Data Centers Data Centers
Data centers operated by Stream Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 October 2026, DC Market Insights tracks 10 data centers operated by Stream Data Centers in 1 country, of which 5 are operational. Stated operational capacity is 31 MW, with a further 40 MW under construction and — planned. The pipeline is 1.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 10 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Stream Data Centers data centers: key facts
About Stream Data Centers
Stream Data Centers develops and operates wholesale, powered shell and build-to-suit data center facilities in the United States, with featured markets in Atlanta, Dallas-Fort Worth, Phoenix, San Antonio and Chicago. Its website states more than 27 data center developments delivered across the U.S., as stated on its website in October 2026.
- Headquarters
- Dallas, United States
- Founded
- 1999
- Ownership
- Owned by Apollo funds (majority); Principal and management hold minority stakes
- Tracked footprint
- 10 facilities in 1 country
- Website
- streamdatacenters.com
Data center business
- In August 2026 Stream said it has 27 years of operation, including 13 data center campuses delivered in Texas.
- When Apollo funds completed their acquisition in November 2025, Stream said it would execute on a 4+ gigawatt pipeline and had delivered more than 20 campuses for large hyperscale and enterprise customers, mainly in Tier 1 data center markets.
- From site selection through construction and operations, Stream develops wholesale colocation capacity and build-to-suit facilities for hyperscale and enterprise users in major markets across the United States.
- Stream says over 90% of its inventory is leased to Fortune 100 customers, and that it develops hyperscale facilities and land sites in markets including Dallas, Phoenix, Chicago, San Antonio and Atlanta.
Recent updates
- 10 Aug 2026: Stream Data Centers appointed Nikki Kresse as Chief Human Resources Officer.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (40 MW) is 1.3 times the operational base of 31 MW.
- Its largest operational site is Stream Chicago I (ORDA) in Elk Grove Village, United States at 31 MW.
- The largest project in the pipeline is Stream Chicago III (ORDC) Building 1 (40 MW, under construction).
- By type, the tracker lists 9 hyperscale and 1 colocation facilities.
- 2 of 10 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Stream Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 40 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Stream Chicago III (ORDC) Building 1Stream Data Centers | Elk Grove Village, United States | Under construction | Hyperscale | 40 MW |
Facilities
10 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Stream Chicago III (ORDC) Building 1Hyperscale | Elk Grove Village, United States | Under construction | 40 MW IT | — | Operator / official |
| Stream Chicago I (ORDA)Hyperscale | Elk Grove Village, United States | Operational | 31 MW total | — | Operator / official |
| STAMP data center campusHyperscale | United States | Planned | — | — | Trade press |
| Stream Chicago II (ORDB)Hyperscale | Elk Grove Village, United States | Operational | — | — | Operator / official |
Stream DFWA GarlandHyperscale
History
|
Garland, United States | Operational | — | — | Operator / official |
| Stream DFWB WilmerHyperscale | Wilmer, United States | Under construction | — | — | Operator / official |
| Stream DFWC (Wilmer II)Hyperscale | Wilmer, United States | Under construction | — | — | Operator / official |
| Stream PHXA GoodyearHyperscale | Goodyear, United States | Operational | — | — | Operator / official |
| Stream SATA1 San Antonio IIColocation | San Antonio, United States | Operational | — | — | Operator / official |
| Stream SATB1 San Antonio IIIHyperscale | San Antonio, United States | Under construction | — | — | Operator / official |
Market position
How Stream Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Stream Data Centers ranks #46 of 171 tracked operators by capacity, with 0.1% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- Elk Grove Village also hosts 10 other tracked data center(s), run by Prime Data Centers, Rackspace, STACK Infrastructure and T5 Data Centers.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Other data centers in Elk Grove Village
- Prime ORD01-01 · Prime Data Centers · Operational · 72 MW
- Rackspace Chicago ORD1 · Rackspace · Operational · 56 MW
- Prime ORD01-02 · Prime Data Centers · Planned · 54 MW
- Prime ORD01-03 · Prime Data Centers · Planned · 54 MW
- STACK CHI01 · STACK Infrastructure · Operational · 40 MW
- STACK CHI02 · STACK Infrastructure · Planned · 36 MW
- T5 CHI V · T5 Data Centers · Planned · 36 MW
- Centersquare ORD2 · Centersquare · Operational · 25.9 MW
- Aligned ORD-03 · Aligned Data Centers · Planned
- Digital Realty Chicago CH1 · Digital Realty · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Stream Data Centers operate?
DC Market Insights tracks 10 Stream Data Centers data center(s) in 1 country as of October 2026: 5 operational, 4 under construction and 1 planned.
Where is Stream Data Centers headquartered?
Stream Data Centers is headquartered in Dallas, United States. Ownership: Owned by Apollo funds (majority); Principal and management hold minority stakes.
Which other companies operate data centers in United States?
Besides Stream Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Elk Grove Village?
Other tracked data centers in Elk Grove Village include Prime ORD01-01 (Prime Data Centers), Rackspace Chicago ORD1 (Rackspace), Prime ORD01-02 (Prime Data Centers) and Prime ORD01-03 (Prime Data Centers).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.