Data Center Power & Policy in Singapore

Every government action on data centers and power in Singapore that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 15 November 2026, DC Market Insights tracks 16 government actions on data centers and power in Singapore, 6 of them in force. Singapore has 1 restriction on new data centers in force: Central land-use planning and industrial-estate siting for data centres.

16Actions tracked
6In force
189 USD/MWhIndustrial power price
2.1%Renewable share of generation

Market snapshot

Singapore power and policy: key facts

  • Industrial electricity price: 189 USD/MWh (2025). Rank 4 of 30 tracked countries, highest first.
  • Renewable share of electricity generation: 2.1% (2024). Rank 41 of 42 tracked countries, highest first.
  • Grid emission factor: 0.40 kgCO2/kWh (2024). Rank 13 of 36 tracked countries, highest first.
  • Latest change: Five-Year Energy Infrastructure Plan to Meet Unprecedented Future Demand (Energy Market Authority (EMA), 26 Oct 2026).
  • By type: 4 plan or strategy, 4 restriction, 4 efficiency rule and 2 regulation.

Power indicators for Singapore

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 189 USD/MWh 2025 · SP Group regulated High Tension Large tariff, peak period (7am-11pm) energy charge 24.70 SGD cents/kWh (excl. GST) = SGD 247.0/MWh; converted at 2025 average 1.3066 SGD/USD (SingStat/MAS). Excludes capacity charges; most large users are contestable and bu 2024: 201 USD/MWh Singapore Department of Statistics (SingStat), source SP Group, via data.gov.sg
Renewable share of electricity generation 2.1% 2024 · Solar PV share of electricity generation by fuel, SES 2025 Ch.2; excludes renewable portion of 'Other Energy Products' (2.7%, incl. waste-to-energy), natural gas 94.0% Energy Market Authority
Grid emission factor 0.40 kgCO2/kWh 2024 · Singapore Energy Statistics 2025, Ch.2 average operating grid emission factor (kg CO2/kWh) 2023: 0.41 kgCO2/kWh Energy Market Authority
Peak electricity demand 8.19 GW 2025 · Actual system peak demand 8,189 MW recorded Jul 2025, EMA Electricity Demand and Supply Outlook 2025 (28 Nov 2025) Energy Market Authority
Installed generation capacity 12.4 GW 2024 · Total installed generation capacity 12,445 MW, SES 2025 Ch.2 (1H 2025: 13,261 MW) 2023: 13.1 GW Energy Market Authority

In force now in Singapore

Restriction (1)

  • RestrictionIn force

    Central land-use planning and industrial-estate siting for data centres

    MDDI said land use for data centres is centrally planned with the Urban Redevelopment Authority and JTC, and that all data centres sit in industrial estates. Industrial estates must be sufficiently separated from residential communities, and DCs must follow the rules for industrial premises on noise, water and air pollution. The latest such site is the purpose-built Data Centre Park on Jurong Island.

    Ministry of Digital Development and Information (MDDI); Urban Redevelopment Authority (URA); JTC Corporation · MDDI: Closing Speech by SMS Tan Kiat How for the Second Reading of the Digital Infrastructure Bill

Efficiency rule (4)

  • Efficiency ruleIn force

    SS 726:2026 Liquid Cooling in Tropical Data Centres

    Singapore Standard launched 27 Aug 2026, jointly developed by IMDA and Enterprise Singapore through the Singapore Standards Council, to help data centres adopt liquid cooling technologies in the tropics in response to AI workload energy demands.

    IMDA and Enterprise Singapore (Singapore Standards Council) · Enterprise Singapore

  • Efficiency ruleIn force

    SS 715:2025 Energy Efficiency of Data Centre IT Equipment

    Singapore Standard launched 13 Aug 2025 setting out selection and operation of IT equipment for efficiency; aims to save IT equipment energy consumption in DCs by at least 30%, with IT equipment able to operate safely at up to 35°C. Complements the Tropical Data Centre standard SS 697:2023. The release does not state whether adoption is mandatory.

    30 % IT energy saving target (at least)

    Infocomm Media Development Authority (IMDA) · Infocomm Media Development Authority

  • Efficiency ruleIn force

    BCA-IMDA Green Mark for Data Centre 2024 criteria (GMDC: 2024)

    BCA and IMDA launched the Green Mark for Data Centre 2024 criteria on 18 Oct 2024, a significant update to the GMDC: 2019 criteria, with main emphasis on energy efficiency in DC operations plus intelligent systems, carbon reduction, health and well-being, resilience and maintainability.

    Building and Construction Authority (BCA) and IMDA

  • Efficiency ruleIn force

    Singapore Standard SS 564 Green Data Centres – Energy and environmental management systems

    Singapore Standard for energy and environmental management systems in data centres, modelled on ISO 50001. First published in January 2011; revised as SS 564 Part 1 in 2013, with SS 564 Part 2 (guidelines) issued the same year. The IMDA page does not state whether adoption is mandatory. (source gives month only)

    Infocomm Media Development Authority (IMDA) / Singapore Standards Council · Infocomm Media Development Authority

Plan or strategy (1)

  • Plan or strategyIn force

    Green Data Centre Roadmap: Charting green growth for data centres in Singapore

    IMDA roadmap issued 30 May 2024 to provide at least 300 MW of additional DC capacity in the near term, with more via green energy deployments. Pushes DCs to PUE of 1.3 or lower, refresh of BCA-IMDA Green Mark for DCs by end-2024, standards for IT equipment energy efficiency and liquid cooling by 2025, the Tropical DC methodology, and grants (EDB Resource Efficiency Grant for Emissions, Energy Efficiency Grant for DCs).

    300 MW additional capacity (at least) near-term additional DC capacity

    Infocomm Media Development Authority (IMDA) · Infocomm Media Development Authority

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Plan or strategyAnnounced

    Five-Year Energy Infrastructure Plan to Meet Unprecedented Future Demand

    EMA's five-year Energy Infrastructure Plan covers generation, natural gas, grid, solar, storage and low-carbon imports. EMA says demand growth will come mainly from energy-intensive sectors such as semiconductor manufacturing and data centres, plus electric transport. Grid spending will pay for new transmission substations, a larger transmission cable network and a stronger distribution network.

    5.3 billion ($) Projected grid expansion investment from 2025 to 2029, as stated by EMA.

    Energy Market Authority (EMA) · EMA media release: Five-Year Energy Infrastructure Plan to Meet Unprecedented Future Demand

  • OtherAnnounced

    Government rejects an arbitrary cap on data centre capacity

    In Parliament, the Senior Minister of State rejected MPs' suggestions to cap data centre capacity, saying a cap would constrain the wider economy. The government instead keeps allocating new capacity selectively through the Data Centre Call for Application and the Jurong Island park, and manages growth through efficiency standards and green-energy conditions. He recalled that new capacity was paused in 2019 and has been allocated through calls since 2022.

    Ministry of Digital Development and Information (MDDI) · MDDI: Closing Speech by SMS Tan Kiat How for the Second Reading of the Digital Infrastructure Bill

  • RegulationAnnounced

    Digital Infrastructure Bill: licensing regime for security and resilience of major DCs and cloud service providers

    The Bill sets up an IMDA licence for major co-location and cloud data centres above a critical IT load threshold, and for major IaaS/PaaS cloud providers. Licensees must put in place security risk management, business continuity and disaster recovery plans, and must report specified incidents and disruptions to IMDA. DCs used only for the operator's own internal purposes are not covered.

    10 MW critical IT load

    Ministry of Digital Development and Information (MDDI); Infocomm Media Development Authority (IMDA) · MDDI press release: New Digital Infrastructure Bill To Strengthen The Foundations For Singapore's Digital Economy

  • RegulationAnnounced

    Digital Infrastructure Bill: licensing regime for environmental sustainability of DC operations

    The Digital Infrastructure Bill, introduced for First Reading on 8 September 2026, sets up an IMDA licence for data centre operators above a critical IT load threshold. Licensed DCs, existing and new, must meet facility-level energy-efficiency requirements, including PUE. IT-equipment and water-efficiency requirements may follow after industry consultation. Passage on 7 October 2026 is reported by a secondary source. MDDI expects the Act to come into force in 2027.

    3 MW critical IT load PUE levels are not set in the Bill; they will be set in later regulations or Codes of Practice.

    Ministry of Digital Development and Information (MDDI); Infocomm Media Development Authority (IMDA) · MDDI press release: New Digital Infrastructure Bill To Strengthen The Foundations For Singapore's Digital Economy

  • Plan or strategyAnnounced

    Review of the need for a further Data Centre Call for Application

    After the DC-CFA2 awards, EDB and IMDA said they will keep engaging industry and will review whether another Call for Application is needed. No further capacity round has been committed. New data centre capacity in Singapore keeps being released only through these selective calls.

    Singapore Economic Development Board (EDB); Infocomm Media Development Authority (IMDA) · Singapore Economic Development Board (EDB) and IMDA fact sheet: Four data centre proposals selected as part of second Data Centre – Call for Application

  • Plan or strategyAnnounced

    Singapore’s largest low carbon Data Centre Park on Jurong Island

    JTC and EDB set aside land on Jurong Island for Singapore's largest data centre park. Operators can use shared energy storage, utilities and emerging low-carbon energy sources there. New data centres must meet efficiency standards, adopt advanced cooling and tap renewable energy, in line with the 2024 Green Data Centre Roadmap. DC-CFA2 awardees are to locate there, so the park works as the designated site for newly allocated capacity.

    700 MW MDDI later said in Parliament (7 Oct 2026) that the park's figure refers to total electricity consumption, IT plus facility loads, not IT load.

    JTC Corporation; Singapore Economic Development Board (EDB) · JTC press release: Jurong Island celebrates 25 years with new focus on powering the future of low-carbon innovation in Energy and Chemicals

Timeline of data center and power policy in Singapore

DateActionTypeStatusAuthority
26 Oct 2026Five-Year Energy Infrastructure Plan to Meet Unprecedented Future DemandPlan or strategyAnnouncedEnergy Market Authority (EMA)
7 Oct 2026Central land-use planning and industrial-estate siting for data centresRestrictionIn forceMinistry of Digital Development and Information (MDDI); Urban Redevelopment Authority (URA); JTC Corporation
7 Oct 2026Government rejects an arbitrary cap on data centre capacityOtherAnnouncedMinistry of Digital Development and Information (MDDI)
8 Sep 2026Digital Infrastructure Bill: licensing regime for security and resilience of major DCs and cloud service providersRegulationAnnouncedMinistry of Digital Development and Information (MDDI); Infocomm Media Development Authority (IMDA)
8 Sep 2026Digital Infrastructure Bill: licensing regime for environmental sustainability of DC operationsRegulationAnnouncedMinistry of Digital Development and Information (MDDI); Infocomm Media Development Authority (IMDA)
27 Aug 2026SS 726:2026 Liquid Cooling in Tropical Data CentresEfficiency ruleIn forceIMDA and Enterprise Singapore (Singapore Standards Council)
21 Aug 2026Review of the need for a further Data Centre Call for ApplicationPlan or strategyAnnouncedSingapore Economic Development Board (EDB); Infocomm Media Development Authority (IMDA)
1 Dec 2025Second Data Centre – Call for Application (DC-CFA2)RestrictionExpiredSingapore Economic Development Board (EDB) and IMDA
27 Oct 2025Singapore’s largest low carbon Data Centre Park on Jurong IslandPlan or strategyAnnouncedJTC Corporation; Singapore Economic Development Board (EDB)
13 Aug 2025SS 715:2025 Energy Efficiency of Data Centre IT EquipmentEfficiency ruleIn forceInfocomm Media Development Authority (IMDA)
18 Oct 2024BCA-IMDA Green Mark for Data Centre 2024 criteria (GMDC: 2024)Efficiency ruleIn forceBuilding and Construction Authority (BCA) and IMDA
30 May 2024Green Data Centre Roadmap: Charting green growth for data centres in SingaporePlan or strategyIn forceInfocomm Media Development Authority (IMDA)
14 Jul 2023Four data centre proposals selected as part of pilot Data Centre Call for ApplicationRestrictionExpiredSingapore Economic Development Board (EDB) and IMDA
20 Jul 2022Pilot Data Centre – Call for Application (DC-CFA) to support sustainable growth of data centresRestrictionExpiredSingapore Economic Development Board (EDB) and IMDA
1 Jan 2019Temporary pause on release of State land for data centres and DC development on existing State landMoratoriumExpiredMinistry of Trade and Industry (MTI)
1 Jan 2011Singapore Standard SS 564 Green Data Centres – Energy and environmental management systemsEfficiency ruleIn forceInfocomm Media Development Authority (IMDA) / Singapore Standards Council

How Singapore compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Singapore?

Yes. 1 restriction on new data centers is in force in Singapore: Central land-use planning and industrial-estate siting for data centres.

What does electricity cost for data centers in Singapore?

The industrial electricity price in Singapore was 189 USD/MWh in 2025 (SP Group regulated High Tension Large tariff, peak period (7am-11pm) energy charge 24.70 SGD cents/kWh (excl. GST) = SGD 247.0/MWh; converted at 2025 average 1.3066 SGD/USD (SingStat/MAS). Excludes capacity charges; most large users are contestable and bu). Data center contracts can differ by voltage level, contract length and location.

How much of Singapore’s electricity is renewable?

Renewables supplied 2.1% of electricity generation in Singapore in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity does Singapore have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Singapore capacity