Proprietary data

Data Center Power & Policy in Kyrgyzstan

Every government action on data centers and power in Kyrgyzstan that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 20 October 2026, DC Market Insights tracks 8 government actions on data centers and power in Kyrgyzstan, 8 of them in force. Kyrgyzstan has 1 restriction on new data centers in force: Disconnection of all crypto-mining farms from the grid (winter 2025-26). 1 incentive scheme applies: Law No. 84 On the High Technology Park (edition of 11 Nov 2024).

8Actions tracked
8In force
41.7 USD/MWhIndustrial power price
88%Renewable share of generation

Market snapshot

Kyrgyzstan power and policy: key facts

  • Industrial electricity price: 41.7 USD/MWh (2026). Rank 22 of 22 tracked countries, highest first.
  • Renewable share of electricity generation: 88% (2024). Rank 1 of 33 tracked countries, highest first.
  • Grid emission factor: 0.16 kgCO2/kWh (2019). Rank 20 of 27 tracked countries, highest first.
  • Latest change: Regulator Order No. 103: end-user electricity tariffs from 1 May 2026 (Department for Regulation of the Fuel and Energy Complex under the Ministry of Energy, 24 Apr 2026).
  • By type: 2 power tariff, 2 regulation, 1 moratorium and 1 grid access.

Power indicators for Kyrgyzstan

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 41.7 USD/MWh 2026 · Industrial consumers national tariff 3.65 KGS/kWh excl. taxes from 1 May 2026 (Order No. 103), converted at NBKR official rate 87.45 KGS/USD (21.10.2026): 3.65/87.45 = 0.0417 USD/kWh. Commercial group (incl. computing centers) 4.33 = 49.5 USD/MWh; energy- regultek.gov.kg – Order No. 103 of 24.04.2026
Renewable share of electricity generation 88% 2024 · Hydropower share of electricity generated in 2024 (about 88%); generation 14.7 bn kWh, consumption 18.4 bn kWh, imports 3,841.5 m kWh. Solar is negligible. National Statistical Committee – Production and distribution of electricity in 2024
Grid emission factor 0.16 kgCO2/kWh 2019 · IFI Harmonized Grid Emission Factor data set v2.0 (July 2019): combined margin 156 gCO2/kWh for firm energy (218 for intermittent solar/wind). A project-accounting combined margin, not an average grid intensity; no national average factor found.

In force now in Kyrgyzstan

Moratorium (1)

  • MoratoriumIn force

    Disconnection of all crypto-mining farms from the grid (winter 2025-26)

    Citing the power deficit, the Ministry of Energy decided on 12 Nov 2025 to disconnect all crypto-mining farms in the country, and the national grid company sealed their meters. The ministry said the limits stay until the power system stabilises. No primary text of the decision, or of any lifting, was found (minenergo.gov.kg unreachable).

    Ministry of Energy; National Electric Grid of Kyrgyzstan · Effective 12 Nov 2025

Grid access (1)

  • Grid accessIn force

    State of emergency in the energy sector (Presidential Decree UP No. 178)

    Declares an energy-sector emergency from 1 Aug 2023 to 31 Dec 2026, citing low inflow to the Naryn basin, a shortage of generating capacity and fast demand growth. It gives the Ministry of Energy the right to identify and allocate land suitable for renewables and to fast-track new generation. Large new loads such as data centers face a supply deficit that the country covers with imports.

    President of the Kyrgyz Republic · Effective 1 Aug 2023 · Ends 31 Dec 2026 · CBD – Decree UP No. 178

Power tariff (2)

  • Power tariffIn force

    Regulator Order No. 103: end-user electricity tariffs from 1 May 2026

    The Department for Regulation of the Fuel and Energy Complex set national end-user tariffs from 1 May 2026, excluding taxes: industrial 3.65 KGS/kWh (was 3.34), commercial 4.33, budget 4.62, EV charging 5.99, energy-intensive consumers including crypto mining 6.84 (was 6.06). It replaces Order No. 89 of 29 Apr 2025. A data center billed as commercial pays 4.33 KGS/kWh; one classed as mining pays 6.84.

    6.84 KGS/kWh (energy-intensive group)

    Department for Regulation of the Fuel and Energy Complex under the Ministry of Energy · Effective 1 May 2026 · regultek.gov.kg – Order No. 103 of 24.04.2026

  • Power tariffIn force

    Medium-Term Tariff Policy on electricity 2025-2030 (Cabinet Resolution No. 227 of 24 Apr 2025, as amended to 28 Aug 2026)

    Sets seven national consumer groups with tariffs revised every 1 May to 2030. Crypto mining is placed in the Energy-intensive consumers group with gold mining and alcohol producers, which pays the highest non-household rate (tariff + inflation + 3.5% a year). Computing centers fall in the Commercial group and telecom and internet providers in Industrial. While an energy-intensive facility is under construction it pays the Industrial tariff. There is no data-center-specific tariff and no demand charge: non-household consumers pay a single per-kWh rate.

    6.06 KGS/kWh (energy-intensive group, 2025 ba

    Cabinet of Ministers of the Kyrgyz Republic · Effective 1 May 2025 · Ministry of Justice legal database (CBD), Resolution No. 227, edition 28.08.2026

Incentive (1)

  • IncentiveIn force

    Law No. 84 On the High Technology Park (edition of 11 Nov 2024)

    High Technology Park residents get a special tax regime set in the Tax Code and pay 1% of quarterly revenue to the HTP directorate. Permitted activities are software development, export of IT and software, and interactive service (call) centres; data centers and hosting are not listed explicitly.

    1 % of quarterly revenue (HTP fee)

    Jogorku Kenesh · CBD – Law No. 84 On the High Technology Park

Renewable energy (1)

  • Renewable energyIn force

    Law No. 49 On Renewable Energy Sources (as amended to 3 Apr 2026) and RES ceiling tariff

    Sets an auction mechanism in which bidders compete down from a ceiling tariff, a competitive investor selection procedure, and preferential periods of 15 years for hydro and 25 years for solar, wind, biomass and geothermal. The 2025-2030 tariff policy, as rewritten by Resolution No. 589 of 28 Aug 2026, sets the RES ceiling at 4.42 KGS/kWh (USD 0.05/kWh). Relevant to captive or contracted renewable supply for data centers.

    4.42 KGS/kWh RES ceiling tariff

    Jogorku Kenesh; Cabinet of Ministers · CBD – Law No. 49 On Renewable Energy Sources (edition 03.04.2026)

Regulation (2)

  • RegulationIn force

    Digital Code of the Kyrgyz Republic (No. 178 of 31 Jul 2025): data centers and cross-border personal data

    The Digital Code covers digital technological systems including data centers. It has no general data-localization rule: storage on Kyrgyz territory is required only where the Code says so. Transfers of personal data to countries on the regulator's adequacy list cannot be banned or restricted; transfers elsewhere need consent, a treaty or another legal basis. The State Agency for Personal Data Protection is the regulator. It enters into force six months after publication of enacting Law No. 179 (exact date not stated on the page).

    Jogorku Kenesh; State Agency for Personal Data Protection · State Agency for Personal Data Protection registry – Digital Code

  • RegulationIn force

    Procedure for registering miners and issuing mining certificates (Cabinet Resolution No. 514 of 16 Sep 2022, Annex 4)

    Under the Law on Virtual Assets, industrial and private miners must register in an electronic Register of Miners and hold a certificate, submitting operating rules that cover continuous power supply. Mining in state and municipal buildings, and through unauthorised connection to their power and heat networks, is banned.

    Cabinet of Ministers of the Kyrgyz Republic · CBD – Resolution No. 514, Annex 4 (edition 30.09.2025)

Timeline of data center and power policy in Kyrgyzstan

DateActionTypeStatusAuthority
24 Apr 2026Regulator Order No. 103: end-user electricity tariffs from 1 May 2026Power tariffIn forceDepartment for Regulation of the Fuel and Energy Complex under the Ministry of Energy
12 Nov 2025Disconnection of all crypto-mining farms from the grid (winter 2025-26)MoratoriumIn forceMinistry of Energy; National Electric Grid of Kyrgyzstan
31 Jul 2025Digital Code of the Kyrgyz Republic (No. 178 of 31 Jul 2025): data centers and cross-border personal dataRegulationIn forceJogorku Kenesh; State Agency for Personal Data Protection
24 Apr 2025Medium-Term Tariff Policy on electricity 2025-2030 (Cabinet Resolution No. 227 of 24 Apr 2025, as amended to 28 Aug 2026)Power tariffIn forceCabinet of Ministers of the Kyrgyz Republic
24 Jul 2023State of emergency in the energy sector (Presidential Decree UP No. 178)Grid accessIn forcePresident of the Kyrgyz Republic
16 Sep 2022Procedure for registering miners and issuing mining certificates (Cabinet Resolution No. 514 of 16 Sep 2022, Annex 4)RegulationIn forceCabinet of Ministers of the Kyrgyz Republic
30 Jun 2022Law No. 49 On Renewable Energy Sources (as amended to 3 Apr 2026) and RES ceiling tariffRenewable energyIn forceJogorku Kenesh; Cabinet of Ministers
8 Jul 2011Law No. 84 On the High Technology Park (edition of 11 Nov 2024)IncentiveIn forceJogorku Kenesh

How Kyrgyzstan compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)20
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Peru—62.6% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—00
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10

Questions

Is there a data center moratorium in Kyrgyzstan?

Yes. 1 restriction on new data centers is in force in Kyrgyzstan: Disconnection of all crypto-mining farms from the grid (winter 2025-26).

What incentives does Kyrgyzstan offer data centers?

In force: Law No. 84 On the High Technology Park (edition of 11 Nov 2024). Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Kyrgyzstan?

The industrial electricity price in Kyrgyzstan was 41.7 USD/MWh in 2026 (Industrial consumers national tariff 3.65 KGS/kWh excl. taxes from 1 May 2026 (Order No. 103), converted at NBKR official rate 87.45 KGS/USD (21.10.2026): 3.65/87.45 = 0.0417 USD/kWh. Commercial group (incl. computing centers) 4.33 = 49.5 USD/MWh; energy-). Data center contracts can differ by voltage level, contract length and location.

How much of Kyrgyzstan’s electricity is renewable?

Renewables supplied 88% of electricity generation in Kyrgyzstan in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst