Regional · Forecast 2026-2035

Romania Data Center Infrastructure Market Size, Share & Forecast to 2035

Market at a glance

The Romania Data Center Infrastructure market was worth USD 103.6 million in 2025 and is forecast to reach USD 479.4 million by 2035, growing at a 16.55% CAGR. Bucharest-Ilfov accounts for 53.6% of the market.

$103.6MMarket size, 2025
$479.4MForecast, 2035
16.55%CAGR, 2025-2035
53.6%Bucharest-Ilfov share
Market size, USD million
48.1 2020 103.6 2025 479.4 2035F
Share of market by region
Bucharest-Ilfov53.6%
North-West and West17.4%
South-West Oltenia11.3%
North-East and South-East11.2%
Center6.5%

Source: DC Market Insights analysis

Key players Schneider ElectricVertivEatonABBSiemens +10 more

Key findings

Driver

AI Halls Raise Infrastructure Spend per MW to USD 5.10 Million

Trend

Cooling Rises from 24.8% to 29.3% of Spend

Challenge

Announced Capacity Far Exceeds Built Capacity

Opportunity

Cloud, Hyperscale and AI Data Centers Grow Tenfold by 2035

What is inside the report

  1. 01Introduction
  2. 02Research Methodology
  3. 03Executive Summary
  4. 04Market Dynamics
  5. 05Pricing Analysis
  6. 06Standards and Regulation
  7. 07Supply Chain and Project Delivery
  8. 08Romania Data Center Infrastructure Market Size and Forecast
  9. 09Market by Component
  10. 10Market by Data Center Type
  • 20chapters
  • 2020-2024Historical period
  • 2026-2035Forecast period
  • 15Companies profiled

Full table of contents

Regional insights

  • Bucharest-Ilfov53.6%
  • North-West and West17.4%
  • South-West Oltenia11.3%
  • North-East and South-East11.2%
  • Center6.5%

Segmentation

Component
Power InfrastructureCooling InfrastructureIT Racks and EnclosuresMonitoring and Management (DCIM)
Data Center Type
Colocation Data CentersEnterprise Data CentersCloudHyperscale and AI Data CentersGovernment and Public Sector Data Centers
Tier Type
Tier I and IITier IIITier IV
End-User
IT and TelecomBFSIGovernmentHealthcare
Project Type
New BuildRefresh and Retrofit

Companies profiled

  1. Schneider Electric
  2. Vertiv
  3. Eaton
  4. ABB
  5. Siemens
  6. Legrand
  7. Rittal
  8. Socomec
  9. Riello UPS
  10. STULZ
  11. Huawei Digital Power
  12. Delta Electronics
  13. Cummins
  14. Caterpillar
  15. Tema Energy

Recent developments

August 2025

Tema Energy said a 200 MW data center will be built in western Bucharest, with estimated investment of more than EUR 1.4 billion for the physical infrastructure alone, excluding IT (Source: ZF English article).

December 2025

AIC and ClusterPower announced an equity partnership to co-develop an 800 MW AI data center region in south-western Romania, across the Mischii and Fauresti campuses (Source: Data Center Dynamics article).

March 2026

the head of the National Energy Dispatcher at Transelectrica said investors in data centers of hundreds of MW that have a site and a solution study could receive a technical connection approval within three months at most (Source: Economica.net article).

June 2026

DriverAI announced plans for an 80 MW quantum AI data center in Cluj County, to be built in four 20 MW phases (Source: Data Center Dynamics article).

August 2026

WDP said it is considering two data centers in Ilfov County with a combined 380 MW grid connection agreement already approved, expected to open by 2030 if developed (Source: Data Center Dynamics article).

September 2026

S+B Gruppe secured approval for a 12 MW Tier III data center in northern Bucharest with 3,400 square meters of white space, expected to open in 2028 (Source: Baxtel news article).

Full analysis

The Romania Data Center Infrastructure Market covers the power, cooling, rack, monitoring and supporting systems installed in Romanian data centers, from utility handover to the rack. DC Market Insights values the Romania Data Center Infrastructure Market at USD 103.62 million in 2025 and forecasts USD 479.38 million by 2035, a CAGR of 16.55%. The 2025 value is built from the build itself: about 18 MW of new IT capacity at roughly USD 3.60 million of infrastructure equipment per MW in conventional halls and USD 5.10 million per MW in AI halls gives USD 68.85 million of new-build spend, and refresh and retrofit work on an installed base of about 192 MW adds USD 34.77 million. Cloud, hyperscale and AI data centers are the fastest-growing segment at 26.22% a year because the AI campuses announced in Romania are sized in hundreds of MW, and South-West Oltenia is the fastest-growing region at 28.03% a year on the back of the ClusterPower campus at Mischii, near Craiova.

Executive Summary

The Romania Data Center Infrastructure Market size was valued at USD 48.07 million in 2020, reached USD 103.62 million in 2025, and is anticipated to reach USD 479.38 million by 2035, at a CAGR of 16.55% during the forecast period.

Report attribute Details
Historical Period 2020-2024
Base Year 2025
Forecast Period 2026-2035
Romania Data Center Infrastructure Market Size 2025 USD 103.62 Million
Romania Data Center Infrastructure Market, CAGR 16.55%
Romania Data Center Infrastructure Market Size 2035 USD 479.38 Million

The market grew at 16.60% a year between 2020 and 2025, and 2025 alone added 25.4% over 2024 as colocation operators in Bucharest ran close to full occupancy and expanded. Growth accelerates in 2026 and 2027, when the first phases of AI campuses reach ready-for-service, and settles at 16.55% a year over the decade as new capacity additions level out at about 70 MW a year after 2030.

Romania remains a small data center market by Western European standards, but a Revista Biz report built on Tema Energy figures put the cost of building a data center in Romania about 25% below Western Europe. Romania had 55 data centers in May 2026, mostly in Bucharest, Cluj, Iași, Craiova and Brașov, with about 100 MW of installed capacity in private data centers and another 100 MW in the public sector. DC Market Insights models the installed base rising from about 192 MW in 2025 to 462 MW in 2030 and 809 MW in 2035.

Romania Data Center Infrastructure Market size, 2020 to 2035: USD 48.07 million in 2020, USD 103.62 million in 2025 and USD 479.38 million by 2035 at a 16.55% CAGR

Market Scope: What Does the Romania Data Center Infrastructure Market Cover?

DC Market Insights sizes the Romania Data Center Infrastructure Market at USD 103.62 million in 2025. The market covers the physical infrastructure equipment and systems bought for data centers located in Romania, valued at first sale in current US dollars, with 2025 as the base year and forecasts to 2035.

Included. Power infrastructure (medium- and low-voltage switchgear, transformers inside the facility, uninterruptible power supply (UPS) systems, batteries, generators, busway and rack power distribution units (PDUs)), cooling infrastructure (chillers, computer room air handlers, in-row and rear-door coolers, coolant distribution units for liquid cooling, containment), IT racks and enclosures, monitoring and management systems such as data center infrastructure management (DCIM) software and sensors, and other systems: fire detection and suppression, physical security, structured cabling pathways and building management.

Excluded. Land, the building shell and general construction, servers, storage and network switches, utility-side grid connections outside the site boundary, and colocation or cloud service revenue. Data center outsourcing and infrastructure utility services, such as managed facility operations, are also excluded because they are service contracts, not equipment.

How the segments fit together. Every split in this report re-cuts the same USD 103.62 million: by component, by data center type, by tier, by end-user, by project type (new build or refresh and retrofit) and by region. Government and public sector data centers appear as an owner type in the data center type split, while government as an end-user vertical also includes public workloads hosted in colocation halls.

Market Drivers: What Drives the Romania Data Center Infrastructure Market?

Three drivers lift the market from USD 103.62 million in 2025 to USD 479.38 million by 2035. They are AI campuses that raise equipment spend per MW to USD 5.10 million, a grid operator forecast that sees data center power demand rising from 100 MW to 680 MW by 2035, and build costs well below Western Europe.

AI Halls Raise Infrastructure Spend per MW to USD 5.10 Million

A hall built for graphics processing unit (GPU) clusters needs higher-rated UPS and switchgear per rack, liquid cooling loops and heavier racks. DC Market Insights estimates the infrastructure content of an AI hall at USD 5.10 million per MW in 2025, against USD 3.60 million per MW for a conventional hall. AI halls took about 15% of new Romanian capacity in 2025 in the DC Market Insights model, rising to 50% in 2030 and 60% in 2035. The largest of the announced projects is the 800 MW AI data center region that Accelerated Infrastructure Capital (AIC) and ClusterPower agreed to co-develop in December 2025: the Mischii campus near Craiova is planned to grow from 10 MW today to 512 MW by early 2029, with a second campus at Fauresti reportedly adding 300 MW from 2029 (Source: Data Center Dynamics).

Data Center Power Demand Rises from 100 MW to 680 MW by 2035

The Romania Data Center Infrastructure Market is a build market first: 66.4% of 2025 spending went into new halls. According to a Transelectrica forecast reported by Data Center Dynamics, Romania’s data center power demand of 100 MW will rise to 370 MW by 2030 and 680 MW by 2035. DC Market Insights models annual completions rising from 18 MW in 2025 to 68 MW in 2030 and 72 MW in 2035, which keeps installed capacity ahead of the grid operator’s demand forecast at a load factor of about 80% to 84%.

Build Costs Run About 25% Below Western Europe

Investment in a 1 MW data center in Romania is around EUR 7 million to EUR 8 million, according to figures presented at Data Center Forum 2026. Tema Energy puts construction costs in Western Europe above EUR 10 million per MW and in Greece and Poland below EUR 7.5 million on average, and says Romanian costs can be lower still; a Revista Biz report based on these figures put Romanian build costs about 25% below Western Europe. Lower land and labor costs leave a larger share of each project budget for power and cooling equipment, which is what this market measures.

Cooling’s share of spending rises from 24.8% in 2025 to 29.3% in 2035. The Romania Data Center Infrastructure Market is moving from small enterprise and colocation rooms toward campus-scale AI builds, with cooling taking a larger share of every project.

Cooling Rises from 24.8% to 29.3% of Spend

Cooling infrastructure is worth USD 25.70 million in 2025 and grows at 18.51% a year to USD 140.46 million by 2035, the fastest of the five components. Rack densities in AI halls are too high for room-level air cooling alone, so operators add in-row cooling, rear-door heat exchangers and direct-to-chip liquid loops with coolant distribution units.

Modular, Standardized Builds Spread Across Sites

Operators increasingly repeat one design across several sites. Vertiv reports that a leading Romanian telecommunications provider deployed a standardized, modular data center architecture across multiple sites in three major Romanian cities with Tema Energy, using Liebert APM2 and Liebert EXS UPS systems, Liebert CRV row-based cooling, a Liebert HPC-S air-cooled chiller, PowerIT rack PDUs and containment. Repeatable designs shorten procurement and favor vendors that can supply power, cooling and racks as one package.

Monitoring and Management Grows at 18.26% a Year

DCIM software and sensors are worth USD 6.63 million in 2025 and USD 35.47 million by 2035. European Union rules now require operators of data centers with at least 500 kW of installed IT power to report energy and water data each year, which turns metering and monitoring from an option into a compliance requirement.

Market Challenges: What Holds the Romania Data Center Infrastructure Market Back?

Slow conversion of announced projects could hold the 2035 market to USD 349.01 million in the low scenario. Grid connection, permitting and the gap between announced and built capacity are the three constraints that DC Market Insights expects to slow the Romania Data Center Infrastructure Market.

Announced Capacity Far Exceeds Built Capacity

Projects announced since 2025 add up to more than 1.5 GW by DC Market Insights’ count (ClusterPower and AIC 800 MW, WDP 380 MW, Tema Energy 200 MW, DriverAI 80 MW, Sany 70 MW and S+B Gruppe 12 MW), against about 200 MW installed. ZF reported from Data Center Forum 2026 that centers with another 200 MW are yet to be built, and Tema Energy’s Mihai Manole said Romania could host more than 1 GW within five years. DC Market Insights uses 809 MW of installed capacity by 2035 in the base case, because Tema Energy says large data centers take on average two to three years to implement, and many announced sites still lack permits.

Grid Connections and Permits Decide Timing

The head of the National Energy Dispatcher at Transelectrica said in March 2026 (Source: Economica.net) that several investors in data centers of hundreds of MW had approached the grid operator, and that a technical connection approval (ATR) could be issued within three months at most. The bottleneck has moved from the connection approval to the other permits needed from local and central authorities: the municipal data center planned in Reșița sits next to a 400/220/110 kV substation but had no construction permit in May 2026. Projects with their own substation, such as ClusterPower’s Mischii campus, carry less timing risk.

Market Opportunities: Where Are the New Revenue Pools?

Cloud, hyperscale and AI data centers, growing at 26.22% a year, are the largest new revenue pool. The second is the refresh and retrofit of an installed base that grows more than fourfold by 2035.

Cloud, Hyperscale and AI Data Centers Grow Tenfold by 2035

Cloud, hyperscale and AI data centers spent USD 21.76 million on infrastructure in 2025, and DC Market Insights expects USD 223.39 million in 2035, about ten times the 2025 level. Beyond ClusterPower, DriverAI plans an 80 MW quantum AI data center in Cluj County in four 20 MW phases, and Warehouses De Pauw (WDP) holds a combined 380 MW grid connection agreement for two possible data centers in Ilfov County, expected to open by 2030 if developed. DC Market Insights expects suppliers that can deliver liquid cooling and high-capacity power trains for these sites to capture most of the growth.

Refresh and Retrofit Spending Reaches USD 179.04 Million by 2035

Older enterprise and telecom rooms need new UPS systems, efficient cooling and metering to meet European energy reporting rules. Refresh and retrofit projects account for USD 34.77 million of 2025 spend and USD 179.04 million in 2035, growing at 17.81% a year as the installed base expands. Operators comparing build, lease and retrofit options can read the Romania Data Center Colocation Market report.

Pricing: How Much Does Data Center Infrastructure Cost per MW in Romania?

A conventional hall needs about USD 3.60 million of infrastructure per MW in 2025. An AI hall needs about USD 5.10 million per MW of IT load. These are DC Market Insights estimates covering power, cooling, racks, monitoring and supporting systems, excluding land, the building shell and IT hardware, and they sit below the EUR 7 million to EUR 8 million total investment per MW quoted for Romania at Data Center Forum 2026, a whole-project figure.

Infrastructure spend per MW (USD million) 2020 2025 2030 2035
Conventional hall 3.34 3.60 3.88 4.18
AI hall 5.64 5.10 4.61 4.17
Refresh and retrofit, per installed MW a year 0.17 0.19 0.21 0.23
AI share of new capacity 0% 15% 50% 60%

The two lines converge by 2035. Conventional spend per MW rises about 1.5% a year as redundancy levels and efficiency targets rise. AI spend per MW falls about 2% a year as liquid cooling and high-density power trains move from custom engineering to standard products, so that by 2035 an AI hall costs about the same per MW as a conventional hall.

Standards and Regulation: Which Rules Shape Data Center Infrastructure in Romania?

The EU reporting duty for data centers of 500 kW and above leads the four rules that shape what Romanian operators buy: the European Union data center reporting scheme, the fluorinated gas regulation, the EN 50600 series and tier classifications.

EU data center reporting (Delegated Regulation (EU) 2024/1364). Under Commission Delegated Regulation (EU) 2024/1364, operators of data centers with an installed IT power demand of at least 500 kW report by 15 September 2024, then by 15 May 2025 and every year thereafter. The reported data are used to calculate sustainability indicators including power usage effectiveness (PUE), water usage effectiveness (WUE), the energy reuse factor (ERF) and the renewable energy factor (REF). The rule lifts demand for metering, DCIM and efficient cooling.

Fluorinated gases (Regulation (EU) 2024/573). The F-gas regulation has applied since 11 March 2024 and sets the permitted quantity of hydrofluorocarbons (HFCs) on the EU market to zero from 2050, with new placing-on-the-market bans that cover stationary chillers. Buyers of new chillers and air handlers for Romanian halls therefore have to plan for low-global-warming-potential refrigerants.

EN 50600. EN 50600-1:2026, published in 2026, sets the general concepts of the European data center facilities standard series, with a classification system based on availability, security, and resource and energy efficiency enablement.

Tier classification. Romanian colocation operators market their halls by tier level. Tier III is the most common design level in the DC Market Insights model: S+B Gruppe’s planned 12 MW facility in northern Bucharest, for example, is a Tier III data center.

Market Segmentation: Which Segment Leads the Romania Data Center Infrastructure Market?

Power infrastructure leads with 41.5% of 2025 value. Within the Romania Data Center Infrastructure Market, colocation data centers lead buyers with 36.0%, and Tier III facilities take 64.3% of spend. Among data center types, cloud, hyperscale and AI data centers are the fastest-growing segment at 26.22% a year, against 14.68% for colocation and 8.39% for enterprise data centers, because new AI campuses are sized in hundreds of MW while enterprise rooms consolidate.

By Component: Power Infrastructure Leads with 41.5%

Component 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Power Infrastructure 43.00 41.5% 190.80 16.07%
Cooling Infrastructure 25.70 24.8% 140.46 18.51%
IT Racks and Enclosures 9.95 9.6% 42.66 15.67%
Monitoring and Management (DCIM) 6.63 6.4% 35.47 18.26%
Others 18.34 17.7% 69.99 14.33%

Power infrastructure holds about two-fifths of value because every MW needs UPS capacity, batteries, generators and switchgear before any cooling is installed. Cooling gains 4.5 points of share by 2035 as liquid cooling enters AI halls.

By Data Center Type: Colocation Data Centers Lead with 36.0%

Data center type 2025 (USD million) Share 2025 2035 (USD million) CAGR 2025-2035
Colocation Data Centers 37.30 36.0% 146.69 14.68%
Enterprise Data Centers 28.50 27.5% 63.76 8.39%
Cloud, Hyperscale and AI Data Centers 21.76 21.0% 223.39 26.22%
Government and Public Sector Data Centers 16.06 15.5% 45.54 10.99%

DC Market Insights forecasts that cloud, hyperscale and AI data centers overtake colocation around 2031 and reach 46.6% of the market in 2035. Government and public sector data centers keep a steady pipeline: the government cloud program, announced in 2022, is to be financed with EUR 500 million from the National Recovery and Resilience Plan (PNRR), with its core infrastructure provided by the Special Telecommunications Service (STS).

By Tier Type: Tier III Leads with 64.3%

Tier III facilities account for USD 66.63 million of 2025 spend and grow at 17.56% a year to USD 336.05 million, 70.1% of the market in 2035. Tier IV facilities are worth USD 13.78 million (13.3%) and grow fastest at 19.66% a year, driven by financial services and AI campuses with full fault tolerance. Tier I and II rooms are worth USD 23.21 million (22.4%) and grow at 10.04% a year as small enterprise rooms are replaced by colocation.

By End-User: IT and Telecom Leads with 38.2%

IT and telecom operators account for USD 39.58 million (38.2%) of 2025 demand and grow at 19.61% a year to USD 237.28 million. BFSI follows with USD 20.31 million (19.6%), then government with USD 15.65 million (15.1%), healthcare with USD 6.53 million (6.3%) and others, including manufacturing, retail and energy, with USD 21.55 million (20.8%). Healthcare grows at 17.95% a year as hospital imaging and records systems move to dedicated halls.

By Project Type: New Build Leads with 66.4%

New-build projects account for USD 68.85 million (66.4%) of 2025 spend and USD 300.34 million (62.7%) in 2035, growing at 15.87% a year. Refresh and retrofit work grows faster, at 17.81% a year, from USD 34.77 million to USD 179.04 million, because the installed base it serves grows more than fourfold.

DC Exclusive: The Romania Infrastructure Spend per MW Model and Component × Data Center Type Matrix

At USD 15.30 million in 2025, power infrastructure for colocation data centers is the single largest cell of the matrix and 14.8% of all data center infrastructure spending in Romania. The matrix below cross-tabulates what is bought and who buys it. It is a DC Market Insights model, not a shipment count: it is built from 49 inputs: 32 capacity cohorts (16 years of conventional and AI halls), 3 cost curves per MW (conventional, AI and refresh), 5 component splits, 4 data center type splits and 5 regional splits, and it is checked against the installed capacity reported at Data Center Forum 2026 and the Transelectrica demand forecast.

2025, USD million Power Cooling Racks DCIM Others Total
Colocation Data Centers 15.30 9.32 4.28 2.47 5.93 37.30
Enterprise Data Centers 11.81 6.33 2.97 1.70 5.69 28.50
Cloud, Hyperscale and AI Data Centers 9.16 6.53 1.24 1.51 3.32 21.76
Government and Public Sector Data Centers 6.73 3.52 1.46 0.95 3.40 16.06
Total 43.00 25.70 9.95 6.63 18.34 103.62

Cloud, hyperscale and AI buyers spend 30.0% of their budget on cooling, the highest share of any buyer, and only 5.7% on racks because large operators often source racks with their IT hardware. Enterprise data centers spend the most on the others column, at 20.0% of their budget, because small rooms carry fire suppression, security and building systems over fewer MW. Colocation is the most balanced buyer, so it is where bundled power, cooling and rack offers win.

The infrastructure spend per MW model behind these figures has two inputs that any reader can check: new capacity delivered each year (18 MW in 2025) and the share of it built for AI (15% in 2025). Multiplying each by its equipment content per MW gives new-build spend; adding refresh and retrofit spend on the installed base gives the market. The model and its assumptions are explained on our research methodology page.

Regional Insights: Which Region Leads the Romania Data Center Infrastructure Market?

Bucharest-Ilfov leads with 53.6% of 2025 value. South-West Oltenia is the fastest-growing region at 28.03% a year, because the Mischii and Fauresti AI campuses near Craiova add hundreds of MW from a small base.

Bucharest-Ilfov Leads with 53.6% Share

Bucharest-Ilfov operators spent USD 55.53 million on infrastructure in 2025, and the region is forecast to reach USD 197.51 million in 2035, a CAGR of 13.53%. Bucharest has at least 31 existing data center facilities, and Tema Energy estimated occupancy in the capital at about 95% in April 2025, with capacity that could grow from about 20 MW to 50 MW within two years. Tema Energy’s Mihai Manole has also announced that a 200 MW data center will be built in western Bucharest, with estimated investment of more than EUR 1.4 billion for the physical infrastructure alone, excluding IT. With WDP’s 380 MW grid agreement in Ilfov County, DC Market Insights expects the region to remain the largest market through 2035, even as its share falls.

North-West and West Holds 17.4% Share

North-West and West Romania, around Cluj-Napoca and Timișoara, is worth USD 18.03 million in 2025 and USD 89.16 million by 2035, a CAGR of 17.33%. DriverAI’s planned 80 MW site in Cluj County and Sany International’s plans, announced in April 2026, to fund a 70 MW data center in Timișoara lift the region’s share to 18.6% by 2035.

South-West Oltenia Holds 11.3% Share and Grows Fastest

South-West Oltenia is worth USD 11.71 million in 2025 and USD 138.54 million by 2035, growing at 28.03% a year. ClusterPower’s Mischii campus near Craiova has an owned onsite substation and onsite power generation, and is planned to deliver 70 MW by the end of 2026 and a further 144 MW by the end of 2027. The region rises to 28.9% of the market in 2035.

North-East and South-East Holds 11.2% Share

North-East and South-East Romania, led by Iași and Constanța, is worth USD 11.61 million in 2025 and USD 34.04 million by 2035, a CAGR of 11.36%, driven mainly by enterprise, university and public sector rooms.

Center Holds 6.5% Share

The Center region, around Brașov and Sibiu, is worth USD 6.74 million in 2025 and USD 20.13 million by 2035, a CAGR of 11.56%. For the full picture of capacity, colocation and cloud spending, read the Romania Data Center Market report.

Forecast Scenarios: How Could the 2035 Forecast Change?

The base case reaches USD 479.38 million by 2035. The Romania Data Center Infrastructure Market ranges from USD 349.01 million to USD 609.79 million across the low and high scenarios.

Scenario Assumption from 2026 2035 (USD million) CAGR 2025-2035
Low Capacity additions 30% below base; AI share of new capacity capped at 40% 349.01 12.91%
Base Additions rise to 72 MW a year; AI share reaches 60% 479.38 16.55%
High Additions 30% above base; AI share 6 points higher each year 609.79 19.39%

The low case is what happens if the large AI campuses slip by several years and Romania grows mainly through colocation in Bucharest. The high case assumes that the announced AI campuses in South-West Oltenia, Cluj and Ilfov are built close to their published schedules, which would take installed capacity past 1 GW before 2035.

Competitive Insights: Who Leads the Romania Data Center Infrastructure Market?

Schneider Electric, Vertiv and Eaton together hold about 38% of the market (DC Market Insights estimate).

  • Schneider Electric
  • Vertiv
  • Eaton
  • ABB
  • Siemens
  • Legrand
  • Rittal
  • Socomec
  • Riello UPS
  • STULZ
  • Huawei Digital Power
  • Delta Electronics
  • Cummins
  • Caterpillar
  • Tema Energy

DC Market Insights estimates that the three largest equipment suppliers, Schneider Electric, Vertiv and Eaton, together hold about 38% of the Romania Data Center Infrastructure Market in 2025 (DC Market Insights estimate, based on their share of the UPS, cooling and rack power equipment in the power and cooling components, which make up 66.3% of the market). Vertiv’s Romanian references include a multi-site, modular deployment for a leading telecommunications provider, delivered with Tema Energy, that combines UPS, row-based cooling, an air-cooled chiller, rack PDUs and containment. In the DC Market Insights assessment, ABB, Siemens and Socomec compete on switchgear and power distribution, Rittal and Legrand on racks and enclosures, STULZ on precision cooling, and Cummins and Caterpillar on standby generators. Tema Energy works as a local partner on data center builds, including the Vertiv telecom deployment.

Recent Developments

Five project announcements since August 2025 add up to about 1,472 MW of planned capacity, by DC Market Insights’ count.

  • In August 2025, Tema Energy said a 200 MW data center will be built in western Bucharest, with estimated investment of more than EUR 1.4 billion for the physical infrastructure alone, excluding IT (Source: ZF English article).
  • In December 2025, AIC and ClusterPower announced an equity partnership to co-develop an 800 MW AI data center region in south-western Romania, across the Mischii and Fauresti campuses (Source: Data Center Dynamics article).
  • In March 2026, the head of the National Energy Dispatcher at Transelectrica said investors in data centers of hundreds of MW that have a site and a solution study could receive a technical connection approval within three months at most (Source: Economica.net article).
  • In June 2026, DriverAI announced plans for an 80 MW quantum AI data center in Cluj County, to be built in four 20 MW phases (Source: Data Center Dynamics article).
  • In August 2026, WDP said it is considering two data centers in Ilfov County with a combined 380 MW grid connection agreement already approved, expected to open by 2030 if developed (Source: Data Center Dynamics article).
  • In September 2026, S+B Gruppe secured approval for a 12 MW Tier III data center in northern Bucharest with 3,400 square meters of white space, expected to open in 2028 (Source: Baxtel news article).

We follow these deals, launches and capacity announcements as they happen in our data center industry updates.

Methodology: How We Built the Romania Data Center Infrastructure Market Model

DC Market Insights built the model from 49 inputs. The market is built bottom-up from 16 annual capacity cohorts (2020 to 2035), each split into conventional and AI halls and priced with an infrastructure cost per MW: USD 3.60 million for conventional halls and USD 5.10 million for AI halls in 2025. Refresh and retrofit spending was added on the installed base at USD 0.19 million per installed MW a year in 2025, rising 2% a year. The installed base starts at 128 MW in 2020 and reaches 192 MW in 2025, close to the 200 MW of private and public sector capacity reported in May 2026, and 809 MW in 2035, above the 680 MW of data center power demand in the Transelectrica forecast for 2035. The total was split by 5 components, 4 data center types, 3 tier levels, 5 end-user groups, 2 project types and 5 regions, and every split sums to the market total. The analyst named on this page built the model, and the reviewer checked the arithmetic, the sources and the dates before publication.

Table of contents

  • 20 chapters
  • 6 figures
  • 11 data tables
  1. 01Introduction
    • 1.1Market Definition and Scope
    • 1.2Research Objectives
    • 1.3Currency, Units and Base Year
  2. 02Research Methodology
    • 2.1Bottom-Up Capacity Cohort Model
    • 2.2Infrastructure Spend per MW
    • 2.3Top-Down Checks Against Capacity and Grid Forecasts
    • 2.4Data Sources and Validation
  3. 03Executive Summary
    • 3.1Market Snapshot, 2025 and 2035
    • 3.2Key Findings
    • 3.3Analyst View
  4. 04Market Dynamics
    • 4.1Market Drivers
    • 4.2Market Trends
    • 4.3Market Challenges
    • 4.4Market Opportunities
  5. 05Pricing Analysis
    • 5.1Infrastructure Spend per MW, Conventional Halls
    • 5.2Infrastructure Spend per MW, AI Halls
    • 5.3Refresh and Retrofit Spend per Installed MW
  6. 06Standards and Regulation
    • 6.1EU Data Center Reporting (Delegated Regulation (EU) 2024/1364)
    • 6.2F-Gas Regulation (EU) 2024/573
    • 6.3EN 50600 Series
    • 6.4Tier Classification
  7. 07Supply Chain and Project Delivery
    • 7.1Equipment Suppliers
    • 7.2Engineering and Integration Partners
    • 7.3Grid Connection and Permitting
  8. 08Romania Data Center Infrastructure Market Size and Forecast
    • 8.1Market Size, 2020-2035
    • 8.2Installed Capacity and Annual Additions, 2020-2035
    • 8.3New Build and Refresh Spend, 2020-2035
  9. 09Market by Component
    • 9.1Power Infrastructure
    • 9.2Cooling Infrastructure
    • 9.3IT Racks and Enclosures
    • 9.4Monitoring and Management (DCIM)
    • 9.5Others
  10. 10Market by Data Center Type
    • 10.1Colocation Data Centers
    • 10.2Enterprise Data Centers
    • 10.3Cloud, Hyperscale and AI Data Centers
    • 10.4Government and Public Sector Data Centers
  11. 11Market by Tier Type
    • 11.1Tier I and II
    • 11.2Tier III
    • 11.3Tier IV
  12. 12Market by End-User
    • 12.1IT and Telecom
    • 12.2BFSI
    • 12.3Government
    • 12.4Healthcare
    • 12.5Others
  13. 13Market by Project Type
    • 13.1New Build
    • 13.2Refresh and Retrofit
  14. 14DC Exclusive: Component × Data Center Type Matrix
    • 14.1Matrix, 2025
    • 14.2Model Inputs
  15. 15Market by Region
    • 15.1Bucharest-Ilfov
    • 15.2North-West and West (Cluj-Napoca, Timișoara)
    • 15.3South-West Oltenia (Craiova)
    • 15.4North-East and South-East (Iași, Constanța)
    • 15.5Center (Brașov, Sibiu)
  16. 16Regional Cross-Sections
    • 16.1Region by Data Center Type, 2025 and 2035
    • 16.2Region by Component, 2025 and 2035
  17. 17Forecast Scenarios
    • 17.1Low Scenario
    • 17.2Base Scenario
    • 17.3High Scenario
  18. 18Competitive Landscape
    • 18.1Market Concentration
    • 18.2Competitive Positioning by Component
    • 18.3Recent Developments
  19. 19Company Profiles
    • 19.1Schneider Electric
    • 19.2Vertiv
    • 19.3Eaton
    • 19.4ABB
    • 19.5Siemens
    • 19.6Legrand
    • 19.7Rittal
    • 19.8Socomec
    • 19.9Riello UPS
    • 19.10STULZ
    • 19.11Huawei Digital Power
    • 19.12Delta Electronics
    • 19.13Cummins
    • 19.14Caterpillar
    • 19.15Tema Energy
  20. 20Analyst Recommendations
    • 20.1For Equipment Suppliers
    • 20.2For Operators and Developers
    • 20.3For Investors
  1. Fig. 1Romania Data Center Infrastructure Market Size, 2020-2035
  2. Fig. 2Romania Data Center Infrastructure Market by Component, 2025 and 2035
  3. Fig. 3Romania Data Center Infrastructure Market by Region, 2025 and 2035
  4. Fig. 4Installed Data Center Capacity in Romania, 2020-2035
  5. Fig. 5Infrastructure Spend per MW, 2020-2035
  6. Fig. 6Forecast Scenarios, 2035
  1. Table 1Romania Data Center Infrastructure Market, Key Attributes
  2. Table 2Infrastructure Spend per MW, 2020, 2025, 2030 and 2035
  3. Table 3Market by Component, 2025 and 2035
  4. Table 4Market by Data Center Type, 2025 and 2035
  5. Table 5Market by Tier Type, 2025 and 2035
  6. Table 6Market by End-User, 2025 and 2035
  7. Table 7Market by Project Type, 2025 and 2035
  8. Table 8Component × Data Center Type Matrix, 2025
  9. Table 9Market by Region, 2025 and 2035
  10. Table 10Forecast Scenarios, 2035
  11. Table 11Company Overview

About this report

Priyanka MorDeepti Agrawal

Written by Priyanka Mor and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.

Read our methodology

How we built this

  • Historical period2020-2024
  • Base year2025
  • Forecast period2026-2035
  • Sizing approachTop-down + bottom-up

Need more than the report?

Advisory on this market

Due diligence, site selection and market entry work, by the analysts who wrote this report.

See consulting services

Frequently asked questions

What is the size of the Romania Data Center Infrastructure Market in 2025 and 2035?

USD 103.62 million in 2025, rising to USD 479.38 million by 2035. DC Market Insights estimates the market at USD 48.07 million in 2020.

How fast is the Romania Data Center Infrastructure Market growing?

16.55% a year from 2025 to 2035, after 16.60% a year between 2020 and 2025. Cloud, hyperscale and AI data centers grow fastest at 26.22% a year (DC Market Insights estimate).

How many data centers are there in Romania?

55 data centers in May 2026, mostly in Bucharest, Cluj, Iași, Craiova and Brașov, with about 100 MW of installed capacity in private data centers and another 100 MW in the public sector.

How much does data center infrastructure cost per MW in Romania?

About USD 3.60 million per MW for a conventional hall and USD 5.10 million per MW for an AI hall in 2025, according to DC Market Insights estimates covering power, cooling, racks, monitoring and supporting systems.

Which component leads the Romania Data Center Infrastructure Market?

Power infrastructure, with USD 43.00 million or 41.5% of 2025 value. Cooling infrastructure grows fastest at 18.51% a year as liquid cooling enters AI halls.

Which region leads the Romania data center market for infrastructure?

Bucharest-Ilfov, with USD 55.53 million or 53.6% of 2025 value. South-West Oltenia, home to the ClusterPower campus near Craiova, grows fastest at 28.03% a year.

How big is colocation in the Romania Data Center Infrastructure Market?

USD 37.30 million, or 36.0% of 2025 infrastructure spending, making colocation data centers the largest buyer type. Colocation spending grows at 14.68% a year to USD 146.69 million by 2035.

Who are the leading companies in the Romania Data Center Infrastructure Market?

About 38% of the market is held by Schneider Electric, Vertiv and Eaton together (DC Market Insights estimate). ABB, Siemens, Legrand, Rittal, Socomec, Riello UPS, STULZ, Cummins, Caterpillar and Tema Energy also compete, in the DC Market Insights assessment.

Get this report

How do I get the full report?

Request a quote; we reply by email within one business day.

How and when will I receive the report?

By email, within 24-48 business hours of payment.

How can I pay?

Once you accept the quote, we email you a secure payment link.

Can I see a sample first?

Yes. Request a free sample and we will email it to you.

Can the report be tailored to my needs?

Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.

Can I get an invoice or pay against a purchase order?

Write to sales@dcmarketinsights.com and our team will help.

Refund and returns policy

Request a quote

Romania Data Center Infrastructure Market

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Free sample

Romania Data Center Infrastructure Market

See the structure, tables and charts before you decide.

Smallform of Sample request

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to send your sample and answer your questions
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

Talk to an analyst

Ask the team that built this report

Different scope, country or data cut? A senior analyst replies within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy