Proprietary data

Evocative Data Centers

Data centers operated by Evocative that we have verified: location, status and capacity, each checked against its source.

In short

As of 5 November 2026, DC Market Insights tracks 13 data centers operated by Evocative in 1 country, of which 13 are operational. Stated operational capacity is 79.5 MW.

13Facilities tracked
1Countries
79.5 MWOperational (13 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 8 of 13 facilities have a stated capacity; the others are counted as sites only.

Evocative EWR1 Secaucus · Evocative · Secaucus (approximate location)Evocative DAL6 Plano · Evocative · Plano (approximate location)Evocative SJC7 San Jose · Evocative · San Jose (approximate location)Evocative SJC3 Santa Clara · Evocative · Santa Clara (approximate location)Evocative SJC11 Santa Clara · Evocative · Santa Clara (approximate location)Evocative LAX2 Los Angeles · Evocative · Los Angeles (approximate location)Evocative LAX14 Redondo Beach · Evocative · Redondo Beach (approximate location)Evocative ATL1 Atlanta · Evocative · Atlanta (approximate location)Evocative BOS1 Boston · Evocative · Boston (approximate location)Evocative PHX1 Phoenix · Evocative · Phoenix (approximate location)Evocative DAL1 Plano · Evocative · Plano (approximate location)Evocative SJC14 Santa Clara · Evocative · Santa Clara (approximate location)Evocative SEA1 Seattle · Evocative · Seattle (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Evocative data centers: key facts

About Evocative

Evocative is a US provider of carrier-neutral colocation, network, bare metal and managed services. In February 2026 it stated enterprise-grade colocation in 13 U.S. data centers, which its site lists in Los Angeles, Redondo Beach, San Jose, Santa Clara (3), Phoenix, Atlanta, Secaucus, Boston, Plano (2) and Seattle, plus points of presence in the US, Poland and Singapore. Crestline Investors is its long-term investment partner; in December 2025 it raised debt financing to expand capacity in key metros.

Headquarters
Los Angeles and San Jose (dual headquarters), United States
Founded
2017
Ownership
Private; equity backing from Crestline Investors, its long-term investment partner
Tracked footprint
13 facilities in 1 country
Website
evocative.com

Data center business

  • Derek Garnier became Chief Executive Officer in February 2023, succeeding founder Arman Khalili, who stayed on the Board of Directors.
  • On 28 September 2022 Evocative closed the asset acquisition of nine INAP data centers, adding the Boston, Atlanta and Seattle markets. It then stated 20 carrier-neutral Tier II and Tier III US data centers, 1,080,000 sq ft of space and 108 MW of available power. The deal was funded by an equity investment led by Crestline.
  • In April 2022 Evocative bought Carrier-1's Dallas data center (DA4), its fourth location in the Dallas area.
  • Evocative was founded in 2017 as Evocative Data Centers with a $2.5 million seed investment led by Arman Khalili. After it acquired VPLS and VPLS Solutions in 2019 it was rebranded VPLS, and by April 2022 it had grown from two Bay Area data centers to 16 data centers in the United States, Europe and Asia. Crestline invested $30 million in 2019 and $30 million more in April 2022.
  • Evocative lists 13 colocation data centers: Los Angeles (LAX2) and Redondo Beach (LAX14) in California; San Jose (SJC7) and Santa Clara (SJC3, SJC11, SJC14) in Silicon Valley; Phoenix (PHX1); Atlanta (ATL1); Secaucus, New Jersey (EWR1); Boston (BOS1); Plano, Texas (DAL1, DAL6); and Seattle (SEA1).
  • Besides its colocation sites, Evocative lists 12 additional points of presence, including El Segundo and Los Angeles, San Jose and Santa Clara, Honolulu, Boston, Dallas, Seattle, Warsaw (Poland) and Singapore. Its services are colocation, network, bare metal servers and managed services.
  • Site power on Evocative's facility pages: Redondo Beach LAX14 20 MW, Atlanta ATL1 15 MW (a fourth 6 MW feed being added), Plano DAL6 12 MW with 20+ MW expansion, Secaucus EWR1 10 MW (feeds expandable to 20 MW), Santa Clara SJC11 9 MW, Boston BOS1 6 MW, Seattle SEA1 4.5 MW and Santa Clara SJC3 3 MW. These are total or utility power figures, not IT load.
  • The Phoenix PHX1 and Plano DAL1 pages describe 550,000 sq ft and 300,000 sq ft facilities with 69 MW and 30 MW loads on dedicated substations and a PUE of 1.15; the Atlanta ATL1 site has 120,000 sq ft of space.

Recent updates

  • Evocative published EvoPod, a modular AI infrastructure platform for GPU clusters, LLM training, inference and HPC, supporting 100kW+ per rack with air, liquid or hybrid cooling.
  • Evocative was named to the CRN MSP 500 Elite 150 list for 2026, its eleventh year on the list. The release describes enterprise-grade colocation in 13 U.S. data centers in Tier II and Tier III U.S. markets.
  • Evocative raised debt financing from a large global investment firm, alongside continued equity support from Crestline Investors. The money is for capacity upgrades, metro expansions and work on its data center, network, bare metal and cloud platforms. Guggenheim Securities was sole structuring advisor and placement agent.
  • Evocative was ranked No. 3372 on the 2025 Inc. 5000 list, its sixth year in a row.
  • Evocative extended Megaport's software-defined network to its Atlanta, Dallas, Los Angeles, Secaucus and Silicon Valley data centers, after launching it in Boston and Seattle in October 2024.

Company details checked against company and official sources, 5 Nov 2026.

  • Its largest operational site is Evocative LAX14 Redondo Beach in Redondo Beach, United States at 20 MW.
  • 8 of 13 facilities have a capacity stated by their source; the totals above count only those.

Facilities

13 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Evocative LAX14 Redondo BeachColocation Redondo Beach, United States Operational 20 MW total — Operator / official
Evocative ATL1 AtlantaColocation
History
  1. Operational
  2. Operational
Atlanta, United States Operational 15 MW total — Operator / official
Evocative DAL6 PlanoColocation Plano, United States Operational 12 MW total — Operator / official
Evocative EWR1 SecaucusColocation Secaucus, United States Operational 10 MW total — Operator / official
Evocative SJC11 Santa ClaraColocation Santa Clara, United States Operational 9 MW total — Operator / official
Evocative BOS1 BostonColocation
History
  1. Operational
  2. Operational
Boston, United States Operational 6 MW total — Operator / official
Evocative SEA1 SeattleColocation
History
  1. Operational
  2. Operational
Seattle, United States Operational 4.5 MW total — Operator / official
Evocative SJC3 Santa ClaraColocation
History
  1. Operational
  2. Operational
Santa Clara, United States Operational 3 MW total — Operator / official
Evocative DAL1 PlanoColocation Plano, United States Operational — — Operator / official
Evocative LAX2 Los AngelesColocation Los Angeles, United States Operational — — Operator / official
Evocative PHX1 PhoenixColocation Phoenix, United States Operational — — Operator / official
Evocative SJC14 Santa ClaraColocation Santa Clara, United States Operational — — Operator / official
Evocative SJC7 San JoseColocation San Jose, United States Operational — — Operator / official

Market position

How Evocative compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Evocative ranks #45 of 171 tracked operators by capacity, with 0.1% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Santa Clara also hosts 10 other tracked data center(s), run by EdgeCore Digital Infrastructure, STACK Infrastructure, Centersquare and CloudHQ.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Evocative rank by capacity#45of 171 operators · 0.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Other data centers in Santa Clara

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Evocative operate?

DC Market Insights tracks 13 Evocative data center(s) in 1 country as of November 2026: 13 operational, 0 under construction and 0 planned.

Where is Evocative headquartered?

Evocative is headquartered in Los Angeles and San Jose (dual headquarters), United States. Ownership: Private; equity backing from Crestline Investors, its long-term investment partner.

Which other companies operate data centers in United States?

Besides Evocative, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Santa Clara?

Other tracked data centers in Santa Clara include EdgeCore Silicon Valley Campus (EdgeCore Digital Infrastructure), STACK Infrastructure SVY02 Santa Clara (STACK Infrastructure), Centersquare SFO2 Santa Clara (Centersquare) and Centersquare SFO4 Santa Clara (Centersquare).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst