Switch Data Centers

Data centers operated by Switch that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 October 2026, DC Market Insights tracks 23 data centers operated by Switch in 1 country, of which 15 are operational. Stated operational capacity is 58 MW, with a further 55 MW under construction and — planned. The pipeline is 0.9 times the capacity already operating.

23Facilities tracked
1Countries
58 MWOperational (15 sites)
55 MWUnder construction (3 sites)
—Planned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 23 facilities have a stated capacity; the others are counted as sites only.

Switch The Rock · Switch · Round Rock (approximate location)Switch Data Foundry Texas 1 (Data Foundry 01) · Switch · Austin (approximate location)Switch Data Foundry Texas 2 (Data Foundry 02) · Switch · Austin (approximate location)Switch Data Foundry Austin 1 · Switch · Austin (approximate location)Switch Data Foundry Houston 2 · Switch · Houston (approximate location)Switch LAS VEGAS 2 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 4 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 5 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 7 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 8 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 9 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 11 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 12 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 10 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 15 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 14 · Switch · Las Vegas (approximate location)Switch LAS VEGAS 16 · Switch · Las Vegas (approximate location)Switch Beaver County Campus · Switch · Big Beaver (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Switch data centers: key facts

About Switch

Switch is a Las Vegas-based designer, builder and operator of data center campuses, founded in 2000 by CEO Rob Roy. As of November 2025 it said it operates five exascale U.S. data center campuses across Las Vegas, Tahoe Reno, Atlanta, Grand Rapids and Austin, on thousands of acres with multi-gigawatt power capacities; two of them, in Nevada, are gigawatt-scale. In April 2026 it announced a sixth campus in Beaver County, Pennsylvania. It has been privately owned by DigitalBridge and IFM Investors since an $11 billion take-private in December 2022.

Headquarters
Las Vegas, United States
Founded
2000
Ownership
Private; owned by DigitalBridge and IFM Investors (take-private completed 6 Dec 2022)
Parent company
DigitalBridge and IFM Investors
Tracked footprint
23 facilities in 1 country
Website
switch.com

Data center business

  • Switch describes itself as a data center campus designer, builder and operator whose portfolio spans liquid-cooled AI, hyperscale cloud and high-security enterprise data centers. Its EVO AI facilities are engineered to power and cool up to 2 MW per rack, and Switch says the EVO data centers use no water to cool servers and GPUs.
  • Switch says it operates two gigawatt-scale data center campuses in Nevada, Las Vegas and Tahoe Reno, and refers to a growing portfolio of gigawatt-scale campuses; its other U.S. campuses are The Keep in Atlanta, The Pyramid in Grand Rapids, Michigan, and Austin/Houston in Texas.
  • The Tahoe Reno Citadel Campus can expand to more than 7 million square feet and over 600 MW at full build-out; TAHOE RENO 1 was the first 1.3 million square foot building on the campus, and construction of TAHOE RENO 2 and site work for TAHOE RENO 3 started in November 2020.
  • Switch entered Texas in 2021 by agreeing to buy Data Foundry for $420 million in cash. The Austin campus had three facilities with expansion up to 44 MW at full buildout, and the Houston campus one data center able to support 18 MW of customer power at full buildout. Switch now lists Texas campuses in Austin, Houston and Round Rock (The Rock), where it has committed more than $250 million of local investment.
  • Following its April 2026 issuance, Switch's securitized ABS pool holds 11 data centers across five U.S. markets, after adding a Reno, Nevada data center of about 1.4 million square feet. Switch also completed a $2.4 billion data center CMBS financing in 2025.
  • Switch buys power from Nevada geothermal plants: Ormat's Salt Wells plant near Fallon will supply about 13 MW under a 20-year PPA from Q1 2030, with an option for about 7 MW of solar PV. Switch offsets its electricity use with renewable energy credits and says it funds its own energy and infrastructure costs.

Recent updates

  • Switch said it supports Texas Governor Greg Abbott's standards for responsible data center growth; it has campuses in Austin, Houston and Round Rock and a Round Rock economic development agreement running to 2037.
  • Switch extended and upsized its corporate revolving credit facility to more than $6 billion and expanded its performance letter of credit facility to $3.5 billion, giving nearly $10 billion of liquidity and credit support for its contracted pipeline and gigawatt-scale campus growth.
  • Switch announced plans for a new 382-acre data center campus in Big Beaver Borough, Beaver County, Pennsylvania, in the Greater Pittsburgh area; no MW or timeline was given.
  • Switch secured a $2.6 billion syndicated performance letter of credit facility to procure power at scale and support new transmission and generation resources for its campuses.
  • Switch raised about $768 million through its Series 2026-1 data center ABS issuance, adding a Reno facility and taking the securitized pool to 11 data centers in five U.S. markets.
  • Ormat Technologies signed a 20-year PPA to supply about 13 MW of geothermal power from Salt Wells to Switch's Nevada data centers, deliveries from Q1 2030.
  • Schneider Electric and Switch agreed a two-phase $1.9 billion supply capacity agreement for prefabricated power modules and Uniflair chillers for Switch's AI factories.

Company details checked against company and official sources, 18 Oct 2026.

  • Capacity under construction or planned (55 MW) is 0.9 times the operational base of 58 MW.
  • Its largest operational site is Switch LAS VEGAS 10 in Las Vegas, United States at 40 MW.
  • The largest project in the pipeline is Switch TAHOE RENO 2 (55 MW, under construction).
  • By type, the tracker lists 22 colocation and 1 hyperscale facilities.
  • 3 of 23 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational58 MW
Under construction55 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities by type
Colocation22
Hyperscale1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Switch development pipeline

Under construction and planned facilities with a stated capacity, largest first. 55 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Switch TAHOE RENO 2Switch United States Under construction Colocation 55 MW

Facilities

23 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Switch TAHOE RENO 2Colocation
History
  1. Under construction
  2. Under construction
United States Under construction 55 MW total — Operator / official
Switch LAS VEGAS 10Colocation Las Vegas, United States Operational 40 MW total 2017 Operator / official
Switch Data Foundry Houston 2Colocation Houston, United States Operational 18 MW total 2015 Operator / official
Switch Beaver County CampusHyperscale
History
  1. Announced
  2. Planned
Big Beaver, United States Planned — — Operator / official
Switch Data Foundry Austin 1Colocation Austin, United States Operational — — Operator / official
Switch Data Foundry Texas 1 (Data Foundry 01)Colocation Austin, United States Operational — — Operator / official
Switch Data Foundry Texas 2 (Data Foundry 02)Colocation Austin, United States Operational — 2018 Operator / official
Switch LAS VEGAS 11Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 12Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 14Colocation Las Vegas, United States Planned — — Operator / official
Switch LAS VEGAS 15Colocation
History
  1. Under construction
  2. Under construction
Las Vegas, United States Under construction — — Operator / official
Switch LAS VEGAS 16Colocation Las Vegas, United States Planned — — Operator / official
Switch LAS VEGAS 2Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 4Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 5Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 7Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 8Colocation Las Vegas, United States Operational — — Operator / official
Switch LAS VEGAS 9Colocation Las Vegas, United States Operational — — Operator / official
Switch TAHOE RENO 1Colocation Cooling: Hybrid
History
  1. Operational
  2. Operational
United States Operational — 2016 Operator / official
Switch TAHOE RENO 3Colocation United States Planned — — Operator / official
Switch The Pyramid CampusColocation Cooling: Hybrid · Owned: Switch owns and operates its Prime campuses incl. The Pyramid Campus
History
  1. Under construction
  2. Operational
Gaines Township, United States Operational — — Operator / official
Switch The RockColocation
History
  1. Announced
  2. Planned
Round Rock, United States Planned — — Operator / official
The KeepColocation United States Under construction — — Operator / official

Market position

How Switch compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, Switch ranks #42 of 171 tracked operators by capacity, with 0.1% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • Las Vegas also hosts 4 other tracked data center(s), run by DataBank, Flexential, EdgeConneX and Fiberhub.
  • Our Deal Tracker lists 1 deal(s) naming Switch, the latest on 10 November 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
Switch rank by capacity#42of 171 operators · 0.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Other data centers in Las Vegas

  • DataBank LAS1 Las Vegas · DataBank · Operational · 3.4 MW
  • Flexential Las Vegas – Downtown · Flexential · Operational · 1.4 MW
  • EdgeConneX LAS01 Las Vegas · EdgeConneX · Operational · 0.8 MW
  • Fiberhub LAS1 · Fiberhub · Operational

Deals naming Switch

  • Principal Asset Management (Principal European Data Centre Fund I) → Switch Datacenters AMS2 facility, Woerden M&A

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Switch operate?

DC Market Insights tracks 23 Switch data center(s) in 1 country as of October 2026: 15 operational, 3 under construction and 5 planned.

Where is Switch headquartered?

Switch is headquartered in Las Vegas, United States. Ownership: Private; owned by DigitalBridge and IFM Investors (take-private completed 6 Dec 2022).

Which other companies operate data centers in United States?

Besides Switch, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Las Vegas?

Other tracked data centers in Las Vegas include DataBank LAS1 Las Vegas (DataBank), Flexential Las Vegas – Downtown (Flexential), EdgeConneX LAS01 Las Vegas (EdgeConneX) and Fiberhub LAS1 (Fiberhub).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker