Proprietary data

Data Centers in Switzerland

Every data center in Switzerland that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 26 November 2026, DC Market Insights tracks 33 data centers in Switzerland run by 13 operators: 25 operational, 5 under construction and 3 planned. Stated operational capacity is 78.4 MW, with a further 81 MW under construction and 36 MW planned. Vantage Data Centers holds the largest share of tracked operational capacity (51%).

33Facilities tracked
13Operators
78.4 MWOperational (25 sites)
81 MWUnder construction (5 sites)
36 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 15 of 33 facilities have a stated capacity; the others are counted as sites only.

Vantage Zurich I (ZRH1) campus · Vantage Data Centers · Winterthur (approximate location) · Cooling: Chilled water, dry coolersWinterthur (Zurich) · NorthC · Winterthur (approximate location)Münchenstein (Basel) 2 · NorthC · Münchenstein (approximate location)Münchenstein (Basel) 3 – uptownBasel · NorthC · Arlesheim (approximate location)Geneva – The Hive · NorthC · Meyrin (approximate location)Equinix ZH4 · Equinix · Zurich (approximate location)Digital Realty ZUR3 · Digital Realty · Opfikon (approximate location)Green ZRH1 Lupfig campus · Green · Lupfig (approximate location)Green ZRH1 Lupfig fourth data center · Green · Lupfig (approximate location)Green ZRH2 Dielsdorf third data center · Green · Dielsdorf (approximate location)Green ZRH3 Schlieren · Green · Schlieren (approximate location)Green ZRH4 Glattbrugg · Green · Opfikon (approximate location)STACK ZUR02 Beringen · STACK Infrastructure · Beringen (approximate location) · Cooling: HybridDigital Realty ZUR4 · Digital Realty · Opfikon (approximate location)GTR CH One · Global Technical Realty · Zurich (approximate location)Infomaniak D4 · Infomaniak · Geneva (approximate location)Swisscom Bonvillars data centre · Swisscom · Bonvillars (approximate location)AWS Europe (Zurich) Region eu-central-2 · Amazon Web Services · Zurich (approximate location) · Leased in colocation: reportedly Green (Lupfig, fourth data center), Vantage (Winterthur) and Interxion/Digital Realty (Glattbrugg, ZUR3), per industry insiders; AWSMicrosoft Switzerland North (Zurich) · Microsoft · Zurich (approximate location)Microsoft Switzerland West (Geneva) · Microsoft · Geneva (approximate location)Biel (Bern) · NorthC · Biel/Bienne (exact location) · Cooling: HybridMünchenstein (Basel) 1 · NorthC · Münchenstein (exact location)Equinix ZH2 · Equinix · Zurich (exact location)Equinix ZH5 · Equinix · Oberengstringen (exact location)Equinix GV1 · Equinix · Geneva (exact location)Equinix GV2 · Equinix · Vernier (exact location)Digital Realty ZUR1 · Digital Realty · Opfikon (exact location)Digital Realty ZUR2 · Digital Realty · Opfikon (exact location)Green ZRH2 Dielsdorf campus · Green · Dielsdorf (exact location)NTT Zurich 1 Data Center · NTT DATA · Rümlang (exact location)Vaultica GEN01 (GEN01A) · Vaultica · Plan-les-Ouates (exact location)Vaultica GEN02 · Vaultica · Gland (exact location) · Cooling: Hybrid
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Switzerland data center market: key facts

  • Capacity under construction or planned (117 MW) is 1.5 times the operational base of 78.4 MW.
  • The three largest operators by operational capacity, Vantage Data Centers, NTT DATA and NorthC, hold 92% of tracked operational MW.
  • STACK Infrastructure has the largest development pipeline in Switzerland: 30 MW under construction or planned.
  • The largest operational facility we track is Vantage Zurich I (ZRH1) campus (Vantage Data Centers, Winterthur) at 40 MW.
  • The largest project in the pipeline is STACK ZUR02 Beringen (30 MW, under construction).
  • Zurich is the largest cluster: 21 of 33 facilities and 85% of tracked capacity.
  • By type, the tracker lists 27 colocation, 5 hyperscale and 1 other facilities.
  • 15 of 33 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational78.4 MW
Under construction81 MW
Planned36 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Switzerland by tracked capacity, MW
NorthC24.4 MW
Green12 MW

OperationalUnder construction or planned

Capacity by market in Switzerland, MW
Zurich167 MW
Basel14.1 MW
Geneva10.5 MW
Bern4 MW

OperationalUnder construction or planned

Facilities by type
Colocation27
Hyperscale5
Other1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Switzerland data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 21 October 2026. Government sources are linked; the full source list comes with the Excel data.

Switzerland's data centers used about 2.1 TWh of electricity in 2024, around 3.6% of national demand, and the SFOE expects 2.5-3.2 TWh by 2030. Sites above 100 MWh/yr already buy power on the free market; full opening is tied to the pending EU electricity agreement. Power is mostly hydro and nuclear, and Zurich adds cantonal efficiency and waste heat duties. BFE – Rechenzentren in der Schweiz: Stromverbrauch und Effizienzpotenziale

Policy and incentives

The Federal Act on a Secure Electricity Supply with Renewable Energies (Mantelerlass) entered into force in two packages: the first on 1 January 2025, the second (local electricity communities, minimum feed-in remuneration) on 1 January 2026. Der Bundesrat – erstes Paket Bundesgesetz sichere Stromversorgung

The SFOE's May 2026 data center study estimates remaining efficiency potential at about 0.8 TWh and says the office will monitor data center consumption and efficiency more closely. There is no federal data center plan, moratorium or binding PUE rule. BFE – Rechenzentren in der Schweiz

The revised Data Protection Act and its ordinances apply since 1 September 2023; the revised CO2 Ordinance sets sector reduction targets to 2030 and applies retroactively from 1 January 2025. Der Bundesrat – Neues Datenschutzrecht ab 1. September 2023

Power and grid

Under the Electricity Supply Act, end users below 100 MWh per year per site are captive in basic supply; larger sites, including data centers, can choose their supplier. The Federal Council set a future basic-supply threshold of 50 MWh on 28 January 2026 under the EU electricity agreement, still subject to Parliament. Der Bundesrat – Schwelle für die Grundversorgung

The ElCom 2026 national median for a large business (category C7, 7.5 GWh/yr, medium voltage) in basic supply is 19.62 Rp./kWh, of which 11.15 Rp. energy and 5.40 Rp. grid usage; for 2027 it falls to 18.15 Rp./kWh. ElCom – Median electricity tariff for Switzerland

For 2027 the electricity reserve surcharge drops to 0.17 Rp./kWh (2026: 0.41) and Swissgrid's tariffs to 1.2 Rp./kWh (2026: 1.42), while the median household grid tariff rises from 10.73 to 10.94 Rp./kWh. ElCom – Strompreise 2027

Land, zoning and sites

In the canton of Zurich, sites using more than 0.5 GWh of electricity a year are large consumers under § 13a of the Energy Act and must conclude efficiency agreements; the cantonal government confirmed in January 2024 that data centers such as the Vantage campus in Winterthur-Neuhegi fall under this model. Regierungsrat des Kantons Zürich – RRB Nr. 20/2024

Zurich's Special Building Ordinance I (§ 30a para. 2) requires unused waste heat above 2 GWh per year from new or renewed cooling plants to be offered to third parties at production cost; authorities point this out in the building permit process. Regierungsrat des Kantons Zürich – RRB Nr. 20/2024

Sustainability, water and climate

Domestic production fell 16.7% to 67.5 TWh in 2025. Hydropower supplied 55.5%, nuclear 27.2% and PV 11.8%; renewables in total were about 71% of production. BFE – Schweizerische Elektrizitätsstatistik 2025

The life-cycle emission factor of the Swiss consumer electricity mix (2020-2022) is 127 g CO2-eq/kWh, against 31.9 g CO2-eq/kWh for the supplier mix based on guarantees of origin. BFE – Umweltkennwerte 2024 der Strom- und Treibstoffbereitstellung

Operators in Switzerland

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
NorthC612.4 MW12 MW16%
Green6—12 MW—
Equinix5———
Digital Realty4—15 MW—
Vantage Data Centers240 MW24 MW51%
Vaultica26 MW—7.7%
Microsoft2———
NTT DATA120 MW—26%
Swisscom1———
Amazon Web Services1———
STACK Infrastructure1—30 MW—
Infomaniak1———
Global Technical Realty1—24 MW—

Largest data center projects in Switzerland

Under construction and planned facilities with a stated capacity, largest first. 81 MW under construction and 36 MW planned in total.

ProjectLocationStatusTypeCapacity
STACK ZUR02 BeringenSTACK Infrastructure Beringen Under construction Colocation 30 MW
Vantage Zurich II (ZRH2)Vantage Data Centers Glattfelden Planned Hyperscale 24 MW
GTR CH OneGlobal Technical Realty Zurich Under construction Colocation 24 MW
Digital Realty ZUR4Digital Realty Opfikon Under construction Colocation 15 MW
Green ZRH1 Lupfig fourth data centerGreen Lupfig Under construction Colocation 12 MW
Münchenstein (Basel) 3 – uptownBaselNorthC Arlesheim Planned Colocation 7.5 MW
Geneva – The HiveNorthC Meyrin Planned Colocation 4.5 MW

How Switzerland compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom207551,064 MW7,741 MW
Germany20364933 MW4,386 MW
Finland4824230 MW2,661 MW
France10920338 MW2,422 MW
Sweden4518172 MW2,510 MW
Ireland461953 MW1,458 MW
Italy2211245 MW1,193 MW
Norway228446 MW820 MW
Denmark361654.6 MW1,004 MW
Russia11121516 MW425 MW
Spain411979.4 MW815 MW
Netherlands11034217 MW449 MW

Facilities

33 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Vantage Zurich I (ZRH1) campusVantage Data Centers Cooling: Chilled water, dry coolers
History
  1. Operational
  2. Planned
Winterthur Operational 40 MW IT — Trade press
STACK ZUR02 BeringenSTACK Infrastructure Cooling: Hybrid
History
  1. Announced
  2. Under construction
Beringen Under construction 30 MW total — Operator / official
GTR CH OneGlobal Technical Realty
History
  1. Announced
  2. Under construction
Zurich Under construction 24 MW — Trade press
Vantage Zurich II (ZRH2)Vantage Data Centers Glattfelden Planned 24 MW IT — Operator / official
NTT Zurich 1 Data CenterNTT DATA Rümlang Operational 20 MW IT — Operator / official
Digital Realty ZUR4Digital Realty Opfikon Under construction 15 MW IT — Operator / official
Green ZRH1 Lupfig fourth data centerGreen
History
  1. Under construction
  2. Under construction
Lupfig Under construction 12 MW IT — Operator / official
Münchenstein (Basel) 3 – uptownBaselNorthC Arlesheim Planned 7.5 MW total — Operator / official
Münchenstein (Basel) 1NorthC Münchenstein Operational 6 MW total — Operator / official
Geneva – The HiveNorthC Meyrin Planned 4.5 MW IT — Operator / official
Biel (Bern)NorthC Cooling: Hybrid Biel/Bienne Operational 4 MW total — Operator / official
Vaultica GEN01 (GEN01A)Vaultica Plan-les-Ouates Operational 4 MW IT — Operator / official
Vaultica GEN02Vaultica Cooling: Hybrid Gland Operational 2 MW IT — Operator / official
Winterthur (Zurich)NorthC Winterthur Operational 1.8 MW total — Operator / official
Münchenstein (Basel) 2NorthC Münchenstein Operational 0.6 MW total — Operator / official
AWS Europe (Zurich) Region eu-central-2Amazon Web Services Leased in colocation: reportedly Green (Lupfig, fourth data center), Vantage (Winterthur) and Interxion/Digital Realty (Glattbrugg, ZUR3), per industry insiders; AWS Zurich Operational — 2022 Operator / official
Digital Realty ZUR1Digital Realty Opfikon Operational — — Operator / official
Digital Realty ZUR2Digital Realty Opfikon Operational — — Operator / official
Digital Realty ZUR3Digital Realty Opfikon Operational — — Operator / official
Equinix GV1Equinix Geneva Operational — — Operator / official
Equinix GV2Equinix Vernier Operational — — Operator / official
Equinix ZH2Equinix Zurich Operational — — Operator / official
Equinix ZH4Equinix Zurich Operational — — Operator / official
Equinix ZH5Equinix Oberengstringen Operational — — Operator / official
Green ZRH1 Lupfig campusGreen Lupfig Operational — — Operator / official
Green ZRH2 Dielsdorf campusGreen Dielsdorf Operational — — Operator / official
Green ZRH2 Dielsdorf third data centerGreen Dielsdorf Under construction — — Operator / official
Green ZRH3 SchlierenGreen Schlieren Operational — — Operator / official
Green ZRH4 GlattbruggGreen Opfikon Operational — — Operator / official
Infomaniak D4Infomaniak
History
  1. Operational
  2. Operational
Geneva Operational — 2025 Operator / official
Microsoft Switzerland North (Zurich)Microsoft Zurich Operational — 2019 Operator / official
Microsoft Switzerland West (Geneva)Microsoft Geneva Operational — 2019 Operator / official
Swisscom Bonvillars data centreSwisscom Bonvillars Operational — — Operator / official

Get the data

Every data center in Switzerland, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,555 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Switzerland

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Switzerland

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Switzerland?

DC Market Insights tracks 33 data centers in Switzerland as of November 2026: 25 operational, 5 under construction and 3 planned, run by 13 operators. The count grows as we verify more sites.

What is the data center capacity of Switzerland?

Tracked operational capacity in Switzerland is 78.4 MW, with 81 MW under construction and 36 MW planned. These totals use the capacity each source states (IT load where given) and cover 15 of 33 tracked facilities.

Which companies operate the most data center capacity in Switzerland?

By tracked operational capacity, the largest operators in Switzerland are Vantage Data Centers (40 MW), NTT DATA (20 MW) and NorthC (12.4 MW).

Where are the data centers in Switzerland located?

The largest clusters by tracked capacity are Zurich (21 facilities), Basel (3 facilities) and Geneva (7 facilities). The map above shows every site.

Which new data centers are being built in Switzerland?

We track 81 MW under construction and 36 MW planned. The largest projects are STACK ZUR02 Beringen (30 MW), Vantage Zurich II (ZRH2) (24 MW) and GTR CH One by Global Technical Realty (24 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.