Data Centers in Venezuela

Every data center in Venezuela that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 10 October 2026, DC Market Insights tracks 3 data centers in Venezuela run by 2 operators: 3 operational, 0 under construction and 0 planned.

3Facilities tracked
2Operators
—Operational (3 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 3 facilities have a stated capacity; the others are counted as sites only.

CAR1 · Cirion Technologies · Caracas (approximate location)Centro Tecnológico Daycohost · Daycohost · Valencia (approximate location)Daycohost Caracas · Daycohost · Caracas (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Venezuela data center market: key facts

  • Caracas is the largest cluster: 2 of 3 facilities and 0% of tracked capacity.
  • 0 of 3 facilities have a capacity stated by their source; the totals above count only those.

Market context

What shapes the Venezuela data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 22 October 2026. Government sources are linked; the full source list comes with the Excel data.

Electricity in Venezuela is a State reserve run by CORPOELEC, with tariffs set by the Ministry of Electric Energy. A 2026 reform to open generation to private investment passed first reading but stalled in October 2026. The grid is hydro-heavy (77% renewable generation in 2023) but unreliable, with crypto-mining disconnections in 2024 and public-sector load-saving hours in 2026. Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial 39.573), copy hosted by Ministerio del Poder Popular para la Defensa

Policy and incentives

Special Economic Zones law (Gaceta 6.710 Ext., 20 Jul 2022) offers import duty drawback and refunds of other national taxes to companies with an SEZ activity agreement; technology parks, telecoms, informatics and software are eligible sectors.

Foreign investments must register with a minimum contribution of EUR 800,000 (or CNY 6.5 million); incentives are set in individual investment contracts (Gaceta 41.310, 29 Dec 2017).

Ley de Infogobierno (17 Oct 2013) requires public bodies to use free software and open standards; proprietary software needs a CONATI exception of up to three years.

Crypto mining is regulated by the 2019 Constituent Decree on crypto-assets; miners must register with SUNACRIP.

Power and grid

The State reserves generation, transmission, distribution and commercialisation to the single operator (CORPOELEC); MPPEE runs dispatch (LOSSE Art. 8, Gaceta 39.573, 14 Dec 2010). Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial 39.573), copy hosted by Ministerio del Poder Popular para la Defensa

MPPEE designs the tariff scheme and must review system costs annually to decide on tariff adjustments; it may set targeted subsidies for productive sectors (LOSSE Arts. 59-66). No current official industrial tariff schedule was found. Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial 39.573), copy hosted by Ministerio del Poder Popular para la Defensa

Self-generation of 2 MW or more needs MPPEE habilitación and is for the producer's own use only (LOSSE Arts. 45-46). Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial 39.573), copy hosted by Ministerio del Poder Popular para la Defensa

Reform bill approved at first reading on 2 Jun 2026 would open generation and commercialisation to private investment under concessions and move to cost-reflective tariffs. Ministerio del Poder Popular para la Energía Eléctrica

Second reading of the electricity reform was postponed on 15 Oct 2026; acting president Delcy Rodríguez said no reform would pass this year.

In May 2024 MPPEE announced the disconnection of all crypto-mining farms from the national grid to relieve demand.

In August 2026 the public sector moved to reduced hours (alternate days, half days) to ease pressure on the grid.

Sustainability, water and climate

Renewables supplied 77% of electricity generation in 2023 (68,557 of 88,555 GWh), almost entirely hydro; solar 6 GWh and wind 16 GWh.

Users with demand above 2 MW must prepare and apply a plan for rational and efficient use of electricity (LOSSE). Ley Orgánica del Sistema y Servicio Eléctrico (Gaceta Oficial 39.573), copy hosted by Ministerio del Poder Popular para la Defensa

The 2026 reform bill would prioritise solar and wind projects to diversify supply. Ministerio del Poder Popular para la Energía Eléctrica

Operators in Venezuela

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Daycohost2———
Cirion Technologies1———

How Venezuela compares in Americas

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United States1,31517111,392 MW66,365 MW
Canada7818495 MW9,870 MW
Brazil16456493 MW2,645 MW
Mexico3710179 MW1,306 MW
Chile5019115 MW1,029 MW
Argentina151414.5 MW920 MW
Uruguay95—500 MW
Colombia291814.8 MW183 MW
Guatemala1082.9 MW52 MW
Peru201124.7 MW—
Ecuador1261 MW16 MW
Panama753.5 MW—

Facilities

3 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CAR1Cirion Technologies Caracas Operational — — Operator / official
Centro Tecnológico DaycohostDaycohost Valencia Operational — 2015 Trade press
Daycohost CaracasDaycohost Caracas Operational — — Trade press

Get the data

Every data center in Venezuela, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Venezuela

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Venezuela

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Venezuela?

DC Market Insights tracks 3 data centers in Venezuela as of October 2026: 3 operational, 0 under construction and 0 planned, run by 2 operators. The count grows as we verify more sites.

Where are the data centers in Venezuela located?

The largest clusters by tracked capacity are Caracas (2 facilities) and Valencia (1 facilities). The map above shows every site.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy