Data Center Power & Policy in Panama

Every government action on data centers and power in Panama that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 20 October 2026, DC Market Insights tracks 10 government actions on data centers and power in Panama, 9 of them in force. We have found no moratorium or restriction on new data centers in force in Panama. 1 incentive scheme applies: Law 32 of 5 April 2011: Free Zones regime, data centers an eligible high-technology category.

10Actions tracked
9In force
66.3 USD/MWhIndustrial power price
74.7%Renewable share of generation

Market snapshot

Panama power and policy: key facts

  • Industrial electricity price: 66.3 USD/MWh (2025). Rank 20 of 23 tracked countries, highest first.
  • Renewable share of electricity generation: 74.7% (2025). Rank 4 of 34 tracked countries, highest first.
  • Grid emission factor: 0.15 kgCO2/kWh (2024). Rank 22 of 28 tracked countries, highest first.
  • Latest change: ASEP Resolutions AN 21990-Elec and AN 21991-Elec: distribution tariff schedules 1 Sep 2026 – 31 Aug 2030 (ASEP, 19 Aug 2026).
  • By type: 3 regulation, 2 plan or strategy, 2 renewable energy and 1 power tariff.

Power indicators for Panama

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 66.3 USD/MWh 2025 · Annual average price of the wholesale occasional (spot) market, B/. 66.33/MWh (balboa at par with USD). A wholesale energy proxy for large customers (>100 kW) buying on the spot market; excludes transmission, distribution and capacity charges. Retail MTD ASEP – Estadisticas Electricas 2025, 2do semestre, Mercado
Renewable share of electricity generation 74.7% 2025 · Hydro 59.78% + wind 5.27% + solar PV 9.64% of national generation in 2025 (thermal 25.31%), as stated by ASEP. ASEP – Estadisticas Electricas 2025, 2do semestre, Oferta
Grid emission factor 0.15 kgCO2/kWh 2024 · Official inventory (carbon footprint) factor 0.1501 tCO2/MWh = kgCO2/kWh: 1,965,515.67 tCO2 over 13,096,662 MWh net generation. CDM combined margin is 0.4438 (conventional) / 0.4932 (wind/solar). National Energy Secretariat, Res. MIPRE-2025-0030765, Annex A (GO 30348)
Installed generation capacity 5.12 GW 2025 · 5,120.19 MW total: 4,574.14 MW public-service plants, 493.72 MW self-generators, 52.33 MW isolated systems; hydro 1,847.57, thermal 2,165.97, wind 336, PV 770.65 MW. ASEP – Estadisticas Electricas 2025, Oferta

In force now in Panama

Grid access (1)

  • Grid accessIn force

    ASEP Distribution and Commercialization Regulation, Title II Art. 5: large-customer threshold of 100 kW

    Using its power under Law 6 of 1997, ASEP lowered the large-customer threshold to demand above 100 kW per interconnection point or site. Any user above this level, which covers practically every data center, can leave the regulated tariff and contract supply directly with generators or buy in the wholesale spot market. Further changes to the threshold are made at the four-yearly tariff reviews or when distribution concessions are renewed.

    100 kW Date is ASEP Res. AN 5910-Elec (23 Jan 2013), which quotes Art. 5; the current RDC Title II text with the same rule is at https://www.asep.gob.pa/wp-content/uploads/electricidad/tarifas/07_reglamentos_normas/reglamento_distribucion_comercializacion/titulo

    ASEP (Autoridad Nacional de los Servicios Publicos) · ASEP Resolucion AN No. 5910-Elec of 23 Jan 2013, quoting Art. 5 of the Reglamento de Distribucion y Comercializacion

Power tariff (1)

  • Power tariffIn force

    ASEP Resolutions AN 21990-Elec and AN 21991-Elec: distribution tariff schedules 1 Sep 2026 – 31 Aug 2030

    On 19 Aug 2026 ASEP approved the distribution and commercialization tariff schedules (pliegos tarifarios) of ENSA (AN 21990-Elec) and EDEMET and EDECHI (AN 21991-Elec, G.O. 30595 B of 21 Aug 2026) for a new four-year period from 1 Sep 2026 to 31 Aug 2030. From 1 Sep 2026 the medium-voltage demand tariff (MTD) charges 0.145-0.162 USD/kWh plus 15-26 USD/kW-month of maximum demand, depending on the distributor.

    ASEP · Effective 1 Sep 2026 · ASEP – Resolucion AN No. 21991-Elec de 2026-08-19

Incentive (1)

  • IncentiveIn force

    Law 32 of 5 April 2011: Free Zones regime, data centers an eligible high-technology category

    The free-zone law lists the types of company that may set up in a free zone. Category 4, high-technology company, expressly includes data processing and storage centres (data centers), and category 7, services company, covers telecom and computer services for data capture, processing, storage and transmission. Data centers can therefore operate under the free-zone tax and customs regime, licensed through MICI.

    Ministry of Commerce and Industries (MICI); National Free Zones Commission · MICI – Categorias de empresas, Licencia de empresas establecidas en Zonas Francas

Renewable energy (2)

  • Renewable energyIn force

    Law 37 of 10 June 2013: solar plant incentive regime (amended by Laws 38/2016 and 417/2023), equipment list updated March 2026

    Incentive regime for building, operating and maintaining solar plants and installations, with no quantity limit, including a customs exemption on listed solar equipment (Art. 20). On 12 Mar 2026 the National Energy Secretariat and MEF approved a new list of eligible equipment and accessories (Res. MIPRE-2026-0008960, GO 30481-A), replacing the January 2025 list. Supports on-site or contracted solar for data centers.

    National Assembly; National Energy Secretariat; Ministry of Economy and Finance · Gaceta Oficial 30481-A (12 Mar 2026) – Resolucion MIPRE-2026-0008960

  • Renewable energyIn force

    Law 45 of 4 August 2004: incentives for hydro and other new, renewable and clean generation

    Gives hydro, geothermal and other new renewable plants an import duty and ITBMS exemption on equipment and a tax credit of up to 25% of direct investment, based on CO2 avoided, usable against income tax for 10 years. Plants of 10-20 MW pay no distribution or transmission charges on the first 10 MW for 10 years, and plants up to 10 MW may sell directly to distributors. Relevant to contracted or own renewable supply for data centers.

    25 % of direct investment (maximum fiscal i

    Legislative Assembly · Effective 10 Aug 2004

Regulation (3)

  • RegulationIn force

    Resolution MIPRE-2025-0030765: official baseline grid emission factor of the national power system (2024)

    The National Energy Secretariat set official grid emission factors for environmental assessment, energy planning, GHG inventories and decarbonisation strategies. For 2024 data: inventory (carbon footprint) factor 0.1501 tCO2/MWh; CDM combined margin 0.4438 tCO2/MWh for conventional projects and 0.4932 for wind and solar. Published in GO 30348 on 21 Aug 2025. A 2025 update (Res. MIPRE-2026-0031065, GO 30586, Aug 2026) exists but was not readable.

    0.15 tCO2/MWh (inventory factor, 2024)

    National Energy Secretariat · Effective 21 Aug 2025 · MiAmbiente climate transparency portal – copy of GO 30348

  • RegulationIn force

    Law 81 of 26 March 2019 on personal data protection: cross-border storage and transfer

    Databases located in Panama, or whose controller is domiciled there, fall under the law. Cross-border storage or transfer of confidential, sensitive or restricted personal data that originated or is stored in Panama is allowed only if the custodian meets the law's protection standards or equivalent or higher ones, with exceptions such as consent, contract necessity and treaty obligations. ANTAI supervises. The law took effect two years after promulgation (March 2021) and is regulated by Executive Decree 285 of 2021. No general data-localization rule.

    National Assembly; ANTAI (supervisor) · Effective 29 Mar 2021 · Ley 81 de 2019 (copy hosted by SINAPROC)

  • RegulationIn force

    Law 6 of 1997: electricity sector regulatory and institutional framework (single text ordered by Law 194 of 2020)

    Panama's electricity framework law sets the regime for generation, transmission, distribution and sale, gives ETESA the expansion plan and long-term supply contracting, and creates the wholesale market agents. Large customers (grandes clientes) may contract their supply freely with other market agents; the law sets the threshold at a maximum demand above 500 kW per site and lets the regulator ASEP lower it. A single consolidated text was gazetted on 7 Jul 2021 (GO 29325-A).

    500 kW (statutory large-customer threshold)

    National Assembly; ASEP (regulator) · Gaceta Oficial 29325-A – Texto Unico Ley 6 de 1997 (copy hosted by CND)

Plan or strategy (1)

  • Plan or strategyIn force

    Energy Transition Agenda 2020-2030: strategic guidelines (Cabinet Resolution 93 of 24 Nov 2020)

    The Cabinet approved the strategic guidelines of the Energy Transition Agenda 2020-2030 on 24 Nov 2020. They aim to attract investment to the power sector, improve competitiveness, extend electrification and back renewables and a modern, smart distribution grid. Gazette text (GO 29163-B) not retrievable; source is press.

    Cabinet Council; National Energy Secretariat

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Plan or strategyProposed

    National AI Strategy (SENACYT): sustainable zones for data centers and sovereign compute

    SENACYT's AI strategy presentation proposes, under an energy-sovereignty pillar, grid reinforcement without passing costs to other consumers and territorial planning of sustainable zones for data centers with simpler permitting, access to infrastructure and safeguards against speculative capacity reservations. It also proposes backup power and water reservoirs for AI infrastructure while protecting water for people and Canal operations, a sovereign cloud and Tier III/IV commercial data centers. No Cabinet resolution or gazette text found.

    SENACYT (National Secretariat of Science, Technology and Innovation)

Timeline of data center and power policy in Panama

DateActionTypeStatusAuthority
19 Aug 2026ASEP Resolutions AN 21990-Elec and AN 21991-Elec: distribution tariff schedules 1 Sep 2026 – 31 Aug 2030Power tariffIn forceASEP
1 Aug 2026National AI Strategy (SENACYT): sustainable zones for data centers and sovereign computePlan or strategyProposedSENACYT (National Secretariat of Science, Technology and Innovation)
20 Aug 2025Resolution MIPRE-2025-0030765: official baseline grid emission factor of the national power system (2024)RegulationIn forceNational Energy Secretariat
24 Nov 2020Energy Transition Agenda 2020-2030: strategic guidelines (Cabinet Resolution 93 of 24 Nov 2020)Plan or strategyIn forceCabinet Council; National Energy Secretariat
26 Mar 2019Law 81 of 26 March 2019 on personal data protection: cross-border storage and transferRegulationIn forceNational Assembly; ANTAI (supervisor)
10 Jun 2013Law 37 of 10 June 2013: solar plant incentive regime (amended by Laws 38/2016 and 417/2023), equipment list updated March 2026Renewable energyIn forceNational Assembly; National Energy Secretariat; Ministry of Economy and Finance
23 Jan 2013ASEP Distribution and Commercialization Regulation, Title II Art. 5: large-customer threshold of 100 kWGrid accessIn forceASEP (Autoridad Nacional de los Servicios Publicos)
5 Apr 2011Law 32 of 5 April 2011: Free Zones regime, data centers an eligible high-technology categoryIncentiveIn forceMinistry of Commerce and Industries (MICI); National Free Zones Commission
4 Aug 2004Law 45 of 4 August 2004: incentives for hydro and other new, renewable and clean generationRenewable energyIn forceLegislative Assembly
3 Feb 1997Law 6 of 1997: electricity sector regulatory and institutional framework (single text ordered by Law 194 of 2020)RegulationIn forceNational Assembly; ASEP (regulator)

How Panama compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)20
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Peru—62.6% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—00
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10

Questions

Is there a data center moratorium in Panama?

We have found no moratorium or restriction on new data centers in force in Panama as of 20 October 2026. Proposed or announced measures, if any, are listed in the timeline.

What incentives does Panama offer data centers?

In force: Law 32 of 5 April 2011: Free Zones regime, data centers an eligible high-technology category. Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Panama?

The industrial electricity price in Panama was 66.3 USD/MWh in 2025 (Annual average price of the wholesale occasional (spot) market, B/. 66.33/MWh (balboa at par with USD). A wholesale energy proxy for large customers (>100 kW) buying on the spot market; excludes transmission, distribution and capacity charges. Retail MTD ). Data center contracts can differ by voltage level, contract length and location.

How much of Panama’s electricity is renewable?

Renewables supplied 74.7% of electricity generation in Panama in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.