How much data center capacity Spain has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.
Spain data center capacity at a glance
Spain had about 0.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 3% of the capacity in Europe and puts Spain at number 20 of the 33 countries in our global model. Our Data Center Tracker holds 41 sites in Spain run by 19 operators: 20 operational, 3 under construction and 18 planned. Our trackers also hold 18 verified deals and 11 government measures in force for the country.
Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.
What our tracker holds for Spain
Largest tracked sites
| Site | Operator | City | Status | MW |
|---|---|---|---|---|
| Tillion Aragón campus | Tillion | Villamayor de Gállego | Planned | 300 |
| Green It Aragón campus (Ribera Alta del Ebro) | Grupo SAMCA | Luceni | Planned | 216 IT |
| ACS DC La Puebla | ACS | La Puebla de Alfindén | Planned | 100 IT |
| Ark Barcelona campus (La Maquinista) | Ark Data Centres | Barcelona | Under construction | 65 IT |
| Data4 MAD01 Alcobendas | Data4 | Alcobendas | Operational | 50 |
| Data4 MAD02 San Agustín del Guadalix | Data4 | San Agustín del Guadalix | Planned | 50 |
| Prime MAD01-01 Madrid | Prime Data Centers | Alcobendas | Planned | 40 IT |
| AtlasEdge BCN002 | AtlasEdge | Sant Joan Despi | Planned | 24 IT |
| CyrusOne MAD1 Madrid | CyrusOne | Alcobendas | Operational | 18 IT |
| Iron Mountain MAD-2 | Iron Mountain | San Fernando de Henares | Planned | 10 IT |
Where the sites are
| City | Sites | Operators | MW stated, live |
|---|---|---|---|
| Alcobendas | 7 | 4 | 68 |
| Madrid | 5 | 3 | n/a |
| Barcelona | 3 | 3 | 8 |
| San Fernando de Henares | 3 | 1 | 3 |
| Arasur | 3 | 1 | n/a |
| Zaragoza | 2 | 2 | n/a |
| Villanueva de Gállego | 2 | 1 | n/a |
| Villamayor de Gállego | 2 | 2 | n/a |
Cities with the most tracked sites. MW only where a source states it.
Who runs them
| Operator | Sites | MW live | MW pipeline |
|---|---|---|---|
| Tillion | 1 | n/a | 300 |
| Grupo SAMCA | 1 | n/a | 216 |
| Data4 | 2 | 50 | 50 |
| ACS | 1 | n/a | 100 |
| Ark Data Centres | 1 | n/a | 65 |
| Prime Data Centers | 1 | n/a | 40 |
| AtlasEdge | 1 | n/a | 24 |
| Iron Mountain | 3 | 3 | 20 |
Operators ranked by MW stated at their tracked sites in Spain.
Power context
- Industrial power price, 2025113.4 USD/MWh · Eurostat nrg_pc_205
Rules in force
- GridData centre grid-access capacity renounced after RDL 7/2026 measures
- GridData centre grid-access permits granted
- GridData centre grid-access requests denied
- GridData centre grid-access queue: requests in process
- GridRoyal Decree-law 7/2026: capacity-reservation charge, CNAE code and high-priority demand for grid access
From government sources. Power and policy in Spain
Recent deals
- Sep 2026 · Land / campusHSCALE hyperscale campus in a metropolitan area on the Iberian Peninsula, USD 1.0 bn
- Aug 2026 · Land / campus160MW data center campus (two 80MW buildings), Torrelobatón, Valladolid, 160 MW
- Aug 2026 · JV / partnershipData center project with adjacent solar PV plant, Segovia
- Aug 2026 · Land / campusDigital Valley Asturias data center campus (ten modules), Nonaya Este industrial park, Salas, 120 MW, USD 1.4 bn
- Jul 2026 · JV / partnershipNew data centre near PLAZA, Zaragoza, USD 23 m
- Jul 2026 · Land / campusData centre campus near Alicante-Elche airport, 60 MW, USD 342 m
Other countries in Europe
- Germany3.0 GW
- United Kingdom1.9 GW
- Netherlands1.5 GW
- Ireland1.4 GW
- France1.2 GW
- Italy0.8 GW
- Sweden0.5 GW
- Norway0.5 GW
- Poland0.2 GW
Installed capacity, end 2025, DC Market Insights estimate. All countries and regions
Spain in the full data pack
By year to 2035
Installed MW for Spain from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.
Leading hubs
Live and pipeline MW for the main metro markets, with the basis of each figure.
Every tracked site
The full site list with operator, location, status, MW and source, refreshed from our tracker.
Related research on Spain
Frequently asked questions
How much data center capacity does Spain have?
We estimate about 0.5 GW of installed data center capacity (IT load) in Spain at the end of 2025, about 3% of Europe and number 20 of the 33 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.
How many data centers are there in Spain?
Our Data Center Tracker lists 41 sites in Spain (20 operational, 3 under construction, 18 planned), run by 19 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.
Which companies have the most tracked data center capacity in Spain?
By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Tillion, Grupo SAMCA, Data4. Site capacity is counted only where a source states it.
What rules apply to data centers in Spain?
Our Power and Policy Tracker lists 11 government measures in force for Spain, such as incentives, tariffs, grid rules and national plans, each linked to the official source.
How will Spain data center capacity grow to 2035?
The full data pack gives installed capacity for Spain by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.