Norway Data Center Capacity

Installed data center capacity in Norway (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity Norway has installed, how it compares with the rest of Europe, and what our trackers show about its sites, operators, deals and rules.

0.5 GWInstalled, end 2025IT load, DC Market Insights estimate
3%Share of Europe2025
#22Rank among 26 countriesInstalled capacity, 2025
1Sites in our tracker0 with a stated MW

Norway data center capacity at a glance

Norway had about 0.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 3% of the capacity in Europe and puts Norway at number 22 of the 26 countries in our global model. Our Data Center Tracker holds 1 sites in Norway run by 1 operators: 0 operational, 0 under construction and 1 planned. Our trackers also hold 9 verified deals and 0 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

What our tracker holds for Norway

0 MWStated at operational sites (0)
0 MWUnder construction (0 sites)
0 MWPlanned (1 sites)
1Operators

Every Norway site on the Data Center Map

Where the sites are

CitySitesOperatorsMW stated, live
Skien11n/a

Cities with the most tracked sites. MW only where a source states it.

Who runs them

OperatorSitesMW liveMW pipeline
Google1n/an/a

Operators ranked by MW stated at their tracked sites in Norway.

Recent deals

  • Sep 2026 · Land / campusTitan Group AS and its data center site in Moskog, Sunnfjord
  • Sep 2026 · FinancingAsp Data Center K11 data center, Stavanger (incl. refinancing of NOK 685m bond), USD 170 m
  • Aug 2026 · JV / partnershipPilot AI data center powered by Zephyros-One floating wind turbine off Norway, 1 MW
  • Aug 2026 · Land / campusGiga Arctic site conversion to 50MW data center, Mo i Rana, 50 MW
  • Aug 2026 · JV / partnership1MW AI data center in former Bankenes Betalingssentral building, Oslo, 1 MW
  • Jul 2026 · Land / campusDRA02, Drangedal, 40 MW

Deal Tracker

Other countries in Europe

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

Norway in the full data pack

By year to 2035

Installed MW for Norway from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does Norway have?

We estimate about 0.5 GW of installed data center capacity (IT load) in Norway at the end of 2025, about 3% of Europe and number 22 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How many data centers are there in Norway?

Our Data Center Tracker lists 1 sites in Norway (0 operational, 0 under construction, 1 planned), run by 1 operators. Each site is verified from operator, planning or utility sources; the list grows as new sites are confirmed.

Which companies have the most tracked data center capacity in Norway?

By capacity stated at their sites (operational plus pipeline), the largest in our tracker are Google. Site capacity is counted only where a source states it.

How will Norway data center capacity grow to 2035?

The full data pack gives installed capacity for Norway by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.