In short
As of 26 November 2026, DC Market Insights tracks 12 government actions on data centers and power in Norway, 6 of them in force. Norway has 1 restriction on new data centers in force: Statnett temporary halt on new grid-connection reservations for data centres.
Market snapshot
Norway power and policy: key facts
- Industrial electricity price: 100 USD/MWh (2026). Rank 19 of 32 tracked countries, highest first.
- Renewable share of electricity generation: 96% (2025). Rank 3 of 45 tracked countries, highest first.
- Grid emission factor: 0.01 kgCO2/kWh (2025). Rank 38 of 38 tracked countries, highest first.
- Latest change: Government plan for controlled growth of socially beneficial data centres (licensing regime) (Ministry of Digitalisation and Public Governance; Ministry of Energy, 10 Nov 2026).
- By type: 4 power tariff, 2 plan or strategy, 2 efficiency rule and 1 moratorium.
Power indicators for Norway
Latest official figure for each indicator, with earlier years where we have them.
In force now in Norway
Moratorium (1)
Statnett temporary halt on new grid-connection reservations for data centres
Statnett stopped new grid-connection reservations for data centres on 9 Nov 2026, and stopped processing facility-functionality approvals (fos § 14), including pending applications for direct 420 kV connections, until it has set functional requirements for data centres (ride-through, ramping), which go to consultation and need RME approval. The halt is expected to be lifted no later than 1 Aug 2027.
Grid access (1)
Grid connection rules: first-in-time allocation, maturity assessment and capacity hold-back (NEM §§ 3-2a, 3-4)
Grid capacity in Norway is allocated continuously on a first-in-time basis; grid companies assess project maturity (NEM § 3-4) and must hold back capacity for consumption customers (NEM § 3-2a). Customers whose connection triggers grid investment generally pay connection charges (anleggsbidrag).
Power tariff (1)
Data centres pay the ordinary electricity tax; reduced rate for data centres repealed in 2023
Norway introduced a reduced electricity tax rate for data centres drawing over 5 MW in 2016 (threshold later lowered to 0.5 MW). The reduced rate was repealed in 2023 (Prop. 1 LS 2022-2023). In 2026 data centres pay the ordinary rate of 7.13 øre/kWh, like most other businesses; manufacturing keeps the reduced rate of 0.60 øre/kWh.
7.13 øre/kWh 2026 ordinary electricity tax rate paid by data centres; excl. VAT
Efficiency rule (1)
Surplus-heat cost-benefit analysis duty for data centres above 2 MW (Energy Act ch. 7)
An amendment to the Energy Act (Lovvedtak 68 (2022-2023), law of 16 Jun 2023) requires planners of data centres with more than 2 MW total supplied electrical power to carry out a cost-benefit analysis of using surplus heat, so that surplus heat covers economically justified demand.
2 MW threshold: total supplied electrical power
Regulation (1)
Data centre regulation: mandatory registration with Nkom
Under the data centre regulation (datasenterforskriften) adopted under the Electronic Communications Act, data centre operators must register with the Norwegian Communications Authority (Nkom) before starting operations and report changes. In force 1 Jan 2025; existing operators had to register by 1 Jul 2025. Nkom reported 58 registered data centres by the deadline.
Plan or strategy (1)
National data centre strategy 2025: a sustainable industry of the future for digital Norway
The Government's 2025 data centre strategy (replacing the 2018 and 2021 strategies) sets objectives for a sustainable, socio-economically beneficial and secure data centre industry, including security requirements in peace, crisis and war, and points to Norway's renewable power as a siting advantage.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Government plan for controlled growth of socially beneficial data centres (licensing regime)
The Government intends to introduce a licensing regime for both existing and future data centres, give priority to power use that is necessary for social development, set requirements for responsible grid connection, modernise the connection obligation and raise cost contributions to the grid from large new consumers. Crypto-related data centres will not be regarded as beneficial to society. Main principles of the licensing regime are due in autumn 2027.
2027 state budget: electricity tax ordinary rate 7.32 øre/kWh proposed
The Government's 2027 tax proposal (Prop. 1 LS 2026-2027) raises the ordinary electricity tax rate, paid by data centres, from 7.13 to 7.32 øre/kWh (+2.7%); the reduced rate for manufacturing stays at 0.60 øre/kWh. Subject to Stortinget's budget vote.
7.32 øre/kWh
Statnett transmission tariff 2027: fixed charge 330 NOK/kW, large-consumer reduction cut to 45% and phased to 20% by 2030
Statnett's 2027 transmission tariff raises the consumption fixed charge to 330 NOK/kW (135 in 2026); customers drawing over 15 MW and over 100 GWh/yr pay 181.5 NOK/kW (67.5 in 2026) as the large-consumption reduction falls from 50% to 45% in 2027, then 40% (2028), 30% (2029) and 20% (2030). A new capacity charge for all consumers starts in 2027 at max 10% of the fixed-charge rate.
330 NOK/kW/year consumption fixed charge 2027 per statnett.no 'This year's tariff' page (updated 28 Sep 2026)
Energy Act amendment 2026: surplus-heat thresholds moved to regulation, data centre exemption removed
Prop. 45 L (2025-2026), adopted by Stortinget (Innst. 277 L), moves the surplus-heat thresholds from the Energy Act into a regulation and removes the current exemption for data centres in § 7-4; the consultation proposed lowering the data centre threshold from 2 MW to 1 MW. In-force date to be set by the King.
Planned temporary national ban on new crypto-mining data centres (state planning provision)
The Government is preparing a state planning provision under the Planning and Building Act for a temporary, limited ban on new power-intensive crypto data centres; in March 2026 Stortinget asked the Government to come back with a proposal to ban crypto data centres. No adoption found as of Nov 2026.
Timeline of data center and power policy in Norway
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 10 Nov 2026 | Government plan for controlled growth of socially beneficial data centres (licensing regime) | Plan or strategy | Announced | Ministry of Digitalisation and Public Governance; Ministry of Energy |
| 9 Nov 2026 | Statnett temporary halt on new grid-connection reservations for data centres | Moratorium | In force | Statnett SF (transmission system operator) |
| 2 Oct 2026 | 2027 state budget: electricity tax ordinary rate 7.32 øre/kWh proposed | Power tariff | Proposed | Ministry of Finance |
| 28 Sep 2026 | Statnett transmission tariff 2027: fixed charge 330 NOK/kW, large-consumer reduction cut to 45% and phased to 20% by 2030 | Power tariff | Announced | Statnett SF |
| 1 Sep 2026 | Grid connection rules: first-in-time allocation, maturity assessment and capacity hold-back (NEM §§ 3-2a, 3-4) | Grid access | In force | RME (Norwegian Energy Regulatory Authority) |
| 19 Jun 2026 | Energy Act amendment 2026: surplus-heat thresholds moved to regulation, data centre exemption removed | Efficiency rule | Announced | Stortinget; Ministry of Energy |
| 19 Feb 2026 | Data centres pay the ordinary electricity tax; reduced rate for data centres repealed in 2023 | Power tariff | In force | Ministry of Finance (letter to Stortinget) |
| 3 Feb 2026 | Proposal to study a higher electricity tax rate for data centres (Dok 8:105 S) not adopted | Power tariff | Withdrawn | Stortinget (Finance Committee) |
| 16 Dec 2025 | Planned temporary national ban on new crypto-mining data centres (state planning provision) | Restriction | Proposed | Ministry of Digitalisation and Public Governance; Ministry of Local Government |
| 7 Oct 2025 | National data centre strategy 2025: a sustainable industry of the future for digital Norway | Plan or strategy | In force | Ministry of Digitalisation and Public Governance |
| 18 Dec 2024 | Data centre regulation: mandatory registration with Nkom | Regulation | In force | Ministry of Digitalisation and Public Governance; Nkom |
| 16 Jun 2023 | Surplus-heat cost-benefit analysis duty for data centres above 2 MW (Energy Act ch. 7) | Efficiency rule | In force | Stortinget; Ministry of Energy |
How Norway compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Morocco | — | 27% (2024) | — | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Norway | 100 USD/MWh (2026) | 96% (2025) | 0.01 kgCO2/kWh (2025) | 1 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Africa | — | 9% (2024) | — | 1 | 1 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| Türkiye | 70.3 USD/MWh (2026) | — | 0.44 kgCO2/kWh (2022) | 1 | 1 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in Norway?
Yes. 1 restriction on new data centers is in force in Norway: Statnett temporary halt on new grid-connection reservations for data centres.
What does electricity cost for data centers in Norway?
The industrial electricity price in Norway was 100 USD/MWh in 2026 (SSB Q3 2026 electricity price, manufacturing excl. energy-intensive manufacturing, 104.3 øre/kWh excl. taxes and grid rent (energy only) = 1,043 NOK/MWh; converted at Norges Bank 2025 annual average 10.3912 NOK/USD (latest full-year rate). Energy-intensiv). Data center contracts can differ by voltage level, contract length and location.
How much of Norway’s electricity is renewable?
Renewables supplied 96% of electricity generation in Norway in 2025.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity does Norway have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.