Data Center Power & Policy in Norway

Every government action on data centers and power in Norway that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 26 November 2026, DC Market Insights tracks 12 government actions on data centers and power in Norway, 6 of them in force. Norway has 1 restriction on new data centers in force: Statnett temporary halt on new grid-connection reservations for data centres.

12Actions tracked
6In force
100 USD/MWhIndustrial power price
96%Renewable share of generation

Market snapshot

Norway power and policy: key facts

  • Industrial electricity price: 100 USD/MWh (2026). Rank 19 of 32 tracked countries, highest first.
  • Renewable share of electricity generation: 96% (2025). Rank 3 of 45 tracked countries, highest first.
  • Grid emission factor: 0.01 kgCO2/kWh (2025). Rank 38 of 38 tracked countries, highest first.
  • Latest change: Government plan for controlled growth of socially beneficial data centres (licensing regime) (Ministry of Digitalisation and Public Governance; Ministry of Energy, 10 Nov 2026).
  • By type: 4 power tariff, 2 plan or strategy, 2 efficiency rule and 1 moratorium.

Power indicators for Norway

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 100 USD/MWh 2026 · SSB Q3 2026 electricity price, manufacturing excl. energy-intensive manufacturing, 104.3 øre/kWh excl. taxes and grid rent (energy only) = 1,043 NOK/MWh; converted at Norges Bank 2025 annual average 10.3912 NOK/USD (latest full-year rate). Energy-intensiv Statistics Norway (SSB), Electricity prices, Q3 2026
Renewable share of electricity generation 96% 2025 · Share of Norwegian electricity consumption covered by power from renewable sources in 2025 (NVE electricity disclosure, physical mix), as stated. NVE press release (via NTB), 3 Jul 2026
Grid emission factor 0.01 kgCO2/kWh 2025 · 9.4 g CO2e/kWh average emissions from electricity use in Norway 2025 (NVE physical delivery), = 0.0094 kgCO2/kWh. NVE press release (via NTB), 3 Jul 2026

In force now in Norway

Moratorium (1)

  • MoratoriumIn force

    Statnett temporary halt on new grid-connection reservations for data centres

    Statnett stopped new grid-connection reservations for data centres on 9 Nov 2026, and stopped processing facility-functionality approvals (fos § 14), including pending applications for direct 420 kV connections, until it has set functional requirements for data centres (ride-through, ramping), which go to consultation and need RME approval. The halt is expected to be lifted no later than 1 Aug 2027.

    Statnett SF (transmission system operator) · Effective 9 Nov 2026

Grid access (1)

  • Grid accessIn force

    Grid connection rules: first-in-time allocation, maturity assessment and capacity hold-back (NEM §§ 3-2a, 3-4)

    Grid capacity in Norway is allocated continuously on a first-in-time basis; grid companies assess project maturity (NEM § 3-4) and must hold back capacity for consumption customers (NEM § 3-2a). Customers whose connection triggers grid investment generally pay connection charges (anleggsbidrag).

    RME (Norwegian Energy Regulatory Authority) · RME Høringsdokument 3/2026

Power tariff (1)

  • Power tariffIn force

    Data centres pay the ordinary electricity tax; reduced rate for data centres repealed in 2023

    Norway introduced a reduced electricity tax rate for data centres drawing over 5 MW in 2016 (threshold later lowered to 0.5 MW). The reduced rate was repealed in 2023 (Prop. 1 LS 2022-2023). In 2026 data centres pay the ordinary rate of 7.13 øre/kWh, like most other businesses; manufacturing keeps the reduced rate of 0.60 øre/kWh.

    7.13 øre/kWh 2026 ordinary electricity tax rate paid by data centres; excl. VAT

    Ministry of Finance (letter to Stortinget) · Stortinget Innst. 183 S (2025-2026), vedlegg: Finance Minister's letter on Dok 8:105 S

Efficiency rule (1)

  • Efficiency ruleIn force

    Surplus-heat cost-benefit analysis duty for data centres above 2 MW (Energy Act ch. 7)

    An amendment to the Energy Act (Lovvedtak 68 (2022-2023), law of 16 Jun 2023) requires planners of data centres with more than 2 MW total supplied electrical power to carry out a cost-benefit analysis of using surplus heat, so that surplus heat covers economically justified demand.

    2 MW threshold: total supplied electrical power

    Stortinget; Ministry of Energy · Stortinget Lovvedtak 68 (2022-2023)

Regulation (1)

  • RegulationIn force

    Data centre regulation: mandatory registration with Nkom

    Under the data centre regulation (datasenterforskriften) adopted under the Electronic Communications Act, data centre operators must register with the Norwegian Communications Authority (Nkom) before starting operations and report changes. In force 1 Jan 2025; existing operators had to register by 1 Jul 2025. Nkom reported 58 registered data centres by the deadline.

    Ministry of Digitalisation and Public Governance; Nkom · Effective 1 Jan 2025 · Datasenterforskrift vedtatt 18. desember 2024

Plan or strategy (1)

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Plan or strategyAnnounced

    Government plan for controlled growth of socially beneficial data centres (licensing regime)

    The Government intends to introduce a licensing regime for both existing and future data centres, give priority to power use that is necessary for social development, set requirements for responsible grid connection, modernise the connection obligation and raise cost contributions to the grid from large new consumers. Crypto-related data centres will not be regarded as beneficial to society. Main principles of the licensing regime are due in autumn 2027.

    Ministry of Digitalisation and Public Governance; Ministry of Energy · regjeringen.no: Government seeks controlled growth of data centres in Norway

  • Power tariffProposed

    2027 state budget: electricity tax ordinary rate 7.32 øre/kWh proposed

    The Government's 2027 tax proposal (Prop. 1 LS 2026-2027) raises the ordinary electricity tax rate, paid by data centres, from 7.13 to 7.32 øre/kWh (+2.7%); the reduced rate for manufacturing stays at 0.60 øre/kWh. Subject to Stortinget's budget vote.

    7.32 øre/kWh

    Ministry of Finance · Effective 1 Jan 2027 · Prop. 1 LS (2026-2027) Skatter og avgifter 2027, Tabell 1.6

  • Power tariffAnnounced

    Statnett transmission tariff 2027: fixed charge 330 NOK/kW, large-consumer reduction cut to 45% and phased to 20% by 2030

    Statnett's 2027 transmission tariff raises the consumption fixed charge to 330 NOK/kW (135 in 2026); customers drawing over 15 MW and over 100 GWh/yr pay 181.5 NOK/kW (67.5 in 2026) as the large-consumption reduction falls from 50% to 45% in 2027, then 40% (2028), 30% (2029) and 20% (2030). A new capacity charge for all consumers starts in 2027 at max 10% of the fixed-charge rate.

    330 NOK/kW/year consumption fixed charge 2027 per statnett.no 'This year's tariff' page (updated 28 Sep 2026)

    Statnett SF · Effective 1 Jan 2027

  • Efficiency ruleAnnounced

    Energy Act amendment 2026: surplus-heat thresholds moved to regulation, data centre exemption removed

    Prop. 45 L (2025-2026), adopted by Stortinget (Innst. 277 L), moves the surplus-heat thresholds from the Energy Act into a regulation and removes the current exemption for data centres in § 7-4; the consultation proposed lowering the data centre threshold from 2 MW to 1 MW. In-force date to be set by the King.

    Stortinget; Ministry of Energy · Stortinget Innst. 277 L (2025-2026)

  • RestrictionProposed

    Planned temporary national ban on new crypto-mining data centres (state planning provision)

    The Government is preparing a state planning provision under the Planning and Building Act for a temporary, limited ban on new power-intensive crypto data centres; in March 2026 Stortinget asked the Government to come back with a proposal to ban crypto data centres. No adoption found as of Nov 2026.

    Ministry of Digitalisation and Public Governance; Ministry of Local Government · Stortinget Innst. 140 S (2025-2026), vedlegg: letter from Minister Karianne Tung

Timeline of data center and power policy in Norway

DateActionTypeStatusAuthority
10 Nov 2026Government plan for controlled growth of socially beneficial data centres (licensing regime)Plan or strategyAnnouncedMinistry of Digitalisation and Public Governance; Ministry of Energy
9 Nov 2026Statnett temporary halt on new grid-connection reservations for data centresMoratoriumIn forceStatnett SF (transmission system operator)
2 Oct 20262027 state budget: electricity tax ordinary rate 7.32 øre/kWh proposedPower tariffProposedMinistry of Finance
28 Sep 2026Statnett transmission tariff 2027: fixed charge 330 NOK/kW, large-consumer reduction cut to 45% and phased to 20% by 2030Power tariffAnnouncedStatnett SF
1 Sep 2026Grid connection rules: first-in-time allocation, maturity assessment and capacity hold-back (NEM §§ 3-2a, 3-4)Grid accessIn forceRME (Norwegian Energy Regulatory Authority)
19 Jun 2026Energy Act amendment 2026: surplus-heat thresholds moved to regulation, data centre exemption removedEfficiency ruleAnnouncedStortinget; Ministry of Energy
19 Feb 2026Data centres pay the ordinary electricity tax; reduced rate for data centres repealed in 2023Power tariffIn forceMinistry of Finance (letter to Stortinget)
3 Feb 2026Proposal to study a higher electricity tax rate for data centres (Dok 8:105 S) not adoptedPower tariffWithdrawnStortinget (Finance Committee)
16 Dec 2025Planned temporary national ban on new crypto-mining data centres (state planning provision)RestrictionProposedMinistry of Digitalisation and Public Governance; Ministry of Local Government
7 Oct 2025National data centre strategy 2025: a sustainable industry of the future for digital NorwayPlan or strategyIn forceMinistry of Digitalisation and Public Governance
18 Dec 2024Data centre regulation: mandatory registration with NkomRegulationIn forceMinistry of Digitalisation and Public Governance; Nkom
16 Jun 2023Surplus-heat cost-benefit analysis duty for data centres above 2 MW (Energy Act ch. 7)Efficiency ruleIn forceStortinget; Ministry of Energy

How Norway compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Morocco—27% (2024)—00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Norway100 USD/MWh (2026)96% (2025)0.01 kgCO2/kWh (2025)10
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Norway?

Yes. 1 restriction on new data centers is in force in Norway: Statnett temporary halt on new grid-connection reservations for data centres.

What does electricity cost for data centers in Norway?

The industrial electricity price in Norway was 100 USD/MWh in 2026 (SSB Q3 2026 electricity price, manufacturing excl. energy-intensive manufacturing, 104.3 øre/kWh excl. taxes and grid rent (energy only) = 1,043 NOK/MWh; converted at Norges Bank 2025 annual average 10.3912 NOK/USD (latest full-year rate). Energy-intensiv). Data center contracts can differ by voltage level, contract length and location.

How much of Norway’s electricity is renewable?

Renewables supplied 96% of electricity generation in Norway in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity does Norway have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Norway capacity

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst