Proprietary data
Corscale Data Centers
Data centers operated by Corscale that we have verified: location, status and capacity, each checked against its source.
In short
As of 16 November 2026, DC Market Insights tracks 5 data centers operated by Corscale in 2 countries, of which 1 are operational. Stated operational capacity is 72 MW, with a further 126 MW under construction and 183 MW planned. The pipeline is 4.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 5 of 5 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Corscale data centers: key facts
About Corscale
Corscale Data Centers develops, owns and operates energy-efficient hyperscale data centers in the U.S. and Europe, backed by Patrinely Group and Affinius Capital. It states 3.2+ GW of total capacity delivered or under development (sites owned or controlled at various stages). Its named campuses are Gainesville Crossing in Gainesville, Virginia (326 MW power capacity, three buildings built or under construction), Kincora VA2 in Kincora, Virginia (80 MW critical capacity, planned) and Court Lane in Iver, west of London (103 MW power capacity, planned).
- Headquarters
- Houston, United States
- Founded
- 2021
- Ownership
- Private; backed by Patrinely Group and Affinius Capital
- Parent company
- Patrinely Group, LLC (affiliate)
- Tracked footprint
- 5 facilities in 2 countries
- Website
- corscale.com
Data center business
- Gainesville Crossing Building 2 is a 72 MW facility; construction began in July 2024 and it was fully leased to an undisclosed hyperscale tenant with an expected completion date of mid-2025. Building 3 is a 54 MW facility, under construction since January 2025 and fully leased to an undisclosed client.
- Corscale has used sustainability and supply partners at Gainesville Crossing: nZero for tracking Scope 1, 2 and 3 emissions (May 2022), ZincFive nickel-zinc battery technology (June 2022) and Salute Mission Critical for veteran hiring on the first 72 MW building (December 2022).
- Gainesville Crossing Building 1 (first 72 MW, a two-story building with eight data halls of about 483,000 sq ft) broke ground in February 2022 with capital partner USAA Real Estate; the first building at the campus was completed in May 2024.
- Corscale describes itself as a company that specializes in developing, owning and operating energy-efficient, sustainable data centers for hyperscale customers. It is vertically integrated with its investment partner Affinius Capital, and its experience page says it is backed by Patrinely and Affinius Capital.
- Corscale states 3.2+ GW of total capacity delivered or under development; the footnote says these are sites owned or controlled with projects at various stages of predevelopment and/or construction. It cites a record of delivering over 125 data centers, which the footnote attributes to its affiliate Patrinely Group, LLC (40+ years developing large-scale projects).
- Gainesville Crossing in Gainesville, Prince William County, Virginia is a 130-acre master-planned campus of 2.3 million square feet with 1.1 million square feet of data center capacity powered by Dominion. The company lists 326 MW power capacity and 350+ watts per square foot. The 2022 launch release described a 300+ MW campus with 306 MW of utility power and five two-story buildings.
- Kincora VA2 in Kincora, Virginia is planned as a single 80 MW, 500,000-square-foot building on a 24-acre campus, with 80 MW critical capacity and 650 watts per square foot.
- Court Lane in Iver, west of London, UK is a planned data center with 103 MW power capacity, an on-site substation fed by National Grid and access to the M25 London Orbital Motorway. The company lists its focus markets as Northern Virginia, London, Amsterdam, Texas, Atlanta and Chicago.
Recent updates
- June 2025: Corscale appointed Erik Draaisma as Executive Vice President, Business Development (release datelined Houston, TX).
- April 2025: Corscale and Affinius Capital announced a strategic partnership with e2Companies for on-site power, targeted to initially include more than 300 MW of e2 R3Di systems over a 24-month term, tied to a $25bn development pipeline.
- January 2025: Corscale started construction of its third building at Gainesville Crossing, a 54 MW facility fully leased to an undisclosed client.
- July 2024: Corscale started construction of its second Gainesville Crossing building, a 72 MW facility fully leased to an undisclosed hyperscale tenant, after completing the first building in May 2024.
Company details checked against company and official sources, 16 Nov 2026.
- Capacity under construction or planned (309 MW) is 4.3 times the operational base of 72 MW.
- Its largest operational site is Corscale Gainesville Crossing Building 1 in Gainesville, United States at 72 MW.
- The largest project in the pipeline is Corscale Iver (Court Lane) (103 MW, planned).
- United States accounts for 73% of tracked capacity (4 facilities).
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Corscale development pipeline
Under construction and planned facilities with a stated capacity, largest first. 126 MW under construction and 183 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Corscale Iver (Court Lane)Corscale | Iver, United Kingdom | Planned | Hyperscale | 103 MW |
| Corscale Kincora VA2Corscale | Kincora, United States | Planned | Hyperscale | 80 MW |
| Corscale Gainesville Crossing Building 2Corscale | Gainesville, United States | Under construction | Hyperscale | 72 MW |
| Corscale Gainesville Crossing Building 3Corscale | Gainesville, United States | Under construction | Hyperscale | 54 MW |
Facilities
5 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Corscale Iver (Court Lane)Hyperscale | Iver, United Kingdom | Planned | 103 MW total | — | Operator / official |
| Corscale Kincora VA2Hyperscale | Kincora, United States | Planned | 80 MW IT | — | Operator / official |
Corscale Gainesville Crossing Building 1Hyperscale
History
|
Gainesville, United States | Operational | 72 MW | 2024 | Operator / official |
Corscale Gainesville Crossing Building 2Hyperscale
History
|
Gainesville, United States | Under construction | 72 MW | — | Operator / official |
| Corscale Gainesville Crossing Building 3Hyperscale | Gainesville, United States | Under construction | 54 MW | — | Operator / official |
Market position
How Corscale compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Corscale ranks #36 of 171 tracked operators by capacity, with 0.4% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In United Kingdom, Corscale ranks #17 of 54 tracked operators by capacity, with 1.2% of the country’s tracked MW.
- Gainesville also hosts 2 other tracked data center(s), run by NTT DATA and Microsoft.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Other data centers in Gainesville
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Corscale operate?
DC Market Insights tracks 5 Corscale data center(s) in 2 countries as of November 2026: 1 operational, 2 under construction and 2 planned.
Where is Corscale headquartered?
Corscale is headquartered in Houston, United States. Ownership: Private; backed by Patrinely Group and Affinius Capital.
Which other companies operate data centers in United States?
Besides Corscale, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Gainesville?
Other tracked data centers in Gainesville include NTT DATA Gainesville VA11 (NTT DATA) and MNZ07 Wellington Data Center (Microsoft).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.