As of 26 November 2026, DC Market Insights tracks 12 data centers in Poland run by 6 operators: 11 operational, 0 under construction and 1 planned. Stated operational capacity is 92 MW, with a further — under construction and 48 MW planned. Data4 holds the largest share of tracked operational capacity (65%).

12Facilities tracked
6Operators
92 MWOperational (11 sites)
—Under construction (0 sites)
48 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 6 of 12 facilities have a stated capacity; the others are counted as sites only.

WAW01 · EdgeConneX · Warsaw (approximate location)OVHcloud WAW1 · OVHcloud · Warsaw (approximate location)Vantage Warsaw (WAW1) campus · Vantage Data Centers · Warsaw (exact location) · Cooling: Chilled water, dry coolers · Owned (self-build): greenfield campus, ground broken by VantageData4 Warsaw campus (Jawczyce) · Data4 · Jawczyce (exact location)Equinix WA1 · Equinix · Warsaw (exact location)Equinix WA2 · Equinix · Warsaw (exact location)Equinix WA3 · Equinix · Warsaw (exact location)Equinix WA4x · Equinix · Warsaw (exact location)Atman WAW-1 · Atman · Warsaw (exact location)Atman WAW-2 · Atman · Warsaw (exact location)Atman WAW-3 (first building) · Atman · Ożarów Mazowiecki (exact location) · Cooling: Air or free coolingAtman KTW-1 · Atman · Katowice (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Poland data center market: key facts

  • Capacity under construction or planned (48 MW) is 0.5 times the operational base of 92 MW.
  • The three largest operators by operational capacity, Data4, Atman and Equinix, hold 100% of tracked operational MW.
  • The largest operational facility we track is Data4 Warsaw campus (Jawczyce) (Data4, Jawczyce) at 60 MW.
  • The largest project in the pipeline is Vantage Warsaw (WAW1) campus (48 MW, planned).
  • Warsaw is the largest cluster: 11 of 12 facilities and 100% of tracked capacity.
  • By type, the tracker lists 9 colocation and 3 hyperscale facilities.
  • 6 of 12 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational92 MW
Planned48 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Poland by tracked capacity, MW
Data460 MW
Atman32 MW

OperationalUnder construction or planned

Capacity by market in Poland, MW
Warsaw140 MW
Katowice0.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation9
Hyperscale3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Poland data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 27 November 2026. Government sources are linked; the full source list comes with the Excel data.

Poland is a fast-growing data center market centred on Warsaw, with Poznań, Kraków and Wrocław next. The grid operator PSE forecasts data center demand rising from about 200 MW in 2024 to 3,093 MW in 2036. Grid access is the main constraint: a 2026 Energy Law reform added PLN 60/kW connection deposits, flexible connection agreements and permit deadlines. Data centers can get Polish Investment Zone tax support, and the state backs a Baltic AI Gigafactory bid.

Power and grid

In 2025 Poland's power system had 77,331 MW installed and peak demand of 27,550 MW (URE National Report 2026). URE Raport Krajowy 2026

Renewables supplied 31.41% of electricity generated in 2025, up from 17.83% in 2020, and passed 50% of installed capacity at the end of 2025. Ministry of Climate and Environment

An Energy Law amendment of 13 March 2026 (Dz.U. 2026 poz. 516) sets a PLN 60 per kW advance payment for connection-condition applications above 1 kV and allows flexible connection agreements. Dziennik Ustaw 2026 poz. 516

Non-household users pay a capacity fee of PLN 0.2194/kWh in 2026 on energy taken 07:00-22:00 on working days; 2027 rates are set per quarter and are lower. URE Informacja 58/2025

Policy and incentives

The Ministry of Development and Technology confirms that building or expanding a data center is eligible for Polish Investment Zone support decisions and grants (reply to interpellation 17787, 8 Jul 2026). Sejm interpellation 17787 reply

A Council of Ministers resolution of July 2026 commits over PLN 400m to the EuroHPC Baltic AI Gigafactory bid; AI Factories are planned in Poznań (PIAST AI) and Kraków (Gaia, about PLN 300m). Ministry of Digital Affairs

Data centers with 500 kW or more IT load report energy performance yearly to the EU database; a draft Energy Law amendment (UC121, May 2026) would add a waste-heat cost-benefit analysis for data centers above 1 MW. Ministry of Climate and Environment

Land, sites and demand

PSE's draft transmission plan 2027-2036 names Warsaw, Poznań, Kraków and Wrocław as the leading data center locations and forecasts 5,018 MW and 29.4 TWh of data center demand by 2040.

The Digital State Strategy (9 Jun 2026) describes Poland's modern data center sector as small and lists energy costs, emissions, regulatory costs and local opposition as risks to investment. Monitor Polski 2026 poz. 620

Operators in Poland

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Atman432 MW—35%
Equinix4———
Data4160 MW—65%
EdgeConneX1———
Vantage Data Centers1—48 MW—
OVHcloud1———

Largest data center projects in Poland

Under construction and planned facilities with a stated capacity, largest first. — under construction and 48 MW planned in total.

ProjectLocationStatusTypeCapacity
Vantage Warsaw (WAW1) campusVantage Data Centers Warsaw Planned Hyperscale 48 MW

How Poland compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom207551,064 MW7,741 MW
Germany20364933 MW4,386 MW
Finland4824230 MW2,661 MW
France10920338 MW2,422 MW
Sweden4518172 MW2,510 MW
Ireland461953 MW1,458 MW
Italy2211245 MW1,193 MW
Norway228446 MW820 MW
Denmark361654.6 MW1,004 MW
Russia11121516 MW425 MW
Spain411979.4 MW815 MW
Netherlands11034217 MW449 MW

Data center deals in Poland

Our Deal Tracker lists 4 deals in Poland since July 2026, with $3.10B in disclosed value.

  • European Union (European Funds for Digital Development, FERC) → National Data Processing Center (KCPD): three connected data centres Financing $400.0M
  • Polcom → 40MW data center in Skawina Land / campus $39.5M · 40 MW
  • Centralna Grupa Energetyczna SA (CGE) and City of Konin → Konin Data Center (100MW IT first phase) Power deal · 100 MW

All Poland deals in the Deal Tracker

Facilities

12 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Data4 Warsaw campus (Jawczyce)Data4
History
  1. Operational
  2. Operational
  3. Operational
Jawczyce Operational 60 MW total — Operator / official
Vantage Warsaw (WAW1) campusVantage Data Centers Cooling: Chilled water, dry coolers · Owned (self-build): greenfield campus, ground broken by Vantage Warsaw Planned 48 MW IT — Operator / official
Atman WAW-3 (first building)Atman Cooling: Air or free cooling Ożarów Mazowiecki Operational 14.4 MW IT — Operator / official
Atman WAW-1Atman Warsaw Operational 12.1 MW IT — Operator / official
Atman WAW-2Atman Warsaw Operational 5 MW IT — Operator / official
Atman KTW-1Atman Katowice Operational 0.5 MW IT — Operator / official
Equinix WA1Equinix Warsaw Operational — — Operator / official
Equinix WA2Equinix Warsaw Operational — — Operator / official
Equinix WA3Equinix Warsaw Operational — — Operator / official
Equinix WA4xEquinix Warsaw Operational — — Operator / official
OVHcloud WAW1OVHcloud Warsaw Operational — — Operator / official
WAW01EdgeConneX Warsaw Operational — — Operator / official

Get the data

Every data center in Poland, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,497 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Poland

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Poland

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Poland?

DC Market Insights tracks 12 data centers in Poland as of November 2026: 11 operational, 0 under construction and 1 planned, run by 6 operators. The count grows as we verify more sites.

What is the data center capacity of Poland?

Tracked operational capacity in Poland is 92 MW, with — under construction and 48 MW planned. These totals use the capacity each source states (IT load where given) and cover 6 of 12 tracked facilities.

Which companies operate the most data center capacity in Poland?

By tracked operational capacity, the largest operators in Poland are Data4 (60 MW) and Atman (32 MW).

Where are the data centers in Poland located?

The largest clusters by tracked capacity are Warsaw (11 facilities) and Katowice (1 facilities). The map above shows every site.

Which new data centers are being built in Poland?

We track — under construction and 48 MW planned. The largest projects are Vantage Warsaw (WAW1) campus (48 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy