Data Center Power & Policy in Switzerland

Every government action on data centers and power in Switzerland that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 21 October 2026, DC Market Insights tracks 12 government actions on data centers and power in Switzerland, 8 of them in force. We have found no moratorium or restriction on new data centers in force in Switzerland.

12Actions tracked
8In force
240 USD/MWhIndustrial power price
70.8%Renewable share of generation

Market snapshot

Switzerland power and policy: key facts

  • Industrial electricity price: 240 USD/MWh (2026). Rank 1 of 24 tracked countries, highest first.
  • Renewable share of electricity generation: 70.8% (2025). Rank 5 of 35 tracked countries, highest first.
  • Grid emission factor: 0.13 kgCO2/kWh (2022). Rank 23 of 29 tracked countries, highest first.
  • Latest change: Swissgrid transmission tariffs cut to 1.2 Rp./kWh for 2027 (Swissgrid; ElCom, 8 Sep 2026).
  • By type: 4 regulation, 2 power tariff, 2 renewable energy and 2 efficiency rule.

Power indicators for Switzerland

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 240 USD/MWh 2026 · ElCom national median total price 2026, category C7 (large business, 7,500,000 kWh/yr, max 1,630 kW, medium voltage, own transformer), standard product in basic supply: 19.6245 Rp./kWh = 196.245 CHF/MWh (energy 11.15, grid usage 5.404, federal levies 0.57 ElCom – Median electricity tariff for Switzerland (LINDAS linked data, observation C7-standard-2026)
Renewable share of electricity generation 70.8% 2025 · Share of domestic electricity production (Landeserzeugung) 2025, computed from BFE Table 1: hydro 37.5 + renewable thermal 1.1 + other renewables (wood, biogas, PV 7.9, wind 0.2) 9.2 = 47.8 of 67.5 TWh. Nuclear 27.2%. Production share, not consumption/sup BFE – Schweizerische Elektrizitätsstatistik 2025
Grid emission factor 0.13 kgCO2/kWh 2022 · Life-cycle greenhouse gas emissions of the Swiss consumer electricity mix (Verbraucherstrommix, production plus commercial trade, average 2020-2022): 127 g CO2-eq/kWh, from the BFE report Umweltkennwerte 2024 (13 June 2024). Supplier mix based on guarante BFE – Energieetikette für Personenwagen: Umweltkennwerte 2024 der Strom- und Treibstoffbereitstellung

In force now in Switzerland

Power tariff (1)

  • Power tariffIn force

    Electricity reserve (Stromreserve) surcharge 2026: 0.41 Rp./kWh

    All consumers pay a per-kWh surcharge financing the federal electricity reserve for winter supply security (hydro reserve, reserve power plants, emergency generators), collected through Swissgrid. For 2026 ElCom reported the reserve cost at 0.41 Rp./kWh, up from 0.23 Rp./kWh in 2025, while Swissgrid cut its transmission tariff to 1.42 Rp./kWh. The surcharge applies to every kWh a data center draws from the grid.

    0.41 Rp./kWh 2025: 0.23 Rp./kWh. Excl. VAT.

    ElCom; Swissgrid · Effective 1 Jan 2026 · Ends 31 Dec 2026 · ElCom – Strompreise 2026 (Medienmitteilung, 9. September 2025)

Renewable energy (2)

  • Renewable energyIn force

    Mantelerlass second package: local electricity communities and minimum feed-in remuneration

    The second ordinance package implementing the Federal Act on a Secure Electricity Supply with Renewable Energies was adopted on 19 February 2025 and took effect on 1 January 2026. It covers, among other things, local electricity communities (LEG), which let neighbouring producers and consumers share locally generated power over the public grid, and minimum remuneration for feed-in of renewable power.

    Federal Council; SFOE (BFE) · Effective 1 Jan 2026 · Der Bundesrat – Bundesrat setzt zweites Paket des Bundesgesetzes für eine sichere Stromversorgung in Kraft

  • Renewable energyIn force

    Federal Act on a Secure Electricity Supply from Renewable Energy (Mantelerlass), first package

    The Federal Act on a Secure Electricity Supply with Renewable Energies (adopted by Parliament 29 September 2023, approved by voters 9 June 2024) amends the Energy Act and the Electricity Supply Act. The Federal Council put it into force in stages; the first package of law changes and ordinances took effect on 1 January 2025, with implementing rules specified in several ordinances on 20 November 2024.

    Federal Council; SFOE (BFE) · Effective 1 Jan 2025 · Der Bundesrat – Bundesrat setzt erstes Paket des Bundesgesetzes für eine sichere Stromversorgung in Kraft

Efficiency rule (2)

  • Efficiency ruleIn force

    Canton of Zurich waste heat rule: more than 2 GWh/yr of unused heat must be offered to third parties at cost

    § 30a para. 2 of Zurich's Special Building Ordinance I (BBV I, LS 700.21) requires that, for new buildings or after renewal of cooling plants, waste heat of more than two gigawatt hours per year that cannot be used on site must be made available to third parties at production cost. The cantonal government cites it as a rule to flag in building permits for data centers.

    2 GWh/yr waste heat Date is that of the government reply RRB 20/2024 citing the rule; the rule's own adoption date was not confirmed from a primary source.

    Canton of Zurich · Zurich · Regierungsrat des Kantons Zürich – RRB Nr. 20/2024, Anfrage Grossverbraucher Datencenter

  • Efficiency ruleIn force

    Canton of Zurich large consumer model (Grossverbrauchermodell, § 13a Energy Act)

    In the canton of Zurich, sites using more than 0.5 GWh of electricity per year count as large consumers under § 13a of the cantonal Energy Act (EnerG, LS 730.1) and must enter an efficiency procedure, typically a target agreement after one to two years of measured operation. The cantonal government confirmed in January 2024 that data centers such as the Vantage campus in Winterthur-Neuhegi fall under the model; enforcement lies with the canton or the cities of Zurich and Winterthur.

    0.5 GWh/yr electricity Threshold for large consumer status; date is that of the government reply RRB 20/2024 citing the rule.

    Canton of Zurich (Baudirektion; cities of Zurich and Winterthur) · Zurich · Regierungsrat des Kantons Zürich – RRB Nr. 20/2024, Anfrage Grossverbraucher Datencenter

Regulation (3)

  • RegulationIn force

    Revised CO2 Ordinance for 2025-2030

    On 2 April 2025 the Federal Council put the revised CO2 Ordinance into force, partly retroactively from 1 January 2025, implementing the revised CO2 Act for 2025-2030. It sets greenhouse gas reduction targets for the different sectors up to 2030 and includes support measures for companies using climate-friendly technologies.

    Federal Council; FOEN (BAFU) · Effective 1 Jan 2025 · Ends 31 Dec 2030 · Der Bundesrat – Bundesrat setzt revidierte CO2-Verordnung in Kraft

  • RegulationIn force

    Revised Federal Act on Data Protection (revFADP/nDSG)

    The totally revised Federal Act on Data Protection (DSG), the Data Protection Ordinance (DSV) and the Ordinance on Data Protection Certification (VDSZ) took effect on 1 September 2023, as decided by the Federal Council on 31 August 2022. The law sets rules on processing and cross-border disclosure of personal data; the release does not set any data localization requirement.

    Federal Council; Federal Office of Justice; FDPIC · Effective 1 Sep 2023 · Der Bundesrat – Neues Datenschutzrecht ab 1. September 2023

  • RegulationIn force

    Electricity Supply Act (StromVG): market access for sites using 100 MWh/yr or more

    Under the Federal Electricity Supply Act (StromVG, SR 734.7) only households and other end users consuming less than 100 MWh per year per consumption site are captive customers in regulated basic supply. Sites at or above 100 MWh/yr, which includes any data center, may use grid access and buy power on the free market from any supplier; grid operators must grant third-party access without discrimination (Art. 13). Text as consolidated on 13 August 2026.

    100 MWh/yr per consumption site Threshold below which end users are captive (feste Endverbraucher), Art. 6 para. 2 StromVG; Art. 13 para. 1 in force since 1 January 2009.

    Federal Assembly; ElCom (regulator) · Effective 1 Jan 2009 · Fedlex – Bundesgesetz über die Stromversorgung (StromVG), Stand 13. August 2026

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Grid accessAnnounced

    Swissgrid transmission tariffs cut to 1.2 Rp./kWh for 2027

    Transmission grid costs passed on by the TSO Swissgrid fall to 1.2 Rp./kWh in 2027 from 1.42 Rp./kWh in 2026 (1.71 Rp./kWh in 2025), according to ElCom's annual tariff release. Distribution network tariffs set by local grid operators are a larger part of the bill for large consumers connected at medium voltage.

    1.2 Rp./kWh 2026: 1.42 Rp./kWh.

    Swissgrid; ElCom · Effective 1 Jan 2027 · ElCom – Strompreise 2027 (Medienmitteilung, 8. September 2026)

  • Power tariffAnnounced

    Electricity reserve surcharge falls to 0.17 Rp./kWh for 2027

    ElCom's 2027 tariff release (8 September 2026) reports that the electricity reserve cost drops to 0.17 Rp./kWh from 0.41 Rp./kWh in 2026. The median household price falls to 26.5 Rp./kWh, about 1.2 Rp./kWh below 2026, mainly on lower energy procurement costs, while the median grid tariff rises from 10.73 to 10.94 Rp./kWh.

    0.17 Rp./kWh 2026: 0.41 Rp./kWh.

    ElCom · Effective 1 Jan 2027 · ElCom – Strompreise 2027 (Medienmitteilung, 8. September 2026)

  • Plan or strategyAnnounced

    SFOE to step up monitoring of data center electricity use and efficiency

    An SFOE/SwissEnergy study published 7 May 2026 puts Swiss data center electricity use at about 2.1 TWh in 2024, roughly 3.6% of national consumption, rising to 2.5-3.2 TWh by 2030 (up to 3.5 TWh in a high case). Remaining efficiency potential is estimated at about 0.8 TWh. The SFOE intends to monitor data center consumption and efficiency more closely in the coming years; no binding measures were announced.

    2.1 TWh (2024 data center consumption) About 3.6% of total Swiss electricity consumption in 2024.

    Swiss Federal Office of Energy (BFE/SFOE) · BFE – Rechenzentren in der Schweiz: Stromverbrauch und Effizienzpotenziale

  • RegulationProposed

    Full electricity market opening under the Switzerland-EU electricity agreement: basic-supply threshold set at 50 MWh

    With the Switzerland-EU electricity agreement, all end consumers would be able to choose their supplier. On 28 January 2026 the Federal Council fixed the threshold for regulated basic supply at 50 MWh per year per household or consumption site; today only sites above 100 MWh/yr can choose freely. The agreement and implementing law still need parliamentary approval. Large consumers such as data centers already have market access, so the main effect is a wider competitive retail market.

    50 MWh/yr per consumption site Proposed basic-supply threshold; current free-market threshold is 100 MWh/yr.

    Federal Council (UVEK, FDFA) · Der Bundesrat – Stromabkommen Schweiz-EU: Bundesrat legt Schwelle für die Grundversorgung fest

Timeline of data center and power policy in Switzerland

DateActionTypeStatusAuthority
8 Sep 2026Swissgrid transmission tariffs cut to 1.2 Rp./kWh for 2027Grid accessAnnouncedSwissgrid; ElCom
8 Sep 2026Electricity reserve surcharge falls to 0.17 Rp./kWh for 2027Power tariffAnnouncedElCom
7 May 2026SFOE to step up monitoring of data center electricity use and efficiencyPlan or strategyAnnouncedSwiss Federal Office of Energy (BFE/SFOE)
28 Jan 2026Full electricity market opening under the Switzerland-EU electricity agreement: basic-supply threshold set at 50 MWhRegulationProposedFederal Council (UVEK, FDFA)
9 Sep 2025Electricity reserve (Stromreserve) surcharge 2026: 0.41 Rp./kWhPower tariffIn forceElCom; Swissgrid
2 Apr 2025Revised CO2 Ordinance for 2025-2030RegulationIn forceFederal Council; FOEN (BAFU)
19 Feb 2025Mantelerlass second package: local electricity communities and minimum feed-in remunerationRenewable energyIn forceFederal Council; SFOE (BFE)
20 Nov 2024Federal Act on a Secure Electricity Supply from Renewable Energy (Mantelerlass), first packageRenewable energyIn forceFederal Council; SFOE (BFE)
10 Jan 2024Canton of Zurich waste heat rule: more than 2 GWh/yr of unused heat must be offered to third parties at cost ZurichEfficiency ruleIn forceCanton of Zurich
10 Jan 2024Canton of Zurich large consumer model (Grossverbrauchermodell, § 13a Energy Act) ZurichEfficiency ruleIn forceCanton of Zurich (Baudirektion; cities of Zurich and Winterthur)
31 Aug 2022Revised Federal Act on Data Protection (revFADP/nDSG)RegulationIn forceFederal Council; Federal Office of Justice; FDPIC
23 Mar 2007Electricity Supply Act (StromVG): market access for sites using 100 MWh/yr or moreRegulationIn forceFederal Assembly; ElCom (regulator)

How Switzerland compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)20
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Peru—62.6% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—00
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10

Questions

Is there a data center moratorium in Switzerland?

We have found no moratorium or restriction on new data centers in force in Switzerland as of 21 October 2026. Proposed or announced measures, if any, are listed in the timeline.

What does electricity cost for data centers in Switzerland?

The industrial electricity price in Switzerland was 240 USD/MWh in 2026 (ElCom national median total price 2026, category C7 (large business, 7,500,000 kWh/yr, max 1,630 kW, medium voltage, own transformer), standard product in basic supply: 19.6245 Rp./kWh = 196.245 CHF/MWh (energy 11.15, grid usage 5.404, federal levies 0.57). Data center contracts can differ by voltage level, contract length and location.

How much of Switzerland’s electricity is renewable?

Renewables supplied 70.8% of electricity generation in Switzerland in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst