Proprietary data

Data Center Power & Policy in Paraguay

Every government action on data centers and power in Paraguay that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 22 October 2026, DC Market Insights tracks 10 government actions on data centers and power in Paraguay, 8 of them in force. Paraguay has 1 restriction on new data centers in force: Law 7300/2024 on electricity theft for crypto mining (up to 10 years prison, asset seizure). 2 incentive schemes apply, including Law 7547/2025 Maquila Regime (adds service maquila; 1% single tax).

10Actions tracked
8In force
33.0 USD/MWhIndustrial power price
—Renewable share of generation

Market snapshot

Paraguay power and policy: key facts

  • Industrial electricity price: 33.0 USD/MWh (2026). Rank 27 of 27 tracked countries, highest first.
  • Latest change: Decrees 5306/2026 and 5307/2026: special electricity tariff for 'convergent industries' (AI, cloud, data centers) repealed (Presidencia de la República, 9 Jun 2026).
  • By type: 4 power tariff, 2 incentive, 1 renewable energy and 1 regulation.

Power indicators for Paraguay

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 33.0 USD/MWh 2026 · USD/MWh as stated (approx., at the exchange rate) by the ANDE president for Atome's 220 kV supply under Pliego 21. Official Pliego 21 cat. 620 (220 kV): 165.4 PYG/kWh off-peak, 232.4 peak, plus 31,033 PYG/kW-month; no BCP rate retrieved, so not converted.

In force now in Paraguay

Restriction (1)

  • RestrictionIn force

    Law 7300/2024 on electricity theft for crypto mining (up to 10 years prison, asset seizure)

    Law 7300/2024 protects the integrity of the electricity system and amends Article 173 of the Penal Code: taking electricity from installations above 1,000 V, or with the intention of crypto-asset mining or similar activity, is punishable by up to ten years in prison. Seized equipment can be assigned to ANDE and proceeds from early sale go to ANDE.

    Congreso Nacional / Poder Ejecutivo · Effective 19 Jul 2024 · BACN, Ley N 7300/2024

Power tariff (3)

  • Power tariffIn force

    ANDE Pliego de Tarifas N 21 (updated November 2024): very-high-voltage 220 kV tariff

    ANDE's general tariff schedule (Pliego 21, approved by Decreto 6904/2017, updated version November 2024). Category 620 (220 kV, station or substation supply): reserved power 31,033 PYG/kW-month, peak energy 232.4 PYG/kWh, off-peak energy 165.4 PYG/kWh. Data-processing, crypto mining and data center users at 220/66/23 kV are moved to the Special Intensive Consumption Group (numeral 4.12.8).

    165.4 PYG/kWh Off-peak energy charge, category 620 (220 kV). Peak 232.4 PYG/kWh; reserved power 31,033 PYG/kW-month. Read from an Internet Archive copy of the ANDE URL (site unreachable 22 Oct 2026).

    Administración Nacional de Electricidad (ANDE) · ANDE, Pliego de Tarifas N 21, Versión Actualizada 27-11-2024

  • Power tariffIn force

    ANDE Resolution P/N 49238: Special Intensive Consumption Group (GCIE) tariff for crypto mining and data centers

    ANDE updated the tariffs of the Grupo de Consumo Intensivo Especial, which covers users that process data or provide storage services, including crypto mining, blockchain, tokens and data centers, supplied at 220 kV, 66 kV and 23 kV. Users must sign a Special Supply Contract (term capped at 31 Dec 2027); supplies with a monthly load factor of 80% or more for two billing cycles are presumed to belong to the group and are regularised with a fine. Contract conditions may be reconsidered for data centers that show their computing is not for crypto/token generation and hold a CONATEL licence, with MITIC verification.

    Administración Nacional de Electricidad (ANDE) · Ends 31 Dec 2027 · ANDE, Anexo a la Resolución P/N 49238 (GCIE tariff update)

  • Power tariffIn force

    Itaipú unit cost of electricity service (CUSE) fixed at USD 19.28/kW-month for 2024-2026

    Itaipú Binacional set the CUSE for 2024-2026 at USD 19.28/kW-month, up 15.4% from USD 16.71. Itaipú power is ANDE's main supply cost and drove the 2024 GCIE tariff update. The same announcement said the revision of Annex C of the Itaipú Treaty would start soon; the basis from 2027 depends on that binational process.

    19.28 USD/kW-month

    Itaipú Binacional (Consejo de Administración) · Effective 1 Jan 2024 · Ends 31 Dec 2026 · Itaipú Binacional, news 09/05/2024

Incentive (2)

  • IncentiveIn force

    Law 7547/2025 Maquila Regime (adds service maquila; 1% single tax)

    Law 7547/2025 replaces the 1997 maquila law and covers service maquila delivered to a foreign company using ICT or other remote means. Maquila contracts and programme activities pay a single tax of 1% on value added; Law 1064/1997 provisions are repealed 12 months after entry into force.

    1 % single tax on value added

    Congreso Nacional / MIC (CNIME) · Effective 8 Sep 2025 · BACN, Ley N 7547/2025

  • IncentiveIn force

    Law 523/1995 Free Zones regime (0.5% single tax on exports)

    Law 523/1995 authorises free zones under fiscal and customs control. Users exporting to third countries pay a single 'Impuesto de Zona Franca' of 0.5% of gross export revenue. Services beyond those listed can be authorised by the Executive if aimed at the international market.

    0.5 % of gross export revenue

    Congreso Nacional / Consejo Nacional de Zonas Francas · BACN, Ley N 523

Renewable energy (1)

  • Renewable energyIn force

    Law 7599/2025 modernising the regime for non-hydro renewable electricity (repeals Law 6977/2023)

    Law 7599/2025 promotes generation and use of electricity from non-conventional, non-hydro renewables. Self-generators up to 1 MW only register; ANDE must take surplus up to 1 MW. A Large Consumer has maximum demand of 30 MW or more; generators and self-generators may sell to Large Consumers under sale contracts with transport/toll charges. ANDE may sign supply contracts up to 30 years via international tenders. Projects may use Law 60/90 and Law 523/95 incentives.

    Congreso Nacional · Effective 12 Dec 2025 · BACN, Ley N 7599/2025

Plan or strategy (1)

  • Plan or strategyIn force

    Decree 2553/2024: National Energy Policy of Paraguay to 2050 (repeals Decree 6092/2016)

    Decree 2553 approves the National Energy Policy to 2050 prepared under the Vice-Ministry of Mines and Energy (MOPC), replacing the 2040 policy of Decree 6092/2016. It aims at energy security with self-supply, efficiency and minimum cost, use of national sources (hydro, bioenergy, other alternatives), and consolidating Paraguay as a hub of regional energy integration.

    Presidencia de la República / MOPC – Viceministerio de Minas y Energía · MOPC VMME, Decreto N 2553/2024

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • RegulationAnnounced

    Law 7593/2025 on Personal Data Protection (in force November 2027)

    Comprehensive personal data protection law for public and private entities. Creates the National Personal Data Protection Agency within MITIC. International transfers are allowed only to destinations with adequate protection or with appropriate safeguards. The law enters into force 24 months after publication (published 27 Nov 2025).

    Congreso Nacional / MITIC · Effective 27 Nov 2027 · BACN, Ley N 7593/2025

Timeline of data center and power policy in Paraguay

DateActionTypeStatusAuthority
9 Jun 2026Decrees 5306/2026 and 5307/2026: special electricity tariff for 'convergent industries' (AI, cloud, data centers) repealedPower tariffWithdrawnPresidencia de la República
7 Dec 2025Law 7599/2025 modernising the regime for non-hydro renewable electricity (repeals Law 6977/2023)Renewable energyIn forceCongreso Nacional
27 Nov 2025Law 7593/2025 on Personal Data Protection (in force November 2027)RegulationAnnouncedCongreso Nacional / MITIC
8 Sep 2025Law 7547/2025 Maquila Regime (adds service maquila; 1% single tax)IncentiveIn forceCongreso Nacional / MIC (CNIME)
27 Nov 2024ANDE Pliego de Tarifas N 21 (updated November 2024): very-high-voltage 220 kV tariffPower tariffIn forceAdministración Nacional de Electricidad (ANDE)
19 Sep 2024Decree 2553/2024: National Energy Policy of Paraguay to 2050 (repeals Decree 6092/2016)Plan or strategyIn forcePresidencia de la República / MOPC – Viceministerio de Minas y Energía
19 Jul 2024Law 7300/2024 on electricity theft for crypto mining (up to 10 years prison, asset seizure)RestrictionIn forceCongreso Nacional / Poder Ejecutivo
26 Jun 2024ANDE Resolution P/N 49238: Special Intensive Consumption Group (GCIE) tariff for crypto mining and data centersPower tariffIn forceAdministración Nacional de Electricidad (ANDE)
9 May 2024Itaipú unit cost of electricity service (CUSE) fixed at USD 19.28/kW-month for 2024-2026Power tariffIn forceItaipú Binacional (Consejo de Administración)
16 Jan 1995Law 523/1995 Free Zones regime (0.5% single tax on exports)IncentiveIn forceCongreso Nacional / Consejo Nacional de Zonas Francas

How Paraguay compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)20
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)05
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)00
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—00
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10

Questions

Is there a data center moratorium in Paraguay?

Yes. 1 restriction on new data centers is in force in Paraguay: Law 7300/2024 on electricity theft for crypto mining (up to 10 years prison, asset seizure).

What incentives does Paraguay offer data centers?

In force: Law 7547/2025 Maquila Regime (adds service maquila; 1% single tax) and Law 523/1995 Free Zones regime (0.5% single tax on exports). Each is listed with its authority and dates on this page.

What does electricity cost for data centers in Paraguay?

The industrial electricity price in Paraguay was 33.0 USD/MWh in 2026 (USD/MWh as stated (approx., at the exchange rate) by the ANDE president for Atome's 220 kV supply under Pliego 21. Official Pliego 21 cat. 620 (220 kV): 165.4 PYG/kWh off-peak, 232.4 peak, plus 31,033 PYG/kW-month; no BCP rate retrieved, so not converted.). Data center contracts can differ by voltage level, contract length and location.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst